← Back
BuildNYC
Garden apartments
1115 PROSPECT AVENUE
BRONX · BIN 2091984
💬 Discuss this project
1986Year Built
3Stories
C9Building Class
R6Zoning
70,020 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized6 Active Violations 1 unresolved · 5 paperwork only ▸FDNY Report ↗
Garden apartments · Owner of record: Union Housing Preservation · 56,000 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofUnion Avenue - E. 166th Street Rehab15p · 4 filings · 20 docs
Floor 3Union Avenue - E. 166th Street Rehab50p · 6 filings · 20 docs
Floor 2Unit 2A, Unit 2B49p · 5 filings · 20 docs
Floor 1Union Avenue - E. 166th Street Rehab50p · 6 filings · 20 docs
CellarInstallation of Solar Panels on Existing Roof of Residential60p · 5 filings · 20 docs
Site & exteriorFacade recover over existing7p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2707/08/2026
Uac Pact HDFC1103/22/2026
NYC Department of Housing Preservation and Development703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Loring Consulting Engineers1104/27/2026
NY Building Associates101/20/2025
Aufgang Architects309/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting2603/21/2026
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Renewal Construction ServicesGeneral Contractor2407/08/2026
Dual Fuel Plumbing & HeatingPlumbing707/08/2026
Dual Fuel CompanyGeneral Contractor303/21/2026
Emes SolarGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244101/20/2025
Domani Inspection Service8431210/08/2024
Building Lifecycle
All (105)Filed (15)Permit Issued (22)Signed Off (7)Violation (16)Inspection (9)Objection (6)Special Inspection (30)
05/19/2026
Signed off — Alteration
Renovation of Plumbing Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use, or occupancy.
X00931499-I1
04/27/2026
Filed — Alteration
Renovation of Plumbing Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use, or occupancy.
X00931499-P2
02/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/06/2025
Signed off — Alteration
Moderate Tenant-in-Place Interior Apartment Renovation to include the removal and replacement of Kitchen Cabinets appliances and countertops, Bathroom Fixtures and finishes , new lighting, and finishes. No change in egress, use or occupancy.
X00860808-I1
09/29/2025
Signed off — Alteration
Renovation of Mechanical Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use or occupancy.
X00931494-I1
09/09/2025
Signed off — Alteration
X00890674-I1
09/08/2025
Signed off — Alteration
FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
X00918525-I1
09/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2025
Signed off — Alteration
GAS PIPING WORK FOR BOILER(S), NO CHANGE IN USE EGRESS OR OCCUPANCY
X00929387-S1
06/03/2025
Filed — Alteration
Renovation of Plumbing Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use, or occupancy.
X00931499-P1
06/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/14/2025
Permit issued — General Construction
X00918525-I1-GC
05/14/2025
Permit issued — General Construction
X00890674-I1-GC
05/14/2025
Permit issued — General Construction
X00860808-I1-GC
04/17/2025
Signed off — Alteration
GAS PIPING WORK FOR BOILER(S), NO CHANGE IN USE EGRESS OR OCCUPANCY
X00929387-I1
02/19/2025
Permit issued — General Construction
X00918525-I1-GC
02/18/2025
Permit issued — Solar
X01163716-I1-SL
02/14/2025
Permit issued — General Construction
X00890674-I1-GC
02/14/2025
Permit issued — General Construction
X00860808-I1-GC
02/12/2025
Objection resolved — Addressed
02/12/2025
Objection resolved — Addressed
02/12/2025
Objection resolved — Addressed
01/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2025
Objection raised — Electrical
01/27/2025
Objection raised — Admin
01/27/2025
Objection raised — Structural
01/20/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01163716-I1
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/07/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/07/2025
Special inspection requirement — Final
NARESH MAHANGU
01/07/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
11/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/08/2024
Filed — Alteration
GAS PIPING WORK FOR BOILER(S), NO CHANGE IN USE EGRESS OR OCCUPANCY
X00929387-P4
10/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/08/2024
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
10/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
08/23/2024
Filed — Alteration
GAS PIPING WORK FOR BOILER(S), NO CHANGE IN USE EGRESS OR OCCUPANCY
X00929387-P3
08/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/21/2024
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
08/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
08/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/15/2024
Filed — Alteration
GAS PIPING WORK FOR BOILER(S), NO CHANGE IN USE EGRESS OR OCCUPANCY
X00929387-P2
08/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
08/09/2024
Permit issued — General Construction
X00918525-I1-GC
08/06/2024
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
05/10/2024
Permit issued — General Construction
