| Owner | Filings | Most Recent |
|---|---|---|
| CHATHAM | 25 | 07/08/2026 |
| AAC REALTY | 17 | 07/08/2026 |
| ROBIN BARON DESIGN | 9 | 07/08/2026 |
| GUARDIAN CONTRACTING AND CONSTRUCTI | 6 | 07/08/2026 |
| THE CHATHAM CONDOMINIUM ASSOC. | 50 | 03/22/2026 |
| 300 EAST 74 OWNERS | 7 | 03/22/2026 |
| STEEL SYSTEMS | 1 | 03/22/2026 |
| GUARDIAN CONT & CONST LLC | 3 | 03/22/2026 |
| GAP | 3 | 03/22/2026 |
| STEVEN BIRBACH MANAGEMENT | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MQ CONSULTING | 2 | 06/12/2026 |
| MICHAEL PATINO ARCHITECTURE, PLLC | 1 | 06/12/2026 |
| DESIMONE CONSULTING ENGINEERING | 2 | 10/10/2025 |
| BODNAR ARCHITECT PC | 6 | 07/09/2025 |
| TWIG CONSULTING ENGINEERS PC | 3 | 07/01/2025 |
| VENTROP ENGINEERING CONSULTING GROU | 3 | 05/01/2025 |
| KOHLER RONAN, LLC | 3 | 04/15/2025 |
| CSANAD BODNAR ARCHITECT | 2 | 11/04/2024 |
| LAWLESS & MANGIONE | 5 | 09/13/2024 |
| ENGINEERED DESIGN GROUP | 2 | 09/04/2024 |
| THEODORE YEN | 1 | 08/08/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 07/02/2024 |
| MSM ENGINEERING SERVICES, PLLC | 2 | 04/16/2024 |
| SOCOTEC, INC. | 1 | 04/10/2024 |
| OMER FENIK, RA | 4 | 01/31/2024 |
| FRANCISCO D PEREZ PE | 2 | 01/09/2024 |
| JBA | 3 | 11/29/2023 |
| ROBERT A.M. STERN ARCHITECTS LLP | 1 | 10/05/2023 |
| ENTHINK ENGINEERS LLC | 2 | 09/12/2023 |
| JENNIFER LAURA SHOUKIMAS, RA | 3 | 05/12/2023 |
| R. MORGAN ROLONTZ ARCHITECTURE P.C. | 3 | 05/02/2023 |
| VINCENT J. LIOTTA P.E. | 1 | 04/25/2023 |
| CES ENGINEERING LLC | 2 | 02/22/2023 |
| OI ARCHITECTURE + DESIGN PLLC | 1 | 01/30/2023 |
| MICHAEL MUROFF ARCHITECT LLC | 1 | 05/31/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| BRIDGE EXPEDITING | 4 | 03/21/2026 |
| RELATED COMPANIES | 3 | 03/21/2026 |
| IOAD | 4 | 03/21/2026 |
| PEROTTO CONSULTING MANAGEMENT | 4 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 6 | 03/21/2026 |
| KC EXPEDITING | 6 | 03/21/2026 |
| KUSHNER STUDIOS | 6 | 03/21/2026 |
| PS ENGINEERS | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| FRIEDMAN ASSOCIATES II | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EVEREST SCAFFOLDING INC | General Contractor | 11 | 07/08/2026 |
| SAGEWOOD CONSTRUCTION & D | General Contractor | 10 | 07/08/2026 |
| UBERTO, LTD | General Contractor | 8 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 7 | 07/08/2026 |
| CUSTOM COMMERCIAL CONSTRUCTION | General Contractor | 5 | 07/08/2026 |
| COOLING CONTROLS CORP | General Contractor | 5 | 07/08/2026 |
| KC EXPEDITING INC | General Contractor | 5 | 07/08/2026 |
| UNITED BROTHERS PRO CONST | General Contractor | 4 | 04/09/2026 |
| RENOVATION PARTNERS INC | General Contractor | 4 | 07/08/2026 |
| NATIONAL MAINTENANCE | Scaffold | 4 | 07/08/2026 |
| GUARDIAN CONTRACTING.AND | General Contractor | 4 | 07/08/2026 |
| POWER COOLING INC | General Contractor | 4 | 03/21/2026 |
| DEMAJ 2 LLC | General Contractor | 3 | 03/21/2026 |
| KSW MECHANICAL,LLC | General Contractor | 3 | 03/21/2026 |
| AMERICAN FIRE RESTORATION | General Contractor | 3 | 03/21/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 3 | 07/08/2026 |
| SPECTRA CONSTR & DEV CORP | General Contractor | 2 | 07/08/2026 |
| RALLY RESTORATION CORP | General Contractor | 2 | 03/21/2026 |
| DEMAR PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| LICO CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| LINKED MECHANICAL LLC | General Contractor | 2 | 03/21/2026 |
| WARD PIPING COMPANY INC | Fire Protection | 2 | 07/08/2026 |
| DNA PLUMBING CONTR. INC | Fire Protection | 2 | 07/08/2026 |
| INTEGKRAL DESIGN & CONSTRUCTION | General Contractor | 2 | 07/08/2026 |
| HITE CONSTRUCTION INC | General Contractor | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MICHAEL PATINO ARCHITECTU | 8170 | 3 | 06/12/2026 |
| DESIMONE CONSULTING ENGIN | 5942 | 2 | 10/10/2025 |
| TWIG SPECIAL INSPECTIONS | 885 | 2 | 07/01/2025 |
| GREGORY V. PEROTTO, P.E. | 947 | 3 | 05/01/2025 |
| GRANT ENGINEERING | 2627 | 3 | 04/15/2025 |
| CBA | 5091 | 2 | 11/04/2024 |
| WORLD DESIGN ARCHITECTURE | 9323 | 3 | 09/04/2024 |
| AMARACON TESTING & INSPEC | 5842 | 1 | 08/08/2024 |
