← Back
BuildNYC
BRONX
Webster Residence
1111 WEBSTER AVENUE · BIN 2131286
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Active Violations 0 unresolved · 2 paperwork only ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsUnder Construction1 filing
RoofWebster 1099 Realty LLC5p · 1 filing
CellarWebster 1099 Realty LLC1p · 1 filing
Site & exteriorWebster 1099 Realty LLCUnder Construction4 filings
Filed — no permit issuedTemporary construction fence1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1099 Webster Owners410/13/2026
Webster 1099 Realty308/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mega Contracting GPGeneral Contractor308/21/2026
RO-Sal Plumbing & HeatingFire Protection306/28/2026
Kingdom AssociatesScaffold210/02/2026
Platinum Services NYScaffold208/21/2026
RO-Sal Plumbing & HeatingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins18031110/20/2026
Building Lifecycle
All (168)Filed (25)Permit Issued (21)Signed Off (2)Violation (9)Inspection (1)Objection (80)Special Inspection (30)
10/20/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-A1
10/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
10/20/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
SAMI HAJJAR P.E
10/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMI HAJJAR P.E
10/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
10/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
10/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/20/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
10/01/2026
Permit issued — Protection and Mechanical Methods
X00909046-Z4-PMM
09/29/2026
Permit issued — Protection and Mechanical Methods
X00909046-Z4-PMM
09/28/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-Z4
08/28/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-Z1
08/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01447311-I1
08/20/2026
Permit issued — Sidewalk Shed
X01447311-I1-SH
08/20/2026
Permit issued — General Construction
X00909046-I1-GC
08/14/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/14/2026
Special inspection requirement — Concrete - Cast-In-Place
08/14/2026
Special inspection requirement — Structural Steel - Welding
08/11/2026
Objection resolved — Addressed
08/05/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/05/2026
Objection raised — Other
07/20/2026
Permit issued — Structural
X00909046-S3-ST
07/17/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-P5
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
07/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/13/2026
Special inspection requirement — Structural Steel - Welding
07/06/2026
Permit issued — Foundation
X00909046-S2-FO
06/17/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-P4
05/26/2026
Permit issued — Protection and Mechanical Methods
X01406743-I1-PMM
05/23/2026
Filed — Alteration
INSTALLATION OF 6000 LB DUAL PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01406743-I1
05/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER APPROVED DRAWINGS.
X01309620-P1
05/08/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-Z2
04/30/2026
Filed — New Building
Support of Excavation filing as per plans filed
X00909046-P3
04/30/2026
Special inspection requirement — Structural Steel - Welding
04/30/2026
Special inspection requirement — Concrete - Cast-In-Place
04/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/28/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ira Beer
04/28/2026
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
04/08/2026
Signed off — Alteration
X01333928-I1
03/26/2026
Permit issued — Standpipe
X00909046-S8-EW-SD
03/20/2026
Permit issued — General Construction
X00909046-I1-GC
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/10/2026
Special inspection requirement — Shutoff dampers
03/10/2026
Special inspection requirement — Final
03/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/10/2026
Special inspection requirement — Mechanical Systems
03/03/2026
Permit issued — Plumbing
X00909046-S5-PL
02/27/2026
Permit issued — Structural
X00909046-S3-ST
02/25/2026
Signed off — Full Demolition
full demolition of one story structure, using hand-held and mechanical to assist.
X01286616-I1
02/25/2026
Permit issued — Support of Excavation
X00909046-S1-SE
02/19/2026
Permit issued — Mechanical Systems
X00909046-S4-MS
02/18/2026
Permit issued — Foundation
X00909046-S2-FO
02/18/2026
Permit issued — Foundation
X00909046-S9-FO
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedKingdom Associates10/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedKingdom Associates09/29/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/20/2026
DOB NOWGeneral ConstructionPermit IssuedMega Contracting GP08/20/2026
DOB NOWStructuralPermit IssuedMega Contracting GP07/20/2026
DOB NOWFoundationPermit IssuedMega Contracting GP07/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPlatinum Services NY05/26/2026
DOB NOWStandpipePermit IssuedRO-Sal Plumbing & Heating03/26/2026
DOB NOWGeneral ConstructionPermit IssuedMega Contracting GP03/20/2026
DOB NOWPlumbingPermit IssuedRO-Sal Plumbing & Heating03/03/2026
DOB NOWStructuralPermit IssuedMega Contracting GP02/27/2026
DOB NOWSupport of ExcavationPermit IssuedMega Contracting GP02/25/2026
DOB NOWMechanical SystemsPermit IssuedSNS Orgnization02/19/2026
DOB NOWFoundationPermit IssuedMega Contracting GP02/18/2026