X00890674-I1-GC
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service05/14/2025
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service05/14/2025
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service05/14/2025
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service02/19/2025
DOB NOWSolarPermit IssuedEmes Solar02/18/2025
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service02/14/2025
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service02/14/2025
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service08/09/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service05/10/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service05/10/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating04/26/2024
DOB NOWMechanical SystemsSigned-offDual Fuel Company03/29/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating02/13/2024
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating02/12/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service02/12/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service02/09/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service01/02/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service01/02/2024
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service12/05/2023
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service12/05/2023
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service09/29/2023
DOB NOWGeneral ConstructionSigned-offRenewal Construction Service09/25/2023
BIS—ISSUEDReal State Development (NYCHA/HHC)09/19/2023
BISPLISSUEDDual Fuel Plumbing & Heating06/14/2007
BISPLISSUEDDual Fuel Plumbing & Heating11/18/2005
2 projects · most recent 04/27/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/27/2026Signed-offDual Fuel Plumbing & HeatingWater/Sanitary
02/02/2024——Gas
1 project · most recent 03/31/2026
FiledStatusContractorScope
03/31/2026Permit IssuedB.P. Electric—
1 project · most recent 01/20/2025
FiledStatusContractorScope
01/20/2025Permit IssuedEmes Solar33 panels, 17.16 kw, 5,649.24 roof_area_sqft
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2024Pass-Final Boiler Equipment InspectionPassView ↗
08/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2024Fail-Final Boiler Equipment InspectionFailView ↗
08/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/03/2025Tenant Protection Plan Compliance—special
01/07/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/07/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/07/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/07/2025FinalNARESH MAHANGUprogress
01/07/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/08/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
10/08/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
10/08/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
10/08/2024Heating SystemsJOHN MCMONAGLEspecial
10/08/2024Tenant Protection Plan Compliance—special
10/08/2024Heating SystemsJOHN MCMONAGLEspecial
10/08/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
10/08/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
10/08/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
10/08/2024Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
08/21/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/21/2024Heating SystemsJOHN MCMONAGLEspecial
08/21/2024Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
08/21/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/21/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/15/2024Tenant Protection Plan Compliance—special
08/15/2024Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
04/11/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
04/11/2024Heating SystemsJOHN MCMONAGLEspecial
Latest 25 of 54.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/23/2026X00860808-I1Request digital key ↗
08/22/2026X00890674-I1Request digital key ↗
08/22/2026X00918525-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2023220742677Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/02/2023220742677Open ↗
▸BISWORK PERMIT APPLICATION1
09/19/2023220742677Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/23/2026X00860808-I1Open ↗
08/22/2026X00890674-I1Open ↗
08/21/2026X00931494-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/18/2026X00929387-S1Open ↗
08/31/2026X00929387-P1Open ↗
08/30/2026X00929387-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026X00929387-P1Open ↗
08/30/2026X00929387-P4Open ↗
08/28/2026X00931494-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/22/2026X00890674-I1Open ↗
08/21/2026X00931494-I1Open ↗
08/21/2026X00992715-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026X00860808-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/22/2026X00890674-I1Open ↗
08/21/2026X00929387-P4Open ↗
08/21/2026X00929387-P3Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/13/2023220742677Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/14/2023220742677Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/13/2023220742677Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
09/14/2023220742677Open ↗