← Back
Office with commercial, 7-19 stories
111 WEST 19 STREET
MANHATTAN · BIN 1014730
💬 Discuss this project
1901Year Built
8Stories
O6Building Class
C6-3AZoning
165,513 sfGross Floor Area
8Units
LL97 Covered3 Open Violations ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 19TH STREET OWNER LLC · 18,400 sf lot · 9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 82p · 1 filing · 10 docs
Floor 7Under Construction127p · 3 filings · 20 docs
Floor 6Under Construction13p · 3 filings · 20 docs
Floor 5
Floor 4
Floor 319p · 4 filings · 19 docs
Floor 2
Floor 11p · 1 filing · 4 docs
Mezzanine2p · 1 filing · 4 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAUFMAN MANAGEMENT COMPANY10508/29/2026
19TH STREET OWNER LLC203/22/2026
19 STREET ASSOCIATES2203/22/2026
19TH STREET ASSOCIATES9003/22/2026
19 STREET ASSOCIATES/KAUF103/22/2026
WEST 19TH STREET ASSOCIAT203/22/2026
OWNER OF 118 W 20 ST103/22/2026
19ST ASSOC MR. REID303/22/2026
19 ST. ASSOCS.203/22/2026
10 ST. ASSOCS.103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS2803/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIGGS SERVICES LLCGeneral Contractor1107/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor707/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor707/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
ARCHSTONE BUILDERS LLCGeneral Contractor307/08/2026
NATIONWIDE MECHANICAL INCFire Protection307/08/2026
A&A PLUMBING CORPPlumbing207/08/2026
PSI PARTNERS, LLCFire Protection207/08/2026
FORMCRAFT INTERIORS INCGeneral Contractor107/08/2026
MANHATTAN MECHANICAL SERVGeneral Contractor107/08/2026
MARLIN MECHANICAL INCGeneral Contractor104/09/2026
BARRY SAXEElectrical103/21/2026
IMPACT PLUMBING INCPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
EFRAIM ALTERElectrical103/21/2026
KATZ MICHAELElectrical103/21/2026
MICHAEL KATZElectrical103/21/2026
RADOS MILOJKOVICElectrical103/21/2026
SPEEDWAY PLUMBING CORPFire Protection107/08/2026
AINSWORTH INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC6781505/18/2026
MJ ENGINEERING & DESIGN5546112/22/2025
JACK GREEN ASSOCIATES4221009/03/2025
ENTHINK ENGINEERS LLC6247105/11/2022
Building Lifecycle
All (212)Filed (39)Permit Issued (35)Signed Off (19)Facade (FISP) (12)Violation (60)Inspection (15)Objection (2)Special Inspection (30)
07/08/2026
Signed off — Alteration
Tenant improvement to existing office space at this location. No change in use, egress, or occupancy under this application.
M01320820-I1
06/11/2026
Permit issued — Structural
M01313268-S5-ST
05/27/2026
Signed off — Alteration
M01380254-I1
05/18/2026
Filed — Alteration
STRUCTURAL WORK TO 6TH AND 7TH FLOOR FOR 'RIPPLE' AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01313268-S5
04/15/2026
Filed — Alteration
M01380254-I1
04/15/2026
Permit issued — Suspended Scaffold
M01380254-I1-SC
04/06/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Ari Kamo
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
Ari Kamo
04/06/2026
Special inspection requirement — Structural Steel - Details
Ari Kamo
04/06/2026
Special inspection requirement — Final
Ari Kamo
04/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Ari Kamo
04/06/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
04/06/2026
Special inspection requirement — Sprayed fire-resistant materials
Ari Kamo
04/06/2026
Special inspection requirement — Structural Steel - Welding
Ari Kamo
02/11/2026
Permit issued — General Construction
M01320820-I1-GC
01/12/2026
Permit issued — Sprinklers
M01313268-S1-EW-SP
01/05/2026
Permit issued — Structural
M01313268-S4-ST
12/29/2025
Filed — Alteration
STRUCTURAL WORK TO 6TH AND 7TH FLOOR FOR 'RIPPLE' AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01313268-S4
12/23/2025
Permit issued — Mechanical Systems
M01313268-S3-MS
12/22/2025
Filed — Alteration
Tenant improvement to existing office space at this location. No change in use, egress, or occupancy under this application.
