← Back
Four families
1112 LENOX ROAD
BROOKLYN · BIN 3101877
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6Zoning
3,198 sfGross Floor Area
4Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Four families · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 21p · 1 filing · 3 docs
Floor 1
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2021$789K—— → —$247/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MELDAN GROUP LLC612/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC503/21/2026
D+DG ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BT'S PLUMBING AND HEATINGPlumbing207/08/2026
BOROUGH CONSTRUCTION GROUPGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MELDAN GROUP LLC8100612/15/2025
Building Lifecycle
All (79)Filed (6)Permit Issued (3)Violation (35)Inspection (4)Objection (10)Special Inspection (21)
05/14/2026
Permit issued — General Construction
B01325298-I1-GC
05/05/2026
Violation issued (HPD, open)
A
01/03/2026
Objection resolved — Addressed
01/03/2026
Objection resolved — Addressed
01/03/2026
Objection resolved — Addressed
01/03/2026
Objection resolved — Addressed
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Energy
12/31/2025
Objection raised — Other
12/15/2025
Filed — Alteration
OBTAIN WORK PERMITS TO COMPLETE WORK AT REAR UNIT 2R (FRONT BEDROOM) AND CURE ECB VIOLATIONS: 39163180X; 39163181H;39163189M
B01325298-I1
12/15/2025
Filed — Alteration
MODIFY EXISTING CELLAR ENTRANCE AT FRONT YARD IN COMPLIANCE W/ MDL #192. PROVIDE NEW STANDARD STEPS AT FRONT AREAWAY IN LIEU OF EX'G LADDER TO CELLAR. NO CHANGE TO USE, OCCUPANCY, EGRESS, OR BULK.
B01325819-I1
12/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Reid
12/14/2025
Special inspection requirement — Subgrade Inspections
Jeffrey Reid
11/27/2025
Special inspection requirement — Final
Jeffrey Reid
11/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Reid
11/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Reid
10/09/2025
Violation issued (ECB, closed)
Unknown
10/09/2025
Violation issued (ECB, open)
Construction
10/09/2025
Violation issued (ECB, open)
Construction
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, open)
C
06/10/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, closed)
I
04/10/2024
Violation issued (HPD, open)
A
11/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2023
Filed — Alteration
Replace existing gas fired hot water boiler at the cellar with four new 70,000 btu gas fired units.
B00593249-P2
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Reid
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Reid
10/05/2023
Special inspection requirement — Post-installed Anchors
Jeffrey Reid
10/05/2023
Special inspection requirement — Permanent certificate
Jeffrey Reid
10/05/2023
Special inspection requirement — Maintenance information
Jeffrey Reid
10/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Reid
10/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Reid
10/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Reid
09/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2023
Objection resolved — Addressed
07/25/2023
Objection raised — Scope
07/24/2023
Filed — Alteration
Replace existing gas fired hot water boiler at the cellar with four new 70,000 btu gas fired units.
B00593249-P1
07/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Reid
07/22/2023
Special inspection requirement — Maintenance information
Jeffrey Reid
07/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Reid
07/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Reid
07/22/2023
Special inspection requirement — Post-installed Anchors
Jeffrey Reid
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Reid
07/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Reid
07/22/2023
Special inspection requirement — Permanent certificate
Jeffrey Reid
06/30/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/05/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/23/2023
Violation issued (HPD, open)
A
03/08/2023
Permit issued — Plumbing
B00593249-I1-PL
11/07/2022
Violation issued (HPD, closed)
I
12/09/2021
Permit issued — Plumbing
B00593249-I1-PL
09/28/2021
Filed — Alteration
Replace existing gas fired hot water boiler at the cellar with four new 70,000 btu gas fired units.
B00593249-I1
07/20/2021
Filed — Alteration
B00559667-I1
04/09/2021
Violation issued (HPD, closed)
I
04/09/2021
Violation issued (HPD, closed)
A
08/06/2020
Violation issued (HPD, closed)
C
08/06/2020
Violation issued (HPD, open)
C
07/11/2020
Violation issued (HPD, open)
C
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBOROUGH CONSTRUCTION GROUP05/14/2026
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING03/08/2023
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING12/09/2021
1 project · most recent 10/19/2023
Gas
FiledStatusContractorScope
10/19/2023Signed-offBT'S PLUMBING AND HEATINGGas
2 projects · most recent 05/07/2026
General Wiring
FiledStatusContractorScope
05/07/2026Permit IssuedFRIED ELECTRIC CO.General Wiring
04/16/2026Permit IssuedFRIED ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/05/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
12/14/2025Concrete - Cast-In-PlaceJeffrey Reidspecial
12/14/2025Subgrade InspectionsJeffrey Reidspecial
11/27/2025FinalJeffrey Reidprogress
11/27/2025Tenant Protection Plan ComplianceJeffrey Reidspecial
11/27/2025Fire-Resistant Penetrations and JointsJeffrey Reidspecial
10/05/2023Energy Code Compliance InspectionsJeffrey Reidprogress
10/05/2023Fire-Resistant Penetrations and JointsJeffrey Reidspecial
10/05/2023Post-installed AnchorsJeffrey Reidspecial
10/05/2023Permanent certificateJeffrey Reidenergy_progress
10/05/2023Maintenance informationJeffrey Reidenergy_progress
10/05/2023HVAC-R and service water heating system controlsJeffrey Reidenergy_progress
10/05/2023HVAC-R and service water piping design and insulationJeffrey Reidenergy_progress
10/05/2023HVAC-R and service water heating equipmentJeffrey Reidenergy_progress
07/22/2023HVAC-R and service water heating equipmentJeffrey Reidenergy_progress
07/22/2023Maintenance informationJeffrey Reidenergy_progress
07/22/2023HVAC-R and service water heating system controlsJeffrey Reidenergy_progress
07/22/2023Energy Code Compliance InspectionsJeffrey Reidprogress
07/22/2023Post-installed AnchorsJeffrey Reidspecial
07/22/2023Fire-Resistant Penetrations and JointsJeffrey Reidspecial
07/22/2023HVAC-R and service water piping design and insulationJeffrey Reidenergy_progress
07/22/2023Permanent certificateJeffrey Reidenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00559667-I1Request digital key ↗
09/01/2026B00593249-P2Request digital key ↗
09/01/2026B00593249-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature13
09/25/2026B00593249-P1Open ↗
09/25/2026B00593249-P1Open ↗
09/25/2026B00593249-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00559667-I1Open ↗
09/01/2026B00593249-P2Open ↗
09/01/2026B00593249-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/25/2026B00593249-P1Open ↗
09/25/2026B00593249-P1Open ↗
09/01/2026B00593249-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00559667-I1Open ↗
08/19/2026B01325819-I1Open ↗
08/13/2026B01325298-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00593249-I1Open ↗