← Back
BuildNYC
Elevator cooperative
1111 PARK AVENUE
MANHATTAN · BIN 1048136
💬 Discuss this project
1925Year Built
14Stories
D4Building Class
R10Zoning
207,542 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1111 PK Ave Realty · 18,771 sf lot · 11.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMasonry, sill, terracotta, and roof replacement1 filing
RoofPlywood enclosure around pipe scaffold1p · 1 filing · 3 docs
Floor 13Unit 13A, Unit 13B, Unit 13J4p · 7 filings · 20 docs
Floor 12
Floor 11Unit 11D3 filings
Floor 10Unit 10A, Unit 10C, Unit 10D +14p · 11 filings · 6 docs
Floor 9Unit 9, Unit 9A, Unit 9D8p · 5 filings · 6 docs
Floor 8Unit 8A4p · 3 filings · 6 docs
Floor 7Unit 7D1p · 2 filings · 6 docs
Floor 6
Floor 5Unit 5E4p · 2 filings · 6 docs
Floor 4Unit 4A1 filing · 6 docs
Floor 3Unit 3C7p · 2 filings · 11 docs
Floor 2
Floor 1Heavy Duty Pipe Scaffold1p · 1 filing · 3 docs
CellarLaundry renovationUnder Construction1p · 3 filings · 20 docs
Site & exteriorTemporary supported sidewalk shed installation5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1111 Park Avenue Realty13903/22/2026
1111 Park Ave Owners403/21/2026
1111 Park Ave Realty Douglas Ell203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants803/21/2026
Ioad403/21/2026
Lloyd Noel Building Consultant503/21/2026
Rethy Associates803/21/2026
Jme Building Consulting603/21/2026
Hlzae203/21/2026
KM Associates of New York1303/21/2026
Sol Building Consulting Services503/21/2026
Direct Access Expediting203/21/2026
Code603/21/2026
Synergy Building Consultants103/21/2026
Steven Michael Peterson Studios203/21/2026
Nyccode603/21/2026
K & M Associates1303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Avarga ConstructionScaffold1007/08/2026
FanukaGeneral Contractor807/08/2026
Spring ScaffoldingGeneral Contractor603/21/2026
Rose CarpentryGeneral Contractor503/21/2026
West New York Restoration of CTScaffold507/08/2026
Fanukaspecialty_contractor407/08/2026
Golds PlumbingPlumbing407/08/2026
Pami Constructionspecialty_contractor407/08/2026
J J Johnson GCGeneral Contractor403/21/2026
Alphacraft Constructionspecialty_contractor407/08/2026
Ceprine ConstructionScaffold303/21/2026
Hudson Plumbing & MCHPlumbing307/08/2026
NY Interior Renovation Group IGeneral Contractor303/21/2026
Fanukaspecialty_contractor303/21/2026
Structure Venturesspecialty_contractor303/21/2026
Alphacraft ConstructionGeneral Contractor207/08/2026
Alca RenovationsGeneral Contractor207/08/2026
AM G WaterproofingGeneral Contractor203/21/2026
Avarga ConstructionGeneral Contractor207/08/2026
Pami ConstructionGeneral Contractor203/21/2026
Renovated Home 1General Contractor203/21/2026
Signature Audio DesignGeneral Contractor203/21/2026
Structure VenturesGeneral Contractor203/21/2026
T C Browne andGeneral Contractor203/21/2026
West New York RestorationGeneral Contractor203/21/2026
Henry Myers P HPlumbing203/21/2026
Donato PlumbingPlumbing207/08/2026
Everyday MechanicalPlumbing207/08/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Premier Flow Plumbing and HeatingPlumbing207/08/2026
Asa Building MaintenanceGeneral Contractor103/21/2026
Poler ContractingGeneral Contractor103/21/2026
Puma ConstructionGeneral Contractor103/21/2026
Authentic PlumbingPlumbing107/08/2026
