← Back
Elevator apt, luxury type
One & Two Sutton Place North
1113 YORK AVENUE · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1045277
💬 Discuss this project
2009Year Built
37Stories
D8Building Class
C4-7Zoning
283,848 sfGross Floor Area
210Units
LL97 CoveredRent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, luxury type · Owner of record: 2 SUTTON PLACE N LLC · 26,956 sf lot · 10.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Cellar53p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2 SUTTON PLACE N LLC203/22/2026
1113 YORK AVE REALTY COMPANY5003/22/2026
PARK AVE CONCRETE INC103/22/2026
TURNER CONSTRUCTION COMPA403/22/2026
SOLON MGMT CORP203/22/2026
OWNER OF 1113-1127 YORK A103/22/2026
BRIDGEWATER103/22/2026
SECOND AVESOLOW DEVELOP C303/22/2026
2ND AVE SALON DEVLOP CORP103/22/2026
60TH STREET DEVELOPMENT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/23/2022$221.3M—1113 YORK AVE REALTY COMPANY II, L.L.C. → 2 SUTTON PLACE N LLC$780/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A. CAPRIO ARCHITECT, PLLC205/07/2025
LANGAN ENGINEERING101/22/2025
COSENTINI ASSOCIATES610/12/2022
DANIEL GOLDNER ARCHITECTS207/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP NYC, INC1603/21/2026
GILLMAN CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SECOND AVE SOLOW DEV CORPGeneral Contractor707/08/2026
RAPID RUBBISH LLCGeneral Contractor207/08/2026
VICTOR LIVINGSTONElectrical203/21/2026
WATER DYNAMIC P & H CORPPlumbing207/08/2026
ALL PURPOSE ELECTRIC CORPElectrical103/22/2026
LANGAN ENGINEERING ENVIRONMEGeneral Contractor103/22/2026
SUPERIOR HVAC INCGeneral Contractor107/08/2026
ANESIS SERVICES CORPFire Protection107/08/2026
GOHDE, AUGUSTElectrical103/21/2026
LUMOS ELECTRIC LLCElectrical103/22/2026
LUPO, CIROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI8482107/09/2024
AR-TECH ENGINEERING, P.C.6659210/12/2022
HIGHRISE GROUP NYC, INC6753410/12/2022
Building Lifecycle
All (122)Filed (12)Permit Issued (8)Signed Off (1)Facade (FISP) (6)Violation (60)Inspection (5)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
02/20/2026
Violation issued (ECB, open)
Elevators
02/01/2026
Filed — Alteration
M01350829-I1
01/21/2026
Violation issued (HPD, open)
B
01/21/2026
Violation issued (HPD, open)
B
09/28/2025
Violation issued (HPD, open)
B
09/25/2025
Signed off — Alteration
Outdoor open recreation court with temporary weather enclosure accessory to residential as shown on drawings. No change in use, egress or occupancy. In conjunction with NB 110131606.
M01075770-I1
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
05/08/2025
Special inspection requirement — Final
Sandeep Gunnala
05/07/2025
Filed — Alteration
Outdoor open recreation court with temporary weather enclosure accessory to residential as shown on drawings. No change in use, egress or occupancy. In conjunction with NB 110131606.
M01075770-P1
05/07/2025
Special inspection requirement — Final
Sandeep Gunnala
05/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2025
Filed — Alteration
M00879697-I1
08/15/2024
Permit issued — General Construction
M01075770-I1-GC
07/11/2024
Permit issued — General Construction
M01075770-I1-GC
07/09/2024
Filed — Alteration
Outdoor open recreation court with temporary weather enclosure accessory to residential as shown on drawings. No change in use, egress or occupancy. In conjunction with NB 110131606.
M01075770-I1
08/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/20/2022
Special inspection requirement — Post-installed Anchors
MANSUKH SAVALIA
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
10/20/2022
Special inspection requirement — Sprinkler Systems
ALBERTO ROMAN
10/20/2022
Special inspection requirement — Post-installed Anchors
ALBERTO ROMAN
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANSUKH SAVALIA
10/12/2022
Filed — Alteration
HEREBY FILING APPLICATION FOR MECHANICAL WORK ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00564688-P1
10/12/2022
Filed — Alteration
MODIFICATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FOR THE NEW MEDICAL OFFICE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00565542-P1
10/12/2022
Filed — Alteration
Modification of Sprinkler system for the New Medical Office. No change in use, egress, or occupancy.
