1925Year Built
2Stories
O7Building Class
R5Zoning
7,260 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 1114 LIBERTY AVE. ASSOCIATES LLC · 7,550 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Roof4p · 2 filings · 20 docs
Floor 11p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL G CONTRACTING407/08/2026
OAK STREET HEALTH503/22/2026
W.P.L REALTY103/22/2026
OWNER OF 1114 LIBERTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASDA ARCHITECTURE + DESIGN405/12/2022
CATAPANO ENGINEERING PC1011/05/2021
COSCIA MOOS ARCHITECTURE310/14/2021
KZ ENGINEERING, P.C408/16/2021
ASHRAF CORP106/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CATAPANO ENGINEERING2603/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICON CONSTRUCTION INC.General Contractor1007/08/2026
CS BRIDGE CORPGeneral Contractor407/08/2026
SERVICE SIGN ERECTORSScaffold407/08/2026
DAVID KLEEMANElectrical303/21/2026
A S K ELECTRICAL CORP 005034General Contractor303/22/2026
ENOBRAC PLUMBING, INCPlumbing207/08/2026
GUL & G CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATAPANO ENGINEERING & AR3235911/05/2021
C.M. TESTING LABORATORY,1352711/05/2021
Building Lifecycle
All (90)Filed (22)Permit Issued (15)Signed Off (12)Violation (5)Objection (6)Special Inspection (30)
05/16/2022
Permit issued — Sign
B00704376-I1-SG
05/16/2022
Permit issued — Sign
B00704380-I1-SG
05/12/2022
Filed — Alteration
Propose to install sign. No change in use, egress, or occupancy.
B00704376-I1
05/12/2022
Filed — Alteration
B00704380-I1
03/25/2022
Special inspection requirement — Final
Alfonso DElia
03/23/2022
Signed off — Alteration
Install sign. No change in use, egress, or occupancy.
B00524158-I1
03/23/2022
Signed off — Alteration
B00524160-I1
01/28/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
B00544036-I1
01/28/2022
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00558899-I1
01/28/2022
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00558681-I1
01/28/2022
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00576347-I1
12/01/2021
Signed off — Alteration
New Tenant OSH Treatment Fac.-Remove(2) toilet,(2)lav.(2)drains (1)HW Heater & piping. Install - (15)non res. sinks (4)lav.,(4) toilets,(1) HW Heater,(1) HW recir pump, (1) RPZ,(1)fountains (1) D.W. (8) drains,(2) gas furnaces on roof.
B00502313-I1
11/18/2021
Signed off — Alteration
Tenant Space OSH Treatmenat Facility-Remove existing exhaust ductwork, fan and wall cap & vent. install interior (4) air handler units, ductwork, (1) air curtain, new exhaust ductwork all with assoc apparatus.Roof work filed under a separate applic
B00502266-I1
11/18/2021
Signed off — Alteration
Proposing Installation Mechanical Rooftop (3) condensing units and (2) HVAC Units, (5)Exhaust Fans, and Structural Dunnage.
B00587776-I1
11/09/2021
Signed off — Alteration
Proposing -Tenant OSH Treatment Fac -replace steel linels at cellar entrance, raise concrete flooring at side entrance -to make level landing/step, install new concrete footing to support new recessed wall excavate for - (1) new footing.
B00515238-I1
11/08/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
11/08/2021
Special inspection requirement — Maintenance information
JOHN CATAPANO
11/08/2021
Special inspection requirement — Structural Steel - Details
JOHN SEMIOLI
11/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
11/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
11/08/2021
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
11/08/2021
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
11/08/2021
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
11/08/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
11/08/2021
Special inspection requirement — Structural Steel - Welding
JOHN SEMIOLI
11/08/2021
Special inspection requirement — Final
JOHN CATAPANO
11/05/2021
Filed — Alteration
Proposing Installation Mechanical Rooftop (3) condensing units and (2) HVAC Units, (5)Exhaust Fans, and Structural Dunnage.
B00587776-P1
11/05/2021
Special inspection requirement — Maintenance information
JOHN CATAPANO
11/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
11/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
11/05/2021
Special inspection requirement — Final
JOHN CATAPANO
11/05/2021
Special inspection requirement — Structural Steel - Details
JOHN SEMIOLI
11/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
11/05/2021
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
11/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
11/05/2021
Special inspection requirement — Structural Steel - Welding
JOHN SEMIOLI
11/05/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
11/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
11/03/2021
Signed off — Alteration
B00502181-I1
11/03/2021
Signed off — Alteration
proposed work at new tenant space for Oak Street Health Treatment Facility - Removal of storefront, interior partitions,canopy, security door,& finishes. Install new storefront, Interior Partitions, Finishes and Casework. All work as per plans.
B00501861-I1
10/25/2021
Special inspection requirement — Final
JOHN CATAPANO
10/25/2021
Special inspection requirement — Footing and Foundation
JOHN SEMIOLI
10/25/2021
Special inspection requirement — Concrete - Cast-In-Place
JOHN SEMIOLI
10/25/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
10/15/2021
Filed — Alteration
Proposing -Tenant OSH Treatment Fac -replace steel linels at cellar entrance, raise concrete flooring at side entrance -to make level landing/step, install new concrete footing to support new recessed wall excavate for - (1) new footing.
B00515238-P2
10/14/2021
Filed — Alteration
proposed work at new tenant space for Oak Street Health Treatment Facility - Removal of storefront, interior partitions,canopy, security door,& finishes. Install new storefront, Interior Partitions, Finishes and Casework. All work as per plans.
