← Back
Elevator apt, semi-fireproof without stores
1115 BANNER AVENUE
💬 Discuss this project
2007Year Built
12Stories
D1Building Class
R6Zoning
56,652 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: BANNER LLC · 22,400 sf lot · 2.53 FAR built · Flood zone AE
Locations of Work
Electrical
Roof1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BANNER LLC503/22/2026
SANDY BANNER LLC203/22/2026
ABRO MANAGEMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECTONIC ENGINEERING111/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTHONY LOGOZZOElectrical303/21/2026
ABILENE ELECTRIC INC 003334General Contractor203/22/2026
VOLVIE HERMAN CONTRG CORPElectrical103/22/2026
NEWBRIDGE DATACOM, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106111/23/2020
Building Lifecycle
All (78)Filed (1)Permit Issued (1)Facade (FISP) (6)Violation (60)Objection (10)
03/11/2026
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (ECB, closed)
Construction
01/24/2025
Violation issued (HPD, closed)
C
01/24/2025
Violation issued (HPD, closed)
B
01/24/2025
Violation issued (HPD, closed)
C
01/24/2025
Violation issued (HPD, open)
C
01/24/2025
Violation issued (HPD, closed)
B
08/16/2024
Violation issued (ECB, closed)
Elevators
05/04/2023
Violation issued (ECB, closed)
Elevators
03/03/2023
Cycle 9 facade report submitted
03/03/2023
Cycle 9 facade report signed — SAFE
03/02/2023
Cycle 9 facade inspection completed
06/05/2022
Violation issued (HPD, closed)
A
05/28/2022
Violation issued (HPD, closed)
C
05/28/2022
Violation issued (HPD, closed)
C
05/28/2022
Violation issued (HPD, closed)
C
05/28/2022
Violation issued (HPD, closed)
B
02/24/2022
Violation issued (ECB, closed)
Elevators
01/06/2021
Permit issued — Antenna
B00409211-I1-AN
11/24/2020
Objection raised — Other
11/24/2020
Objection resolved — Addressed
11/24/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
11/24/2020
Objection resolved — Addressed
11/24/2020
Objection raised — 2014-AN BC Appendix G-Building
11/24/2020
Objection resolved — Addressed
11/24/2020
Objection raised — 1998-AN AC 28-103.14.1-Adminis
11/24/2020
Objection resolved — Addressed
11/24/2020
Objection raised — Other
11/24/2020
Objection resolved — Addressed
11/23/2020
Filed — Alteration
INSTALLATION OF STARRY SITE. INSTALLING (1) EQUIPMENT CABINET, (3) ANTENNA SECTORS (9 ANTENNAS & 3 MICROWAVE DISHES) RELATED BALLAST MOUNTS & CONDUITS ON THE ROOF. ALL INCONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00409211-I1
08/13/2019
Cycle 8 facade report signed — SWARMP
07/01/2019
Cycle 8 facade report submitted
06/28/2019
Cycle 8 facade inspection completed
04/05/2019
Violation issued (HPD, closed)
C
04/05/2019
Violation issued (HPD, closed)
C
06/26/2018
Violation issued (HPD, closed)
B
06/26/2018
Violation issued (HPD, closed)
B
06/26/2018
Violation issued (HPD, closed)
B
06/26/2018
Violation issued (HPD, closed)
B
06/26/2018
Violation issued (HPD, closed)
B
06/26/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
A
05/16/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
B
05/16/2018
Violation issued (HPD, closed)
A
03/18/2018
Violation issued (HPD, open)
B
03/18/2018
Violation issued (HPD, closed)
B
03/18/2018
Violation issued (HPD, closed)
B
03/18/2018
Violation issued (HPD, closed)
B
03/18/2018
Violation issued (HPD, closed)
A
02/02/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/20/2017
Violation issued (HPD, closed)
A
12/20/2017
Violation issued (HPD, closed)
C
12/20/2017
Violation issued (HPD, closed)
A
12/20/2017
Violation issued (HPD, closed)
C
12/20/2017
Violation issued (HPD, closed)
B
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedNEWBRIDGE DATACOM, INC01/06/2021
2 projects · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024CompleteABILENE ELECTRIC INCGeneral Wiring
07/13/2021CompleteVOLVIE HERMAN CONTRG CORP—
Nothing on file for this building.
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026B00409211-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/02/2026B00409211-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00409211-I1Open ↗