Miscellaneous educational facility
Yeshiva Kehilath Yakov
1112 38 STREET · Borough Park · BIN 3429279
💬 Discuss this project
2020Year Built
5Stories
W9Building Class
R6Zoning
57,028 sfGross Floor Area
1Units
LL97 Covered3 Open Violations ▸FDNY Report ↗
Miscellaneous educational facility · Owner of record: 3801 YKY LLC · 13,760 sf lot · 4.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Roof9p · 2 filings · 10 docs
Floor 57p · 1 filing · 8 docs
Floor 4
Floor 3
Floor 2
Floor 111p · 2 filings · 13 docs
Cellar19p · 2 filings · 15 docs
Site & exterior32p · 5 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3801 YKY5507/08/2026
YKY CONSTRUCTION304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2017$2.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO1003/21/2026
ISLE CONSULTING1803/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor1307/08/2026
YKY CONSTRUCTION INCGeneral Contractor607/08/2026
WNW & SONS PLBG & HTG INCPlumbing406/27/2026
ARON SPANGELETElectrical103/21/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
CITY WIDE ELECL CONTS INC 004457General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616103/07/2025
Building Lifecycle
All (171)Filed (20)Permit Issued (11)Signed Off (5)Violation (60)Inspection (2)Objection (64)Special Inspection (9)
09/16/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/08/2025
Permit issued — Plumbing
B01190219-I1-PL
08/14/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Energy
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Admin
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Structural
05/30/2025
Objection resolved — Addressed
05/28/2025
Objection raised — Scope
05/28/2025
Objection raised — Cost
05/13/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/12/2025
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
04/10/2025
Objection raised — Fire_Protection
04/10/2025
Objection raised — Energy
04/10/2025
Objection raised — Inspections
04/10/2025
Objection raised — Inspections
04/10/2025
Objection raised — Scope
03/24/2025
Objection resolved — Addressed
03/18/2025
Objection raised — Admin
03/07/2025
Filed — Alteration
Plumbing application hereby filed as per plans.
B01190219-I1
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection resolved — Addressed
08/28/2024
Objection raised — Structural
08/20/2024
Objection raised — Fire_Protection
08/20/2024
Objection resolved — Addressed
08/12/2024
Objection raised — Inspections
07/29/2024
Filed — No Work
B00766104-P5
07/25/2024
Special inspection requirement — Public Assembly Emergency Lighting
Soorjbally Harilall
11/30/2023
Special inspection requirement — Public Assembly Emergency Lighting
Soorjbally Harilall
11/28/2023
Special inspection requirement — Public Assembly Emergency Lighting
Soorjbally Harilall
11/20/2023
Filed — No Work
B00766105-P2
11/20/2023
Filed — No Work
B00766106-P1
11/20/2023
Filed — No Work
B00817761-P1
11/20/2023
Filed — No Work
B00766104-P1
11/20/2023
Special inspection requirement — Public Assembly Emergency Lighting
Soorjbally Harilall
11/20/2023
Special inspection requirement — Public Assembly Emergency Lighting
Soorjbally Harilall
11/20/2023
Special inspection requirement — Public Assembly Emergency Lighting
Soorjbally Harilall
03/23/2023
Filed — No Work
B00766105-P1
03/20/2023
Objection resolved — Addressed
03/20/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWNW & SONS PLBG & HTG INC09/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES06/29/2022
DOB NOWConstruction FenceSigned-offYKY CONSTRUCTION INC05/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offYKY CONSTRUCTION INC05/03/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/09/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES10/27/2021
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES07/01/2021
DOB NOWConstruction FenceSigned-offYKY CONSTRUCTION INC05/20/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/20/2021
DOB NOWConstruction FenceSigned-offYKY CONSTRUCTION INC06/09/2020
DOB NOWConstruction FenceSigned-offYKY CONSTRUCTION INC06/12/2019
BIS—ISSUEDYKY CONSTRUCTION INC07/03/2023
BIS—ISSUEDYKY CONSTRUCTION INC09/28/2022
BISPLISSUEDWNW & SONS PLBG & HTG INC07/25/2022
BIS—ISSUEDYKY CONSTRUCTION INC05/04/2022
BIS—ISSUEDYKY CONSTRUCTION INC09/06/2021
BISPLISSUEDWNW & SONS PLBG & HTG INC07/27/2021
BIS—ISSUEDYKY CONSTRUCTION INC05/11/2021
BIS—ISSUEDYKY CONSTRUCTION INC12/11/2020
BIS—ISSUEDYKY CONSTRUCTION INC12/11/2020
BIS—ISSUEDYKY CONSTRUCTION INC10/16/2020
BIS—ISSUEDYKY CONSTRUCTION INC10/16/2020
1 project · most recent 03/07/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/07/2025Permit IssuedADD MECHANICAL INCGas, Water/Sanitary
6 projects · most recent 07/03/2025
General Wiring
FiledStatusContractorScope
07/03/2025Permit IssuedABZ ELECTRIC INC—
11/01/2024CompleteCITY WIDE ELECL CONTS INCGeneral Wiring
03/29/2022CompleteSTAR ELEC'L CONTRACTORS C—
11/25/2021CompleteCITY WIDE ELECL CONTS INC5 meters, 5 new_meters
04/08/2021CompleteV. VASS ELECTRIC CORP—
08/01/2018CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/16/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/12/2025Post-installed AnchorsSHAHRIAR QUAYYUMspecial
03/05/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
03/05/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/25/2024Public Assembly Emergency LightingSoorjbally Harilallprogress
11/30/2023Public Assembly Emergency LightingSoorjbally Harilallprogress
11/28/2023Public Assembly Emergency LightingSoorjbally Harilallprogress
11/20/2023Public Assembly Emergency LightingSoorjbally Harilallprogress
11/20/2023Public Assembly Emergency LightingSoorjbally Harilallprogress
11/20/2023Public Assembly Emergency LightingSoorjbally Harilallprogress
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch - Place of Assembly10
08/29/2026B00766104-P1Request digital key ↗
08/29/2026B00766106-P1Request digital key ↗
08/29/2026B00766105-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch10