M00565655-P1
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANSUKH SAVALIA
10/12/2022
Special inspection requirement — Post-installed Anchors
MANSUKH SAVALIA
10/12/2022
Special inspection requirement — Smoke Control Systems Testing
MANSUKH SAVALIA
10/12/2022
Special inspection requirement — Final
MANSUKH SAVALIA
10/12/2022
Special inspection requirement — Mechanical Systems
MANSUKH SAVALIA
07/29/2022
Special inspection requirement — Lighting controls
MANSUKH SAVALIA
07/29/2022
Special inspection requirement — Final
MANSUKH SAVALIA
07/29/2022
Special inspection requirement — Energy Code Compliance Inspections
MANSUKH SAVALIA
07/29/2022
Special inspection requirement — Interior lighting power
MANSUKH SAVALIA
07/29/2022
Special inspection requirement — Insulation placement and R values
MANSUKH SAVALIA
07/27/2022
Filed — Alteration
INTERIOR BUILDOUT ON GROUND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00564382-P1
07/14/2022
Special inspection requirement — Final
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Post-installed Anchors
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
07/14/2022
Special inspection requirement — Post-installed Anchors
ALBERTO ROMAN
07/14/2022
Special inspection requirement — Sprinkler Systems
ALBERTO ROMAN
07/14/2022
Special inspection requirement — Energy Code Compliance Inspections
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Final
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Lighting controls
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Insulation placement and R values
MANSUKH SAVALIA
07/14/2022
Special inspection requirement — Interior lighting power
MANSUKH SAVALIA
05/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/10/2022
Violation issued (HPD, closed)
A
03/10/2022
Violation issued (HPD, closed)
I
12/29/2021
Permit issued — General Construction
M00564382-I1-GC
11/04/2021
Permit issued — Sprinklers
M00565655-I1-EW-SP
11/04/2021
Permit issued — General Construction
M00564382-I1-GC
11/04/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/06/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/29/2021
Permit issued — Mechanical Systems
M00564688-I1-MS
09/28/2021
Permit issued — Plumbing
M00565542-I1-PL
09/14/2021
Filed — Alteration
HEREBY FILING APPLICATION FOR MECHANICAL WORK ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00564688-I1
09/01/2021
Filed — Alteration
Modification of Sprinkler system for the New Medical Office. No change in use, egress, or occupancy.
M00565655-I1
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRAPID RUBBISH LLC08/15/2024
DOB NOWGeneral ConstructionSigned-offRAPID RUBBISH LLC07/11/2024
DOB NOWGeneral ConstructionPermit IssuedSECOND AVE SOLOW DEV CORP12/29/2021
DOB NOWSprinklersPermit IssuedTHOMAS FAY11/04/2021
DOB NOWGeneral ConstructionPermit IssuedSECOND AVE SOLOW DEV CORP11/04/2021
DOB NOWMechanical SystemsPermit IssuedSUPERIOR HVAC INC09/29/2021
DOB NOWPlumbingPermit IssuedHYDRO PLBG & HTG CORP09/28/2021
DOB NOWGeneral ConstructionPermit IssuedSECOND AVE SOLOW DEV CORP09/01/2021
BIS—ISSUEDSECOND AVE SOLOW DEV CORP06/30/2015
BISEQISSUEDSPRING SCAFFOLDING LLC05/12/2015
BISEQISSUEDGREG LOGISTICS LLC01/20/2015
BISEQISSUEDSECOND AVE SOLOW DEV CORP01/09/2015
BIS—ISSUEDSECOND AVE SOLOW DEV CORP01/09/2015
BISPLISSUEDPAR PLUMBING CO., INC10/21/2014
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION10/20/2014
BISEQISSUEDHUNTER ROBERTS CONSTRUCTION10/20/2014
BISEQISSUEDHUNTER ROBERTS CONSTRUCTION08/29/2014
BISEQISSUEDSAFWAY ATLANTIC, LLC06/06/2014
