← Back
BuildNYC
Elevator apt, semi-fireproof without stores
111 WOODRUFF AVENUE
BROOKLYN · BIN 3115914
💬 Discuss this project
1960Year Built
—Stories
D1Building Class
R7AZoning
39,312 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized31 Active Violations 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 111 Woodruff Owner NF · 17,573 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 5A6p · 1 filing · 4 docs
Floor 4Unit 4D, Unit 4E, Unit 4F +114p · 4 filings · 20 docs
Floor 3Unit 3A, Unit 3B3p · 1 filing · 4 docs
Floor 2Unit 2B, Unit 2C2p · 1 filing · 4 docs
Floor 1Tenant protection scaffold5p · 1 filing · 3 docs
Site & exteriorHeavy duty sidewalk shed installation3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
111 Woodruff Owner2203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2018$13.8M—AMNER, LTD. → 111 WOODRUFF OWNER LLC$352/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Volume Space Consulting107/18/2024
Rise Architecture NJ412/15/2021
Rise Architecture201/13/2020
Haider Engineering, P.E.105/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates603/21/2026
Haider Engineering, P.E.103/21/2026
Green Studio203/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Lime Stone BuildersGeneral Contractor603/21/2026
Clean Tech MechanicalPlumbing507/08/2026
Building MaintenanceGeneral Contractor403/21/2026
P.H. WorksPlumbing407/08/2026
HKS ConstructionScaffold303/21/2026
C E BuildersGeneral Contractor303/21/2026
New York City PrimeScaffold303/21/2026
J G Construction ServicesGeneral Contractor103/21/2026
N.Z. Pilgrim ElectricElectrical103/21/2026
Hazi ConstructionGeneral Contractor208/23/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312512/15/2021
Sia Inspections7306101/13/2020
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/01/2026
Elevator Category 1 inspection report filed
09/01/2026
Elevator Category 5 inspection report filed
01/28/2026
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOTWATER ABOVE 130 DEGREES IN THE BATHROOM LOCATED AT APT 7F, 6th STORY,…
HPD violation · closed
01/28/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 7F, 6th STORY, 1st APARTMENT FROM…
HPD violation · closed
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offNew York City Prime07/23/2024
DOB NOWPlumbingSigned-offClean Tech Mechanical12/30/2021
DOB NOWGeneral ConstructionSigned-offLime Stone Builders11/05/2021
DOB NOWGeneral ConstructionSigned-offLime Stone Builders11/04/2021
DOB NOWPlumbingSigned-offP.H. Works01/16/2020
DOB NOWPlumbingSigned-offP.H. Works01/04/2020
DOB NOWSupported ScaffoldSigned-offHKS Construction05/26/2018
BISOTISSUEDC and E Builders02/24/2020
BISOTISSUEDC and E Builders02/24/2020
BISOTISSUEDC and E Builders01/27/2020
BISOTISSUEDC and E Builders12/02/2019
BISOTISSUEDC and E Builders07/01/2019
BISPLISSUEDP.H. Works02/26/2019
BISPLISSUEDP.H. Works02/26/2019
BISOTISSUEDBuilding Maintenance02/21/2019
BISOTISSUEDBuilding Maintenance02/21/2019
BISOTISSUEDBuilding Maintenance01/24/2019
BISOTISSUEDBuilding Maintenance01/24/2019
BISOTISSUEDHazi Construction08/23/2018
BISOTISSUEDHazi Construction05/09/2018
BISEQISSUEDJ & G Construction Services03/20/2018
BISEQISSUEDJ & G GNRL07/14/2016
2 projects · most recent 04/11/2025
General Wiring
FiledStatusContractorScope
04/11/2025CompleteN.Z. Pilgrim ElectricGeneral Wiring
03/27/2019Permit IssuedS&F Electrical ServiceGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/16/2021Fire-Resistant Penetrations and JointsJeff Akermanspecial
12/09/2021Fire-Resistant Penetrations and JointsJeff Akermanspecial
10/18/2021Fire-Resistant Penetrations and JointsJeff Akermanspecial
10/18/2021FinalJeff Akermanprogress
10/18/2021Energy Code Compliance InspectionsJeff Akermanprogress
10/18/2021Fire-Resistance Rated ConstructionJeff Akermanprogress
10/18/2021Lighting in dwelling unitsJeff Akermanenergy_progress
10/18/2021Insulation placement and R valuesJeff Akermanenergy_progress
236 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account