09/02/2026B00080042-I1Request digital key ↗
09/01/2026B00502953-I1Request digital key ↗
09/01/2026B00502953-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits49
▸BISPLAN / WORK APPROVAL APPLICATION32
11/06/2023321790503Open ↗
04/26/2023321790503Open ↗
04/25/2023321790503Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION14
07/05/2023321790503Open ↗
01/24/2023321790503Open ↗
02/19/2022321790503Open ↗
Showing 3 of 14 on file for this type
▸BISPD1 FORM & APPLICATION FOR STREET NUMBER STAMPED BY TOPO IS TO BE E-SUBMITTED PRIOR TO NEXT TCO RENEWAL.1
07/27/2023321790503Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/15/2022340830257Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/21/2022321790503Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM1
10/28/2020321790503Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/08/2019321790503Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/08/2019321790503Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/02/2026B00080042-I1Open ↗
09/01/2026B00549151-I1Open ↗
08/31/2026B00619011-P2Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/05/2020321790503Open ↗
10/29/2018321790503Open ↗
10/25/2018321790503Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00817761-I1Open ↗
08/29/2026B00766106-I1Open ↗
08/27/2026B00817761-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/22/2021340830257Open ↗
11/01/2018340641309Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01190219-I1Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING9
04/03/2023321790503Open ↗
04/03/2023321790503Open ↗
04/03/2023321790503Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/29/2018321790503Open ↗
10/23/2018321790503Open ↗
06/27/2018321790503Open ↗
▸BISSTANDPIPE SYSTEMS2
10/06/2023321790503Open ↗
04/28/2023321790503Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/04/2024321790503Open ↗
04/27/2023321790503Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
04/28/2023321790503Open ↗
▸BISEQUIPMENT USE PERMITS1
11/04/2024321790503Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/16/2023321790503Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/16/2023321790503Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
12/22/2021340830257Open ↗
04/08/2019321790503Open ↗
11/01/2018340641309Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
09/24/2024340830257Open ↗
09/24/2024321790503Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/22/2021340830257Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/10/2022321790503Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/03/2019321790503Open ↗
06/27/2018321790503Open ↗
06/27/2018321790503Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/12/2021321790503Open ↗
07/18/2020321790503Open ↗
▸BISELECTRIC MOTORS1
04/16/2023321790503Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/16/2023321790503Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/16/2023321790503Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/15/2024321790503Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/16/2023321790503Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/16/2023321790503Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/16/2023321790503Open ↗
▸BISINTERIOR LIGHTING POWER1
04/16/2023321790503Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/16/2023321790503Open ↗
▸BISFENESTRATION AREAS1
04/16/2023321790503Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/27/2024321790503Open ↗
10/06/2023321790503Open ↗
05/31/2023321790503Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
04/26/2023321790503Open ↗
06/24/2020321790503Open ↗
06/05/2020321790503Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
06/15/2021321790503Open ↗
06/24/2020321790503Open ↗
06/05/2020321790503Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
05/10/2022321790503Open ↗
06/24/2020321790503Open ↗
▸BISHYDRO FLOW TEST LETTER2
05/22/2019321790503Open ↗
05/07/2019321790503Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
06/09/2021321790503Open ↗
05/14/2020321790503Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
06/21/2019321790503Open ↗
05/07/2019321790503Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
04/16/2023321790503Open ↗
▸BISSOIL REPORT1
10/25/2018321790503Open ↗
▸BISMECHANICAL SYSTEMS1
12/27/2024321790503Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
01/09/2020321790503Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
04/27/2023321790503Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/27/2023321790503Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
09/02/2026B00080042-I1Open ↗
08/29/2026B00766104-P1Open ↗
08/29/2026B00766106-P1Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
11/06/2023321790503Open ↗
04/26/2023321790503Open ↗
02/27/2023321790503Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/15/2022340830257Open ↗
03/15/2022340830257Open ↗
12/22/2021340830257Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
10/10/2024340830257Open ↗
10/10/2024340830257Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
10/26/2020321790503Open ↗
10/06/2020321790503Open ↗
06/05/2020321790503Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/28/2020321790503Open ↗
06/24/2020321790503Open ↗
▸Filing & Intake Forms31
▸BISADDITIONAL INFORMATION22
07/05/2023321790503Open ↗
05/16/2023321790503Open ↗
04/28/2023321790503Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET5
05/08/2019321992153Open ↗
10/29/2018321790503Open ↗
06/27/2018321790503Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
12/22/2021340830257Open ↗
11/01/2018340641309Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
03/15/2022340830257Open ↗
11/01/2018340641309Open ↗
▸Other Documents4
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/16/2023321790503Open ↗
▸BISSHUTOFF DAMPERS1
04/16/2023321790503Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/19/2018321790503Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
04/16/2023321790503Open ↗