M01320820-I1
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
12/22/2025
Special inspection requirement — Final
Gregory Ralph
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
12/22/2025
Special inspection requirement — Lighting controls
Magdy Youssef
12/22/2025
Special inspection requirement — Interior lighting power
Magdy Youssef
12/18/2025
Permit issued — Plumbing
M01313268-S2-PL
12/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Ari Kamo
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
12/18/2025
Special inspection requirement — Structural Steel - Welding
Ari Kamo
12/17/2025
Special inspection requirement — Structural Steel - Details
Ari Kamo
12/17/2025
Special inspection requirement — Final
Ari Kamo
12/14/2025
Filed — Alteration
STRUCTURAL WORK TO 6TH AND 7TH FLOOR FOR 'RIPPLE' AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01313268-S1
12/14/2025
Filed — Alteration
STRUCTURAL WORK TO 6TH AND 7TH FLOOR FOR 'RIPPLE' AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01313268-S3
12/14/2025
Filed — Alteration
STRUCTURAL WORK TO 6TH AND 7TH FLOOR FOR 'RIPPLE' AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01313268-S2
12/10/2025
Special inspection requirement — Maintenance information
Michael McSweeney
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
12/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael McSweeney
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
12/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael McSweeney
12/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael McSweeney
12/10/2025
Special inspection requirement — Shutoff dampers
Michael McSweeney
12/08/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
12/08/2025
Special inspection requirement — Final
Ari Kamo
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
12/01/2025
Permit issued — General Construction
M01313268-I1-GC
11/20/2025
Filed — Alteration
STRUCTURAL WORK TO 6TH AND 7TH FLOOR FOR 'RIPPLE' AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01313268-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/09/2025
Permit issued — General Construction
M01137526-S1-GC
09/03/2025
Filed — Alteration
M01137526-S1
06/05/2025
Signed off — Alteration
mechanical work for "ripple" as per plans filed herewith. no change to use, egress or occupancy.
M00994778-S4
05/05/2025
Filed — Alteration
mechanical work for "ripple" as per plans filed herewith. no change to use, egress or occupancy.
M00994778-P6
04/30/2025
Signed off — Alteration
mechanical work for "ripple" as per plans filed herewith. no change to use, egress or occupancy.
M00994778-S3
04/29/2025
Filed — Alteration
mechanical work for "ripple" as per plans filed herewith. no change to use, egress or occupancy.
M00994778-P5
04/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2025
Signed off — Alteration
mechanical work for "ripple" as per plans filed herewith. no change to use, egress or occupancy.
M00994778-S2
11/22/2024
Permit issued — Mechanical Systems
M01137526-I1-MS
11/19/2024
Filed — Alteration
M01137526-I1
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedBENCHMARK BUILDERS LLC06/11/2026
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC04/15/2026
DOB NOWGeneral ConstructionSigned-offFORMCRAFT INTERIORS INC02/11/2026
DOB NOWSprinklersPermit IssuedMORA FIRE PROTECTION LLC01/12/2026
DOB NOWStructuralPermit IssuedBENCHMARK BUILDERS LLC01/05/2026
DOB NOWMechanical SystemsPermit IssuedMARLIN MECHANICAL INC12/23/2025
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP12/18/2025
DOB NOWGeneral ConstructionPermit IssuedBENCHMARK BUILDERS LLC12/01/2025
DOB NOWGeneral ConstructionPermit IssuedBRIGGS SERVICES LLC09/09/2025
DOB NOWMechanical SystemsSigned-offBRIGGS SERVICES LLC11/22/2024
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC05/31/2024
DOB NOWMechanical SystemsSigned-offAINSWORTH INC05/08/2024
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC04/29/2024
DOB NOWPlumbingSigned-offA&A PLUMBING CORP04/18/2024
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC03/26/2024
DOB NOWGeneral ConstructionSigned-offBRIGGS SERVICES LLC02/23/2024
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC02/20/2024
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC02/20/2024
DOB NOWSprinklersSigned-offSPEEDWAY PLUMBING CORP01/29/2024
DOB NOWPlumbingSigned-offIMPACT PLUMBING INC01/10/2024
DOB NOWMechanical SystemsSigned-offBRIGGS SERVICES LLC01/08/2024
DOB NOWGeneral ConstructionSigned-offBRIGGS SERVICES LLC01/05/2024
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC07/14/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/11/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/11/2022
