← Back
Elevator apt, semi-fireproof without stores
The Manhattan Belle Condominium
1110 MANHATTAN AVENUE · BIN 3063764
💬 Discuss this project
1931Year Built
6Stories
D1Building Class
R7AZoning
8,857 sfGross Floor Area
6Units
0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1110 MANHATTAN GROUP LLC · 2,500 sf lot · 3.54 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof27p · 1 filing · 20 docs
Floor 624p · 1 filing · 20 docs
Floor 523p · 1 filing · 20 docs
Floor 423p · 1 filing · 20 docs
Floor 324p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 124p · 1 filing · 20 docs
Cellar28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1110 MANHATTAN GROUP503/22/2026
EMPIRE BUILDERS GROUP NY703/22/2026
EMPIRE BUILDINGS GROUP NY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/18/2023$2.9M—Private party → 1110 MANHATTAN GROUP LLC$322/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO603/11/2026
A&D ENGINEERING, PLLC506/20/2025
R & O ENGINEERING606/10/2024
KNF SERVICES CROP209/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO703/21/2026
ADVANCED BUILDERS SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE BUILDERS GROUP NYGeneral Contractor1907/08/2026
KISHAN PLUMBING INCPlumbing307/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161503/11/2026
Building Lifecycle
All (183)Filed (19)Permit Issued (21)Signed Off (11)Violation (14)Inspection (8)Objection (80)Special Inspection (30)
06/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-I1
03/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-P9
03/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/09/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
03/09/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
03/09/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/09/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/09/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/09/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/09/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/09/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
03/09/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/09/2026
Special inspection requirement — Lowest Floor Elevation
FAHAD FATEH
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/09/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/09/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/09/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
03/09/2026
Special inspection requirement — Metering
FAHAD FATEH
11/25/2025
Signed off — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
B00940735-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S6
09/28/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S5
08/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S1
08/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S2
08/05/2025
Permit issued — Sprinklers
B08033032-S6-EW-SP
08/05/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/30/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S4
07/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/01/2025
Objection raised — Cost
07/01/2025
Objection raised — Cost
06/26/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S3
06/23/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S8
06/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-P7
06/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-P6
06/19/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-S7
06/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-P8
06/10/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
06/10/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/10/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
06/10/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/10/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/10/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
05/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK TYPE FILED SUBSEQUENT TO APPLICATION #B08033032-I1.
B08033032-P5
03/18/2025
Permit issued — Plumbing
B08033032-S5-PL
03/10/2025
Signed off — Alteration
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
B00940745-I1
03/07/2025
Permit issued — General Construction
B08033032-I1-GC
02/27/2025
Permit issued — General Construction
B08033032-I1-GC
02/03/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/05/2025
DOB NOWPlumbingSigned-offN AND S PLUMBING INC03/18/2025
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY03/07/2025
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY02/27/2025
DOB NOWMechanical SystemsSigned-offEMPIRE BUILDERS GROUP NY01/28/2025
DOB NOWPlumbingSigned-offN AND S PLUMBING INC01/27/2025
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY01/27/2025
DOB NOWSupported ScaffoldSigned-offEMPIRE BUILDERS GROUP NY10/01/2024
DOB NOWSidewalk ShedSigned-offEMPIRE BUILDERS GROUP NY10/01/2024
DOB NOWConstruction FenceSigned-offEMPIRE BUILDERS GROUP NY09/17/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL06/17/2024
DOB NOWMechanical SystemsSigned-offEMPIRE BUILDERS GROUP NY01/30/2024
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY01/29/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC01/19/2024
DOB NOWStructuralSigned-offEMPIRE BUILDERS GROUP NY10/24/2023
DOB NOWFoundationSigned-offEMPIRE BUILDERS GROUP NY10/12/2023
DOB NOWSupported ScaffoldSigned-offEMPIRE BUILDERS GROUP NY10/11/2023
DOB NOWSupport of ExcavationSigned-offEMPIRE BUILDERS GROUP NY10/10/2023
DOB NOWSidewalk ShedSigned-offEMPIRE BUILDERS GROUP NY10/05/2023
DOB NOWFoundationSigned-offEMPIRE BUILDERS GROUP NY09/27/2023
DOB NOWConstruction FenceSigned-offEMPIRE BUILDERS GROUP NY09/21/2023
BISPLISSUEDPRACTICAL PLBG & HTG INC09/26/2018
BISOTISSUEDOMEGA CONSTR GROUP INC09/25/2018
BISOTISSUEDE&J ALL SEASONS CONSTRUCT03/16/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/11/2016
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/06/2014
BISPLISSUEDWAGNER-WEINTRAUB PLUMB & HEAT EN03/03/1997
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS02/25/1997
1 project · most recent 03/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026Permit IssuedEMPIRE BUILDERS GROUP NYHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-HPR48M-230V0 4 tons · Heat Pump Outdoor ×3
CH-HPR48M-230VO 4 tons · Heat Pump Outdoor ×2
CH-HPR09-230VO 9,000 CFM · Heat Pump Outdoor ×1
CH-HPR55M-230VO 2 tons · Heat Pump Outdoor ×1
Mitsubishi Electric MXZ-SM36NAMHZ 5 tons · Heat Pump Outdoor ×1
Ventilation
Panasonic FV-0511VQ1 80 CFM · Exhaust Fan ×1
Renewaire BR130 80 CFM · Erv ×1
1 project · most recent 03/11/2026
Sprinkler System
FiledStatusContractorScope
03/11/2026Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 03/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/11/2026Signed-offKISHAN PLUMBING INCStorm, Water/Sanitary
3 projects · most recent 09/20/2025
General Wiring
FiledStatusContractorScope
09/20/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
04/06/2024CompleteTF ELECTRICAL CORPGeneral Wiring
09/25/2020CompleteCRESCO ELECTRICAL CORP1 meters, 1 new_meters
1 project · most recent 03/11/2026
Concrete
FiledStatusContractorScope
03/11/2026Signed-offDYNAMIC PLBNG & SPRKR CORConcrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/05/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
03/09/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/09/2026Air barrier — testing FAHAD FATEHenergy_progress
03/09/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
03/09/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/09/2026Maintenance informationFAHAD FATEHenergy_progress
03/09/2026MeteringFAHAD FATEHenergy_progress
03/09/2026Lighting controlsFAHAD FATEHenergy_progress
03/09/2026Interior lighting powerFAHAD FATEHenergy_progress
03/09/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/09/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/09/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/09/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/09/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/09/2026Fenestration areasFAHAD FATEHenergy_progress
03/09/2026Exterior lighting powerFAHAD FATEHenergy_progress
03/09/2026Lowest Floor ElevationFAHAD FATEHprogress
03/09/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/09/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/09/2026Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
03/09/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
07/22/2025Sprinkler SystemsFAHAD FATEHspecial
06/10/2025Lowest Floor ElevationFAHAD FATEHprogress
06/10/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
06/10/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/10/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
Latest 25 of 133.