| KZ ENGINEERING, P.C. | 4665 | 1 | 07/02/2024 |
| DOYUN KIM; RA | 7415 | 2 | 05/24/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | UBERTO, LTD | 07/06/2026 |
| DOB NOW | Plumbing | Permit Issued | ORBIT PLBG & HTG INC | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | UBERTO, LTD | 06/17/2026 |
| DOB NOW | Structural | Signed-off | STRUCTURAL PRESERV SYSTEM | 09/25/2025 |
| DOB NOW | General Construction | Permit Issued | UNITED BROTHERS PRO CONST | 03/06/2025 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 02/26/2025 |
| DOB NOW | General Construction | Signed-off | POWER COOLING INC | 01/27/2025 |
| DOB NOW | Plumbing | Signed-off | CENTRIC PLBG & HTG | 01/07/2025 |
| DOB NOW | General Construction | Signed-off | ARI GROUP | 12/13/2024 |
| DOB NOW | General Construction | Permit Issued | UNITED BROTHERS PRO CONST | 12/13/2024 |
| DOB NOW | General Construction | Signed-off | UBERTO, LTD | 10/11/2024 |
| DOB NOW | General Construction | Permit Issued | KC EXPEDITING INC | 09/19/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | KC EXPEDITING INC | 09/19/2024 |
| DOB NOW | Sprinklers | Permit Issued | CASINO PLMBG & HTG CORP | 09/16/2024 |
| DOB NOW | Plumbing | Permit Issued | FLAVIO MECHANICAL CORP | 08/30/2024 |
| DOB NOW | General Construction | Permit Issued | SPECTRA CONSTR & DEV CORP | 08/12/2024 |
| DOB NOW | Plumbing | Signed-off | FRANKIE PLBG & HTG L.L.C | 07/15/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | RALLY RESTORATION CORP | 07/02/2024 |
| DOB NOW | Plumbing | Permit Issued | HYDRO MECHANICAL INC | 06/10/2024 |
| DOB NOW | Plumbing | Permit Issued | JAG PLUMBING & MECHANICAL | 05/30/2024 |
| DOB NOW | General Construction | Signed-off | RALLY RESTORATION CORP | 05/15/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | RALLY RESTORATION CORP | 05/10/2024 |
| DOB NOW | General Construction | Signed-off | JBUILD LLC | 04/30/2024 |
| DOB NOW | General Construction | Permit Issued | DEMAJ 2 LLC | 04/16/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | RALLY RESTORATION CORP | 04/09/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 04/05/2024 |
| DOB NOW | Plumbing | Signed-off | FRANKIE PLBG & HTG L.L.C | 03/14/2024 |
| DOB NOW | General Construction | Permit Issued | JBUILD LLC | 03/07/2024 |
| DOB NOW | Mechanical Systems | Signed-off | POWER COOLING INC | 03/04/2024 |
| DOB NOW | General Construction | Permit Issued | SPECTRA CONSTR & DEV CORP | 02/29/2024 |
| DOB NOW | Mechanical Systems | Signed-off | UBERTO, LTD | 02/09/2024 |
| DOB NOW | General Construction | Permit Issued | KC EXPEDITING INC | 12/13/2023 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 11/13/2023 |
| DOB NOW | Mechanical Systems | Signed-off | UBERTO, LTD | 11/09/2023 |
| DOB NOW | General Construction | Signed-off | UBERTO, LTD | 11/09/2023 |
| DOB NOW | Supported Scaffold | Signed-off | TRIBUTE RESTORATION INC | 10/23/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | KC EXPEDITING INC | 10/11/2023 |
| DOB NOW | Structural | Signed-off | KC EXPEDITING INC | 10/11/2023 |
| DOB NOW | General Construction | Signed-off | SAGEWOOD CONSTRUCTION & D | 09/27/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 09/26/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/12/2026 | Permit Issued | UBERTO, LTD | Heating and Air Conditioning Systems | Heat / Cool Carrier 42SGS04AOYADPC 15,475 BTU · Ahu ×3 42CGB06B*GYECY 15,352 BTU · Ahu ×1 42SGS06AOYADPC 21,004 BTU · Ahu ×1 42SGS06AOYDCPC 21,004 BTU · Ahu ×1 |
| 07/01/2025 | Permit Issued | EMPIRE GROUP NYC LLC | Associated Ducts and Piping | Ducts & Piping __Junk__ 00000 Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2025 | Signed-off | DNA PLUMBING CONTR. INC | — |
| 09/04/2024 | Permit Issued | CASINO PLMBG & HTG CORP | 154 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/12/2026 | Permit Issued | ORBIT PLBG & HTG INC | Gas, Water/Sanitary |
| 07/09/2025 | Signed-off | FRANKIE PLBG & HTG L.L.C | Gas, Water/Sanitary |
| 07/01/2025 | Signed-off | TAP PLUMBING CORP | Water/Sanitary |