Riconda MaintenanceGeneral Contractor103/21/2026
Amsterdam Rest ConstructionGeneral Contractor103/21/2026
Delta-Sigma MechanicalPlumbing107/08/2026
Soup to Nuts Conts Corp T A FounGeneral Contractor103/21/2026
Velocity Plumbing & HeatingPlumbing107/08/2026
P.H. WorksPlumbing107/08/2026
K & G ElectricElectrical103/22/2026
Abr Plumbing & Heating ContractingPlumbing103/21/2026
CC Controlled PlumbingPlumbing103/21/2026
DonatoPlumbing103/21/2026
Dunham Piping HeatingPlumbing103/21/2026
G Bassolino PlumbingPlumbing103/21/2026
Golds Plumbing & HeatingPlumbing103/21/2026
Gregg NY PlumbingPlumbing107/08/2026
Hydro MechanicalPlumbing103/21/2026
M Burton P HPlumbing103/21/2026
N K Plumbing & HeatingPlumbing103/21/2026
RM ElectricElectrical103/22/2026
Power Surge ElectricElectrical103/22/2026
Alca Renovationsspecialty_contractor107/08/2026
OM ElectricElectrical103/22/2026
NY City ElectricElectrical103/22/2026
Hamilton Air Companyspecialty_contractor107/08/2026
JGR Groupspecialty_contractor107/08/2026
NY Interior Renovation Group Ispecialty_contractor107/08/2026
Montgomery Electrical ContractingElectrical103/22/2026
DelucGeneral Contractor103/21/2026
Dicarlo KitchenGeneral Contractor103/21/2026
E Sow ConstructionGeneral Contractor107/08/2026
Everest ScaffoldingGeneral Contractor103/21/2026
C C Controlled CombustionGeneral Contractor103/21/2026
HamiltonairGeneral Contractor103/21/2026
Hamilton Air CompanyGeneral Contractor103/21/2026
Hesco ConstructionGeneral Contractor103/21/2026
JGR GroupGeneral Contractor103/21/2026
KS Renovation GroupGeneral Contractor103/21/2026
Liebhaber ConstructionGeneral Contractor103/21/2026
Mastey Construction Co IGeneral Contractor103/21/2026
9 J BuilderGeneral Contractor210/06/2011
9J BuildersGeneral Contractor112/14/2009
Abigail H. Hess InteriorsGeneral Contractor112/30/2002
Absolute Plumbing & HeatingPlumbing107/10/1996
CN RenovationGeneral Contractor108/18/1999
Danica PLG and HeatingPlumbing110/22/1997
Dartom ConstructionGeneral Contractor405/01/2019
Dewees-ME;;ORGeneral Contractor108/19/1997
Flytiger P & HPlumbing209/08/2010
Galicja Plumbing and HeatingPlumbing107/07/2017
Hag Plumbing & HeatingPlumbing109/28/2005
Held BrothersPlumbing108/30/1999
Hydrokinetic Plumbing & Heating IPlumbing109/26/2018
Iceberg MechanicalGeneral Contractor112/20/2013
Kin Chi PLG & Heating CoprPlumbing112/29/1997
Lma GroupGeneral Contractor107/24/2009
MW WoodcraftGeneral Contractor106/10/2004
Neptune MechanicalPlumbing112/27/2002
Neptune MechanicalPlumbing105/26/2004
NK Plumbing HeatPlumbing105/17/2001
Painting PlusGeneral Contractor110/15/1998
Paint. Plus ConstructionGeneral Contractor105/27/2003
Peter DI Natale & Associates IGeneral Contractor512/31/2018
Practical Plumbing & HeatingPlumbing308/11/2015
Profile ContractingGeneral Contractor205/05/2004
Profile ControGeneral Contractor105/05/2004
Pro Star Plumbing and HeatingPlumbing106/10/2003
Royal Flush PLG & HeatingPlumbing107/08/1999
S. DonadicGeneral Contractor108/19/2011
SDS LeonardGeneral Contractor111/20/2020
S.K. Piping & HeatingPlumbing108/26/2010
S.O.S. Pluimbing & HeatingPlumbing104/24/2001
The Evon Evista GroupGeneral Contractor110/22/1997
Tommaso GarzianoPlumbing112/08/2010
United RestGeneral Contractor212/12/2001