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/26/2026B00940745-I1Request digital key ↗
08/26/2026B00940735-I1Request digital key ↗
08/24/2026B08033032-P6Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
02/27/2026300613799Open ↗
02/27/2026300613799Open ↗
02/01/2024340878526Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
09/27/2018321774059Open ↗
03/23/2017321396468Open ↗
03/14/2016320812180Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
04/25/2025322118383Open ↗
04/25/2025322118383Open ↗
01/25/2019321774059Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
02/06/2024340878526Open ↗
04/13/2023340878526Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B08033032-P5Open ↗
08/13/2026B08033032-I1Open ↗
08/13/2026B08033032-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B08033032-P9Open ↗
08/13/2026B08033032-P8Open ↗
08/13/2026B08033032-P5Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/25/2025322118383Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/25/2025322118383Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/25/2025322118383Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/25/2025322118383Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08033032-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026B00940745-I1Open ↗
08/24/2026B08033032-P6Open ↗
08/24/2026B08033032-P5Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
08/31/2026B08033032-P5Open ↗
08/31/2026B08033032-P5Open ↗
08/31/2026B08033032-P5Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026B08033032-S7Open ↗
09/02/2026B08033032-S7Open ↗
08/31/2026B08033032-P5Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/22/2019321774059Open ↗
02/21/2019321774059Open ↗
09/26/2018321774059Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/04/2016321396468Open ↗
08/21/2014320812180Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/13/2023340878526Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/04/2016321396468Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B08033032-P3Open ↗
08/13/2026B08033032-P5Open ↗
08/13/2026B08033032-P8Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
04/13/2023340878526Open ↗
08/31/2018321774059Open ↗
▸BISTenant Protection Plan and Notes1
06/22/2018321774059Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/06/2024340878526Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08033032-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08033032-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08033032-I1Open ↗
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/24/2026B08033032-P5Open ↗
08/24/2026B08033032-S4Open ↗
08/24/2026B08033032-P9Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWOER: Notice to Proceed12
08/13/2026B08033032-S8Open ↗
08/13/2026B08033032-I1Open ↗
08/13/2026B08033032-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/24/2026B08033032-I1Open ↗
08/13/2026B08033032-S2Open ↗
08/13/2026B08033032-S5Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
02/06/2024340878526Open ↗
08/31/2018321774059Open ↗
10/13/2016321396468Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/31/2018321774059Open ↗
08/21/2014320812180Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/22/2019321774059Open ↗
02/27/2019321774059Open ↗
02/21/2019321774059Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
02/21/2019321774059Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/13/2026B08033032-S8Open ↗
08/13/2026B08033032-S7Open ↗
08/13/2026B08033032-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B08033032-S1Open ↗
08/13/2026B08033032-S8Open ↗
08/13/2026B08033032-S7Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/22/2019321774059Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLETTERS - SUPPORTING DOCUMENTATION7
04/25/2025322118383Open ↗
04/25/2025322118383Open ↗
04/25/2025322118383Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/22/2019321774059Open ↗
02/27/2019321774059Open ↗
02/21/2019321774059Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/21/2014320812180Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
02/21/2019321774059Open ↗
08/31/2018321774059Open ↗
08/30/2018321774059Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET5
04/29/2025322118383Open ↗
08/30/2018321774059Open ↗
06/22/2018321774059Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
01/30/2019321774059Open ↗
08/03/2018321774059Open ↗
07/27/2018321774059Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
03/22/2019321774059Open ↗
02/27/2019321774059Open ↗
02/21/2019321774059Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/13/2023340878526Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial5
08/13/2026B08033032-P3Open ↗
08/13/2026B08033032-P8Open ↗
08/13/2026B08033032-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B08033032-P9Open ↗
08/13/2026B08033032-P8Open ↗
08/13/2026B08033032-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026B08033032-P5Open ↗
08/24/2026B08033032-P3Open ↗
08/24/2026B08033032-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
02/06/2024340878526Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/02/2017321396468Open ↗
▸BISPLOT DIAGRAM1
04/25/2025322118383Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08033032-S7Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08033032-I1Open ↗