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC12/09/2021
DOB NOWMechanical SystemsPermit IssuedARCHSTONE BUILDERS LLC12/08/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC12/03/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/03/2021
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC11/16/2021
DOB NOWMechanical SystemsSigned-offMANHATTAN MECHANICAL SERV08/18/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/26/2018
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC07/26/2018
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC05/11/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC04/25/2018
BIS—ISSUEDBRIGGS SERVICES LLC04/03/2024
BISOTISSUEDTRANSPARENT CONSTRUCTION06/06/2019
BISOTISSUEDTRANSPARENT CONSTRUCTION06/06/2019
BISMHISSUEDTRANSPARENT CONSTRUCTION06/06/2019
BISOTISSUEDTRANSPARENT CONSTRUCTION04/13/2019
+ 45 more permits on file
2 projects · most recent 05/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Permit IssuedBENCHMARK BUILDERS LLCAir Conditioning Systems
Cooling
Vertiv PX011/MCS2028E1 3 tons · Crac Unit ×1
05/07/2020Signed-offMANHATTAN MECHANICAL SERVAir Conditioning Systems
Cooling
Johnson Controls J25ZJC00S2C6BCD1L1 25 tons · Rooftop Unit ×1
J25ZJC00SC26BCD1L1 25 tons · Rooftop Unit ×1
2 projects · most recent 05/18/2026
FiledStatusContractorScope
05/18/2026Permit IssuedPSI PARTNERS, LLC94 heads
11/04/2021Permit IssuedNATIONWIDE MECHANICAL INC21 heads
1 project · most recent 05/18/2026
Water/Sanitary
FiledStatusContractorScope
05/18/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
9 projects · most recent 07/30/2026
General Wiring Lighting
FiledStatusContractorScope
07/30/2026CompleteL.E.A. ELECTRIC CORP.General Wiring
04/10/2024CompleteL.E.A. ELECTRIC CORP.General Wiring
01/04/2024CompleteSALVATORE CAMPISI & SONSGeneral Wiring
05/09/2022CompleteBOROWIDE ELECT'L CONTR'S—
11/30/2021CompleteBOROWIDE ELECT'L CONTR'S—
11/15/2021Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
03/28/2019CompleteSALVATORE CAMPISI & SONSGeneral Wiring, Lighting
03/26/2019CompleteNEW YORK CITY ELECTRIC INGeneral Wiring
04/12/2018CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 05/18/2026
Steel Concrete
FiledStatusContractorScope
05/18/2026Permit IssuedBENCHMARK BUILDERS LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/15/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
02/14/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
04/06/2026FinalAri Kamoprogress
04/06/2026Structural Stability – Alterations of existing buildingsAri Kamospecial
04/06/2026Structural Steel - DetailsAri Kamospecial
04/06/2026Mastic and Intumescent Fire-resistant CoatingsAri Kamospecial
04/06/2026Post-installed AnchorsAri Kamospecial
04/06/2026Sprayed fire-resistant materialsAri Kamospecial
04/06/2026Structural Steel - High Strength BoltingAri Kamospecial
04/06/2026Structural Steel - WeldingAri Kamospecial
04/06/2026Concrete - Cast-In-PlaceAri Kamospecial
12/22/2025FinalGregory Ralphprogress
12/22/2025Energy Code Compliance InspectionsMagdy Youssefprogress
12/22/2025Lighting controlsMagdy Youssefenergy_progress
12/22/2025Interior lighting powerMagdy Youssefenergy_progress
12/22/2025Fire-Resistant Penetrations and JointsMagdy Youssefspecial
12/18/2025Structural Steel - WeldingAri Kamospecial
12/18/2025Structural Stability – Alterations of existing buildingsAri Kamospecial
12/18/2025Structural Steel - High Strength BoltingAri Kamospecial
12/17/2025FinalAri Kamoprogress
12/17/2025Structural Steel - DetailsAri Kamospecial
12/10/2025Maintenance informationMichael McSweeneyenergy_progress
12/10/2025Fire-Resistant Penetrations and JointsAri Kamospecial
12/10/2025Fire-Resistant Penetrations and JointsAri Kamospecial
12/10/2025Shutoff dampersMichael McSweeneyenergy_progress
12/10/2025HVAC-R and service water heating system controlsMichael McSweeneyenergy_progress
12/10/2025HVAC-R and service water piping design and insulationMichael McSweeneyenergy_progress
Latest 25 of 119.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
TeadsOfficeFloor 3
Project M01320820 Alteration · LOC Issued · 12/22/2025
RippleOfficeFloors 6, 7
Project M01313268 Alteration · Permit Entire · 11/20/2025
Project M00994778 Alteration · LOC Issued · 02/15/2024
Kleinfeld BridalRetailCellar, Floor 1, Mezzanine
Project M01004551 Alteration · LOC Issued · 02/20/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 888 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch38
09/06/2026M00037392-I1Request digital key ↗