Z.W. Plumbing & HeatingPlumbing107/02/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CBA5091311/17/2026
Jack Green Associates4221107/09/2026
Ryan Special Engineering2018506/30/2025
AK Engineering678204/23/2024
Outsource Special Inspection2827504/16/2024
Howard L Zimmerman1712211/03/2023
Crosscheck Inspection Services544510/03/2023
Rmba3937212/20/2022
CES Engineering1277106/23/2021
Fsi Architecture354112/14/2020
A2 Architecture2736112/02/2020
Katz Architecture1371311/30/2020
L+L Architecture4798112/13/2019
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/17/2026
Filed — Alteration
INSTALLATION OF NEW HEATING AND AIR CONDITIONING SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01489705-I1
11/17/2026
Filed — Alteration
MODIFICATION TO THE PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01489707-I1
11/17/2026
Filed — Alteration
COMBINATION AND INTERIOR RENOVATION OF EXISTING APARTMENTS 10J & 11D OCCUPYING PART OF THE 10TH & 11TH FLOORS. PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01485616-I1
10/19/2026
Signed off — Alteration
Various Plumbing Fixture & Piping Changes, Relocate Gas Dryer on Extended Existing Piping & Replace/Relocate Existing Gas Range With New Gas Cooktop on New Roughing Within Apartment # 13B
M00285272-I1
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAuthentic Plumbing06/03/2026
DOB NOWGeneral ConstructionPermit IssuedE Sow Construction05/05/2026
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/12/2025
DOB NOWPlumbingSigned-offHudson Plumbing & MCH09/23/2025
DOB NOWSuspended ScaffoldSigned-offAvarga Construction09/22/2025
DOB NOWGeneral ConstructionSigned-offAlca Renovations09/10/2025
DOB NOWMechanical SystemsSigned-offStructure Ventures02/13/2025
DOB NOWGeneral ConstructionSigned-offAvarga Construction12/20/2024
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/20/2024
DOB NOWSidewalk ShedSigned-offAvarga Construction08/19/2024
DOB NOWSupported ScaffoldSigned-offAvarga Construction08/17/2024
DOB NOWMechanical SystemsSigned-offAlca Renovations08/07/2024
DOB NOWGeneral ConstructionSigned-offAlca Renovations08/07/2024
DOB NOWSuspended ScaffoldSigned-offAvarga Construction05/06/2024
DOB NOWSuspended ScaffoldPermit IssuedAvarga Construction04/16/2024
DOB NOWSuspended ScaffoldSigned-offAvarga Construction03/25/2024
DOB NOWGeneral ConstructionSigned-offAlphacraft Construction01/23/2024
DOB NOWGeneral ConstructionSigned-offAlphacraft Construction01/22/2024
DOB NOWGeneral ConstructionSigned-offAvarga Construction12/21/2023
DOB NOWSidewalk ShedSigned-offAvarga Construction08/16/2023
DOB NOWSupported ScaffoldSigned-offAvarga Construction08/16/2023
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical05/17/2023
DOB NOWPlumbingSigned-offVelocity Plumbing & Heating04/18/2023
DOB NOWGeneral ConstructionSigned-offAlphacraft Construction03/31/2023
DOB NOWMechanical SystemsSigned-offAlphacraft Construction03/29/2023
DOB NOWMechanical SystemsSigned-offNY Interior Renovation Group I02/09/2023
DOB NOWGeneral ConstructionSigned-offNY Interior Renovation Group I01/27/2023
DOB NOWPlumbingSigned-offP.H. Works01/20/2023
DOB NOWPlumbingSigned-offDonato Plumbing09/02/2022
DOB NOWMechanical SystemsSigned-offFanuka09/01/2022
DOB NOWGeneral ConstructionSigned-offFanuka09/01/2022
DOB NOWMechanical SystemsSigned-offFanuka03/07/2022