BISSDISSUEDPREMIER FIRE SPRNKLR CO05/01/2014
BISSPISSUEDPREMIER FIRE SPRNKLR CO05/01/2014
BISOTISSUEDBANCKER CONSTRUCTION CORP02/14/2014
BISEQISSUEDGREG LOGISTICS LLC01/23/2014
BISEQISSUEDSAFWAY ATLANTIC, LLC12/26/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC12/26/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC12/26/2013
BIS—ISSUEDHUNTER ROBERTS CONSTRUCTION12/24/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC12/20/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC12/20/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC12/20/2013
BISEQISSUEDHUNTER ROBERTS CONSTRUCTION12/19/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC11/26/2013
BISPLISSUEDPAR PLUMBING CO., INC10/24/2013
BISSDISSUEDPREMIER FIRE SPRNKLR CO09/11/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC08/08/2013
BISEQISSUEDMETROPOLITAN ENTERPRISES05/20/2013
BISSPISSUEDPREMIER FIRE SPRNKLR CO05/10/2013
BISEQISSUEDSAFWAY ATLANTIC, LLC05/09/2013
BISSDISSUEDPREMIER FIRE SPRNKLR CO05/07/2013
BISEQISSUEDGREG LOGISTICS LLC05/03/2013
BISOTISSUEDHUNTER ROBERTS CONSTRUCTION04/25/2013
+ 18 more permits on file
1 project · most recent 10/12/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/12/2022Permit IssuedSUPERIOR HVAC INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RXTQ48TAVJUA 48,000 BTU · Vrf Outdoor ×10
Heating
Daikin FXMQ48PBVJU 54,000 BTU · Vrf Indoor ×5
1 project · most recent 10/12/2022
FiledStatusContractorScope
10/12/2022Permit IssuedTHOMAS FAY—
1 project · most recent 10/12/2022
Water/Sanitary
FiledStatusContractorScope
10/12/2022Permit IssuedWATER DYNAMIC P & H CORPWater/Sanitary
8 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedLUMOS ELECTRIC LLCGeneral Wiring
02/28/2025Permit IssuedLUMOS ELECTRIC LLCGeneral Wiring
11/21/2023Permit IssuedCOMMERCIAL ELECT CONT INCGeneral Wiring
09/29/2021CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
02/19/2021CompleteLIVINGSTON ELEC'L ASSOC.—
10/12/2018CompleteTRIANGLE ELECTRIC INC.1 meters, 1 new_meters
10/12/2018CompleteTRIANGLE ELECTRIC INC.1 meters, 1 new_meters
10/12/2018CompleteTRIANGLE ELECTRIC INC.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/08/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
05/08/2025FinalSandeep Gunnalaprogress
05/07/2025FinalSandeep Gunnalaprogress
05/07/2025Tenant Protection Plan Compliance—special
10/20/2022Post-installed AnchorsMANSUKH SAVALIAspecial
10/20/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
10/20/2022Sprinkler SystemsALBERTO ROMANspecial
10/20/2022Post-installed AnchorsALBERTO ROMANspecial
10/20/2022Fire-Resistant Penetrations and JointsMANSUKH SAVALIAspecial
10/12/2022Fire-Resistant Penetrations and JointsMANSUKH SAVALIAspecial
10/12/2022Post-installed AnchorsMANSUKH SAVALIAspecial
10/12/2022Smoke Control Systems TestingMANSUKH SAVALIAspecial
10/12/2022FinalMANSUKH SAVALIAprogress
10/12/2022Mechanical SystemsMANSUKH SAVALIAspecial
07/29/2022Lighting controlsMANSUKH SAVALIAenergy_progress
07/29/2022FinalMANSUKH SAVALIAprogress
07/29/2022Energy Code Compliance InspectionsMANSUKH SAVALIAprogress
07/29/2022Interior lighting powerMANSUKH SAVALIAenergy_progress
07/29/2022Insulation placement and R valuesMANSUKH SAVALIAenergy_progress
07/14/2022FinalMANSUKH SAVALIAprogress
07/14/2022Fire-Resistant Penetrations and JointsMANSUKH SAVALIAspecial
07/14/2022Post-installed AnchorsMANSUKH SAVALIAspecial
07/14/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
07/14/2022Post-installed AnchorsALBERTO ROMANspecial
07/14/2022Sprinkler SystemsALBERTO ROMANspecial
Latest 25 of 34.