DOB NOWFoundationPermit IssuedMega Contracting GP02/18/2026
DOB NOWFull DemolitionSigned-offNortheast Specialist Group01/30/2026
DOB NOWStandpipePermit IssuedRO-Sal Plumbing & Heating01/16/2026
DOB NOWSprinklersPermit IssuedRO-Sal Plumbing & Heating01/16/2026
DOB NOWProtection and Mechanical MethodsSigned-offNortheast Specialist Group01/15/2026
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge01/06/2026
DOB NOWConstruction FenceSigned-offNortheast Specialist Group12/23/2025
1 project · most recent 10/20/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026Permit IssuedKingdom AssociatesAir Conditioning Systems
Cooling
Lg ARUM144BTE5 144,000 BTU · Vrf Outdoor ×12
ARUM121BTE5 119,700 BTU · Vrf Outdoor ×6
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×2
1 project · most recent 10/20/2026
Sprinkler System
FiledStatusContractorScope
10/20/2026Permit IssuedRO-Sal Plumbing & HeatingSprinkler System
1 project · most recent 10/20/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/20/2026Permit IssuedRO-Sal Plumbing & HeatingStorm, Water/Sanitary
4 projects · most recent 09/24/2026
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
09/24/2026Permit IssuedGlo Electric—
08/20/2026Permit IssuedRichard Neu—
12/17/2025Permit IssuedAmber Lite Electric1 meters, 1 new_meters
12/12/2025Permit IssuedGlo ElectricGeneral Wiring, Lighting, Boiler Controls
1 project · most recent 10/20/2026
Concrete Masonry
FiledStatusContractorScope
10/20/2026Permit IssuedKingdom AssociatesConcrete, Masonry
3 projects · most recent 08/20/2026
Fence Sidewalk Shed
FiledStatusContractorScope
08/20/2026Permit IssuedPlatinum Services NYSidewalk Shed
05/20/2026Permit IssuedMega Contracting GPFence
12/08/2025Signed-offNortheast Specialist GroupFence
2 projects · most recent 10/20/2026
Earthwork Full Demolition Notification
FiledStatusContractorScope
10/20/2026Permit IssuedKingdom AssociatesEarthwork
12/08/2025Signed-offNortheast Specialist GroupFull Demolition Notification
1 project · most recent 10/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/20/2026Permit IssuedKingdom AssociatesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/05/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
10/20/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
10/20/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
10/20/2026On-Site Private Sewage Disposal Systems InstallationSAMI HAJJAR P.Especial
10/20/2026Post-installed AnchorsSAMI HAJJAR P.Especial
10/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
10/20/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
10/20/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/14/2026Excavations - Sheeting, Shoring, and Bracing—special
08/14/2026Structural Stability – Alterations of existing buildings—special
08/14/2026Structural Steel - Welding—special
08/14/2026Concrete - Cast-In-Place—special
07/13/2026Excavations - Sheeting, Shoring, and Bracing—special
07/13/2026Concrete - Cast-In-Place—special
07/13/2026Structural Steel - Welding—special
07/13/2026Structural Stability – Alterations of existing buildings—special
04/30/2026Structural Steel - Welding—special
04/30/2026Excavations - Sheeting, Shoring, and Bracing—special
04/30/2026Concrete - Cast-In-Place—special
04/30/2026Structural Stability – Alterations of existing buildings—special
04/28/2026Footing and FoundationSAMI HAJJAR P.Eprogress
04/28/2026Subsurface Investigations (Borings/Test Pits)Ira Beerspecial
04/28/2026Subsurface Conditions – Fill Placement & In-Place DensitySAMI HAJJAR P.Especial
04/28/2026Subgrade InspectionsSAMI HAJJAR P.Especial
04/28/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
04/28/2026FinalSAMI HAJJAR P.Eprogress
Latest 25 of 62.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/21/2026X01447311-I1Request digital key ↗
08/17/2026X01286616-S2Request digital key ↗
08/17/2026X01286616-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/16/2026X00909046-I1Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X00909046-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026X00909046-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026X00909046-I1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWDPL-1: Design Professional Seal & Signature31
10/22/2026X00909046-A1Open ↗
10/01/2026X00909046-P9Open ↗
10/01/2026X00909046-P6Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
10/22/2026X00909046-A1Open ↗
10/22/2026X00909046-A1Open ↗
10/22/2026X00909046-A1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
10/22/2026X00909046-A1Open ↗
10/01/2026X00909046-P6Open ↗
10/01/2026X00909046-P9Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026X00909046-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026X00909046-I1—
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X00909046-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026X00909046-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWOER: Notice to Proceed12
10/22/2026X00909046-A1Open ↗
08/21/2026X00909046-I1Open ↗
08/16/2026X00909046-S1Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026X00909046-P4Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification4
08/17/2026X01286616-P1Open ↗
08/17/2026X01286616-I1Open ↗
08/16/2026X00909046-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial1
08/16/2026X00909046-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026X00909046-I1Open ↗