09/06/2026M00042431-I1Request digital key ↗
09/03/2026M00617833-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00341864-I1Request digital key ↗
▸Applications & Permits138
▸BISPLAN / WORK APPROVAL APPLICATION84
07/30/2024123576861Open ↗
07/08/2024103958308Open ↗
07/03/2024103958308Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION53
04/03/2024103958308Open ↗
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
Showing 3 of 53 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/21/2023103958308Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications286
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION102
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/29/2026M00994778-P2Open ↗
09/27/2026M00994778-P6Open ↗
09/27/2026M00994778-P6Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/06/2026M00037392-I1Open ↗
09/03/2026M00639397-I1Open ↗
09/02/2026M00730108-I1Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT38
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
06/07/2019123898201Open ↗
01/09/2019123526005Open ↗
06/28/2018123380224Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/27/2026M00994778-P6Open ↗
09/27/2026M00994778-P6Open ↗
09/23/2026M01313268-S1Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment39
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
04/25/2019123380224Open ↗
04/24/2019123380224Open ↗
05/25/2018123419648Open ↗
Showing 3 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
01/15/2019123304236Open ↗
Showing 1 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN BOILER VIOLATION - AFFIDAVIT ATTACHED1
12/22/2024103958308Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLTION OF OPEN BOILER VIOLATIONS - AFFIDAVIT ATTACHED1
07/23/2024103958308Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
06/21/2022123380224Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/21/2022123380224Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos77
▸BISASBESTOS: CERTIFICATION (DEP ACP5)38
06/07/2019123898201Open ↗
01/09/2019123526005Open ↗
07/02/2018123576861Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
08/28/2026M01004551-I1Open ↗
08/26/2026M00994778-P6Open ↗
08/26/2026M00994778-P5Open ↗
Showing 3 of 31 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance76
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS47
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
Showing 3 of 47 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
01/15/2021123898201Open ↗
04/01/2019123526005Open ↗
01/31/2019123419648Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/12/2022123380224Open ↗
06/21/2022123380224Open ↗
01/15/2021123898201Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/21/2022123380224Open ↗
▸BISLIGHTING CONTROLS1
06/21/2022123380224Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
06/21/2022123380224Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/21/2022123380224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00994778-S4Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/21/2022123380224Open ↗
02/18/2022123380224Open ↗
01/15/2021123898201Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
06/21/2022123380224Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/21/2022123380224Open ↗
▸Approvals, Objections & Sign-offs44
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
01/15/2021123898201Open ↗
07/24/2019103987731Open ↗
04/01/2019123526005Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
07/08/2024103958308Open ↗
07/03/2024103958308Open ↗
Showing 2 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
06/21/2022123380224Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
04/03/2024103958308Open ↗
▸Cost, Insurance & Ownership86
▸BISCOST AFFIDAVIT85
01/15/2021123898201Open ↗
07/24/2019103987731Open ↗
06/07/2019123898201Open ↗
Showing 3 of 85 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/21/2022123380224Open ↗
▸Filing & Intake Forms81
▸BISEFILING COVER SHEET50
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
06/07/2019123898201Open ↗
Showing 3 of 50 on file for this type
▸BISBOROUGH INTAKE FORM20
04/03/2024103958308Open ↗
05/06/2020122976887Open ↗
07/24/2019103987731Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION8
03/21/2024103958308Open ↗
04/25/2019123380224Open ↗
10/25/2018123380224Open ↗
Showing 3 of 8 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00994778-P6Open ↗
▸Other Documents5
▸DOB NOWCalculations2
08/13/2026M01380254-I1Open ↗
08/13/2026M01052470-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01380254-I1Open ↗
08/13/2026M01052470-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type