▾Documents — 801 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00564382-I1Request digital key ↗
09/02/2026M00564382-P1Request digital key ↗
09/01/2026M00565542-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits199
▸BISPLAN / WORK APPROVAL APPLICATION135
06/13/2024110131606Open ↗
05/20/2024110131606Open ↗
04/15/2024121569392Open ↗
Showing 3 of 135 on file for this type
▸BISWORK PERMIT APPLICATION60
07/16/2015110131606Open ↗
05/11/2015140345990Open ↗
01/30/2015140074951Open ↗
Showing 3 of 60 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
10/04/2024110131606Open ↗
04/24/2024110131606Open ↗
04/24/2024110131606Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/27/2024110131606Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
08/27/2024110131606Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/02/2023110131606Open ↗
▸Seals & Professional Certifications160
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION97
10/05/2018121612255Open ↗
10/01/2018121400938Open ↗
10/01/2018121400938Open ↗
Showing 3 of 97 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026M00564382-I1Open ↗
09/01/2026M00565542-I1Open ↗
09/01/2026M00565542-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M01075770-I1Open ↗
08/30/2026M00564688-I1Open ↗
08/30/2026M01075770-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026M00565542-P1Open ↗
09/01/2026M01075770-I1Open ↗
09/01/2026M00565655-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/11/2015140345990Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/11/2015140345990Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/11/2015140345990Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment69
▸BISSELF-CERT PLUMBING NOTICE36
07/16/2015110131606Open ↗
12/04/2014110131606Open ↗
11/28/2014110131606Open ↗
Showing 3 of 36 on file for this type
▸BISSCHEDULE B - PLUMBING23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
02/18/2020121427116Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS1
05/17/2023110131606Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/11/2022110131606Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/17/2023110131606Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/05/2024121569392Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
11/05/2022121525652Open ↗
▸BISSTREET TREE SIGNOFF1
01/17/2024110131606Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos39
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWOER: Notice to Proceed10
09/02/2026M00564382-I1Open ↗
08/13/2026M01075770-P1Open ↗
08/13/2026M01075770-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026M00564382-I1Open ↗
09/01/2026M00565542-I1Open ↗
09/01/2026M00565542-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00564382-I1Open ↗
08/13/2026M01075770-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
05/11/2015140345990Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/25/2025121569392Open ↗
02/25/2025121569392Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
05/17/2023121525652Open ↗
05/17/2023121525509Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs116
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST56
02/25/2025121569392Open ↗
05/18/2023121525652Open ↗
08/26/2022121427116Open ↗
Showing 3 of 56 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
04/24/2024110131606Open ↗
11/14/2016122887956Open ↗
10/18/2016122887956Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
06/13/2024110131606Open ↗
04/12/2024110131606Open ↗
04/10/2024110131606Open ↗
Showing 3 of 13 on file for this type
▸BISSUPERSEDING LETTER3
01/21/2015110131606Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL3
01/05/2024121569392Open ↗
05/17/2023121525652Open ↗
05/17/2023121525509Open ↗
▸BISSWIMMING POOL: DOH APPROVAL1
07/11/2022110131606Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
10/14/2016120386929Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT11
01/05/2024121355602Open ↗
10/20/2016120386929Open ↗
10/14/2016120386929Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
07/16/2015110131606Open ↗
01/21/2015110131606Open ↗
Showing 2 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/05/2024121569392Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms114
▸BISADDITIONAL INFORMATION55
06/24/2024110131606Open ↗
07/25/2022110131606Open ↗
06/06/2017110286823Open ↗
Showing 3 of 55 on file for this type
▸BISEFILING COVER SHEET29
10/18/2016122887956Open ↗
Showing 1 of 29 on file for this type
▸BISBOROUGH INTAKE FORM27
03/02/2020110131606Open ↗
01/28/2020110131606Open ↗
12/09/2019110131606Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/11/2015140345990Open ↗
Showing 1 of 3 on file for this type
▸Other Documents29
▸DOB NOWDHCR Document12
09/02/2026M00564382-I1Open ↗
08/13/2026M00565542-P1Open ↗
08/13/2026M00565655-P1Open ↗
Showing 3 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
07/16/2015110131606Open ↗
Showing 1 of 7 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION3
01/05/2024121569392Open ↗
01/05/2024121355602Open ↗
03/06/2023110131606Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDHCR DOCUMENT1
05/02/2024121569392Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01350829-I1Open ↗