B00501861-P3
10/14/2021
Special inspection requirement — Final
JOHN CATAPANO
10/14/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
10/14/2021
Special inspection requirement — Concrete - Cast-In-Place
JOHN SEMIOLI
09/10/2021
Permit issued — Structural
B00587776-I1-GC-CX
09/08/2021
Filed — Alteration
Proposing Installation Mechanical Rooftop (3) condensing units and (2) HVAC Units, (5)Exhaust Fans, and Structural Dunnage.
B00587776-I1
08/23/2021
Filed — Alteration
Proposing -Tenant OSH Treatment Fac -replace steel linels at cellar entrance, raise concrete flooring at side entrance -to make level landing/step, install new concrete footing to support new recessed wall excavate for - (1) new footing.
B00515238-P1
08/18/2021
Filed — Alteration
proposed work at new tenant space for Oak Street Health Treatment Facility - Removal of storefront, interior partitions,canopy, security door,& finishes. Install new storefront, Interior Partitions, Finishes and Casework. All work as per plans.
B00501861-P2
08/17/2021
Permit issued — Construction Fence
B00576347-I1-FN
08/16/2021
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00576347-I1
08/16/2021
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00558681-P1
08/12/2021
Filed — Alteration
Tenant Space OSH Treatmenat Facility-Remove existing exhaust ductwork, fan and wall cap & vent. install interior (4) air handler units, ductwork, (1) air curtain, new exhaust ductwork all with assoc apparatus.Roof work filed under a separate applic
B00502266-P1
08/12/2021
Objection raised — Other
08/12/2021
Objection resolved — Addressed
08/10/2021
Filed — Alteration
New Tenant OSH Treatment Fac.-Remove(2) toilet,(2)lav.(2)drains (1)HW Heater & piping. Install - (15)non res. sinks (4)lav.,(4) toilets,(1) HW Heater,(1) HW recir pump, (1) RPZ,(1)fountains (1) D.W. (8) drains,(2) gas furnaces on roof.
B00502313-P1
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO05/16/2022
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO05/16/2022
DOB NOWStructuralSigned-offAMERICON CONSTRUCTION INC.09/10/2021
DOB NOWConstruction FenceSigned-offCS BRIDGE CORP08/17/2021
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP07/29/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP07/29/2021
DOB NOWStructuralSigned-offAMERICON CONSTRUCTION INC.07/25/2021
DOB NOWMechanical SystemsSigned-offAMERICON CONSTRUCTION INC.07/09/2021
DOB NOWConstruction FenceSigned-offAMERICON CONSTRUCTION INC.07/08/2021
DOB NOWGeneral ConstructionSigned-offAMERICON CONSTRUCTION INC.07/08/2021
DOB NOWPlumbingSigned-offENOBRAC PLUMBING, INC07/07/2021
DOB NOWGeneral ConstructionSigned-offAMERICON CONSTRUCTION INC.06/28/2021
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC06/28/2021
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO05/22/2021
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO05/22/2021
BISOTISSUEDAMBROSINO CONST CORP07/18/1997
BISOTISSUEDBASE CONSTRUCTION CORP06/30/1997
3 projects · most recent 08/08/2022
General Wiring
FiledStatusContractorScope
08/08/2022CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
07/16/2021CompleteNASH ELECTRIC SERVICES IN—
06/26/2021Permit IssuedWCK ELECTRIC CORP.—
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
03/25/2022FinalAlfonso DEliaprogress
11/08/2021Structural Steel - WeldingJOHN SEMIOLIspecial
11/08/2021Maintenance informationJOHN CATAPANOenergy_progress
11/08/2021HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
11/08/2021HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
11/08/2021Energy Code Compliance InspectionsJOHN CATAPANOprogress
11/08/2021FinalJOHN CATAPANOprogress
11/08/2021Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
11/08/2021HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
11/08/2021Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
11/08/2021Mechanical SystemsJOHN CATAPANOspecial
11/08/2021Structural Steel - DetailsJOHN SEMIOLIspecial
11/05/2021HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
11/05/2021HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
11/05/2021HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
11/05/2021Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
11/05/2021Mechanical SystemsJOHN CATAPANOspecial
11/05/2021Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
11/05/2021Structural Steel - DetailsJOHN SEMIOLIspecial
11/05/2021Structural Steel - WeldingJOHN SEMIOLIspecial
11/05/2021Energy Code Compliance InspectionsJOHN CATAPANOprogress
11/05/2021FinalJOHN CATAPANOprogress
11/05/2021Maintenance informationJOHN CATAPANOenergy_progress
10/25/2021Concrete - Cast-In-PlaceJOHN SEMIOLIspecial
10/25/2021Footing and FoundationJOHN SEMIOLIprogress
Latest 25 of 85.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00524160-I1Request digital key ↗
09/01/2026B00524158-I1Request digital key ↗
09/01/2026B00502181-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature27
09/01/2026B00501861-P3Open ↗
09/01/2026B00501861-P3Open ↗
09/01/2026B00501861-P3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00524160-I1Open ↗
09/01/2026B00524158-I1Open ↗
09/01/2026B00502181-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026B00501861-P3Open ↗
08/29/2026B00502266-P1Open ↗
08/29/2026B00502266-P1Open ↗
Showing 3 of 17 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00502266-I1Open ↗
09/01/2026B00502266-P1Open ↗
09/01/2026B00515238-P2Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00501861-I1Open ↗
08/14/2026B00502313-I1Open ↗
08/13/2026B00587776-I1Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00515238-P2Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00515238-I1Open ↗