| 05/01/2025 | Permit Issued | PUMPING SOL PLBG & MECH I | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/05/2026 | Permit Issued | EINSTEIN ELEC'L CORP | — |
| 06/09/2026 | Complete | CENTURY ELECTRIC LLC | General Wiring |
| 05/24/2025 | Complete | CONTACT PLUS ELEC'L CORP | General Wiring |
| 01/07/2025 | Complete | AMSTERDAM ELECTRIC CORP | General Wiring |
| 07/18/2024 | Permit Issued | K & G ELECTRIC CO., INC | General Wiring |
| 05/13/2024 | Complete | CONDUCTOR ELECL SVCS INC | General Wiring |
| 05/02/2024 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 04/22/2024 | Complete | HV ELECTRIC CORP | General Wiring |
| 04/03/2024 | Permit Issued | CUNNINGHAM ELECTRIC CORP | General Wiring |
| 02/16/2024 | Complete | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 12/11/2023 | Permit Issued | TRI-POWER ELECTRICAL LLC | General Wiring |
| 11/29/2023 | Complete | EINSTEIN ELEC'L CORP | — |
| 10/31/2023 | Complete | EINSTEIN ELEC'L CORP | — |
| 10/31/2023 | Complete | EINSTEIN ELEC'L CORP | General Wiring |
| 08/14/2023 | Complete | R-2 ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/10/2025 | Signed-off | STRUCTURAL PRESERV SYSTEM | Concrete |
| 12/29/2019 | Signed-off | KC EXPEDITING INC | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/30/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/21/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/24/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/04/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/06/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/24/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/31/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/18/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/29/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/26/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/19/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/17/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 11/05/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/02/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/22/2026 | Duct leakage testing, insulation and design | Michael Patino | energy_progress |
| 04/22/2026 | HVAC-R and service water heating system controls | Michael Patino | energy_progress |
| 04/22/2026 | HVAC-R and service water heating equipment | Michael Patino | energy_progress |
| 04/22/2026 | Maintenance information | Michael Patino | energy_progress |
| 04/22/2026 | Energy Code Compliance Inspections | Michael Patino | progress |
| 04/20/2026 | Mechanical Systems | Michael Patino | special |
| 04/20/2026 | Final | Michael Patino | progress |
| 10/10/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Borys Hayda | special |
| 10/10/2025 | Final | Borys Hayda | progress |
| 10/10/2025 | Concrete - Cast-In-Place | Borys Hayda | special |
| 10/10/2025 | Structural Stability – Alterations of existing buildings | Borys Hayda | special |
| 09/26/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Borys Hayda | special |
| 09/26/2025 | Final | Borys Hayda | progress |
| 09/26/2025 | Structural Stability – Alterations of existing buildings | Borys Hayda | special |
| 09/26/2025 | Concrete - Cast-In-Place | Borys Hayda | special |
| 05/06/2025 | HVAC-R and service water heating system controls | Gregory Perotto | energy_progress |
| 05/06/2025 | HVAC-R and service water heating equipment | Gregory Perotto | energy_progress |
| 05/06/2025 | Maintenance information | Gregory Perotto | energy_progress |
| 05/06/2025 | HVAC-R and service water piping design and insulation | Gregory Perotto | energy_progress |
| 05/06/2025 | Tenant Protection Plan Compliance | Gregory Perotto | special |
| 05/01/2025 | Maintenance information | Gregory Perotto | energy_progress |
| 05/01/2025 | HVAC-R and service water heating equipment | Gregory Perotto | energy_progress |
| 05/01/2025 | Tenant Protection Plan Compliance | Gregory Perotto | special |
| 05/01/2025 | HVAC-R and service water heating system controls | Gregory Perotto | energy_progress |
| 05/01/2025 | HVAC-R and service water piping design and insulation | Gregory Perotto | energy_progress |