DOB NOWGeneral ConstructionSigned-offFanuka03/07/2022
DOB NOWGeneral ConstructionSigned-offFanuka02/11/2022
DOB NOWMechanical SystemsSigned-offFanuka12/02/2021
DOB NOWGeneral ConstructionSigned-offFanuka12/02/2021
DOB NOWMechanical SystemsSigned-offFanuka08/26/2021
DOB NOWGeneral ConstructionSigned-offFanuka08/18/2021
DOB NOWPlumbingSigned-offDonato Plumbing08/16/2021
DOB NOWPlumbingPermit IssuedGolds Plumbing06/14/2021
+ 60 more permits on file
1 project · most recent 11/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
11/17/2026——Heating and Air Conditioning Systems
2 projects · most recent 11/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/17/2026——Gas, Water/Sanitary
07/09/2026Signed-offGolds PlumbingGas, Water/Sanitary
25 projects · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026CompleteTM Select ElectricGeneral Wiring
10/27/2025Permit IssuedLina ElectricGeneral Wiring
06/19/2025CompleteGRX Euro ElectricGeneral Wiring
09/27/2023Permit IssuedHigh Quality Electric—
07/06/2023CompleteNY City ElectricGeneral Wiring
05/25/2023CompleteNY City ElectricGeneral Wiring
04/14/2023CancelledPower Surge ElectricGeneral Wiring
01/25/2023CancelledPrime ElectricalGeneral Wiring
09/06/2022Permit IssuedMartin DorkinGeneral Wiring
08/25/2022Permit IssuedMartin DorkinGeneral Wiring
12/13/2021CompleteOM Electric—
11/24/2021CompletePos Electrical Contractors—
10/11/2021CompleteEis Electric Corp DbaGeneral Wiring
06/28/2021CompleteUpdate Systems ElectricalGeneral Wiring
06/03/2021Permit IssuedUpdate Systems Electrical—
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
07/09/2026Fire-Resistant Penetrations and JointsJACK GREENspecial
07/09/2026Energy Code Compliance InspectionsJACK GREENprogress
07/09/2026HVAC insulation and sealing JACK GREENenergy_progress
07/06/2026Energy Code Compliance InspectionsJACK GREENprogress
07/06/2026HVAC insulation and sealing JACK GREENenergy_progress
07/06/2026Fire-Resistant Penetrations and JointsJACK GREENspecial
12/01/2025Tenant Protection Plan ComplianceCSANAD BODNARspecial
11/24/2025Fire-Resistant Penetrations and JointsCSANAD BODNARspecial
06/23/2025HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
06/23/2025Energy Code Compliance InspectionsWilliam Ryanprogress
06/23/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
04/15/2025HVAC and service water heating equipment JACK GREENenergy_progress
04/15/2025HVAC insulation and sealing JACK GREENenergy_progress
04/15/2025HVAC and service water heating system controls JACK GREENenergy_progress
04/15/2025Maintenance informationJACK GREENenergy_progress
04/15/2025Mechanical SystemsJACK GREENspecial
04/15/2025Energy Code Compliance InspectionsJACK GREENprogress
04/15/2025FinalJACK GREENprogress
03/12/2025HVAC and service water heating system controls JACK GREENenergy_progress
03/12/2025HVAC insulation and sealing JACK GREENenergy_progress
03/12/2025HVAC and service water heating equipment JACK GREENenergy_progress
03/12/2025Maintenance informationJACK GREENenergy_progress
03/12/2025Energy Code Compliance InspectionsJACK GREENprogress
03/12/2025FinalJACK GREENprogress
03/12/2025Mechanical SystemsJACK GREENspecial
Latest 25 of 105.
1,543 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account