← Back
Office with commercial, 1-6 stories
1116 AVENUE J
BROOKLYN · BIN 3179819
💬 Discuss this project
1920Year Built
3Stories
O5Building Class
C4-4AZoning
3,620 sfGross Floor Area
4Units
2 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: BYG, INC. · 1,600 sf lot · 2.26 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 15p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALLEN SHINFELD, P.E. PLLC402/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHIEL, LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARUUM INTERIOR LLCGeneral Contractor303/21/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALLEN SHINFELD, P.E. PLLC1305402/19/2024
Building Lifecycle
All (33)Filed (4)Permit Issued (2)Signed Off (1)Violation (4)Inspection (3)Special Inspection (19)
11/01/2024
Signed off — Alteration
REFURBISHING EXISTING RETAIL STORE AT 1ST FLOOR AS PER PLAN INCLUDING MECHANICAL WORKS TO INSTALL HVAC SYSTEM. PLUMING, WORK TYPE TO BE FILED UNDER SEPARATE DOB NOW APPLICATION.NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
B00990619-I1
04/15/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
02/21/2024
Special inspection requirement — Energy Code Compliance Inspections
ALLEN SHINFELD
02/19/2024
Filed — Alteration
REFURBISHING EXISTING RETAIL STORE AT 1ST FLOOR AS PER PLAN INCLUDING MECHANICAL WORKS TO INSTALL HVAC SYSTEM. PLUMING, WORK TYPE TO BE FILED UNDER SEPARATE DOB NOW APPLICATION.NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
B00990619-P1
02/19/2024
Filed — Alteration
REFURBISHING EXISTING RETAIL STORE AT 1ST FLOOR AS PER PLAN INCLUDING MECHANICAL WORKS TO INSTALL HVAC SYSTEM. PLUMING, WORK TYPE TO BE FILED UNDER SEPARATE DOB NOW APPLICATION.NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
B00990619-P2
02/16/2024
Special inspection requirement — Energy Code Compliance Inspections
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Final
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Air barrier - visual inspection
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Fenestration air leakage
ALLEN SHINFELD
02/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Fenestration areas
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
02/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Lighting controls
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Interior lighting power
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Maintenance information
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Energy Code Compliance Inspections
ALLEN SHINFELD
02/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALLEN SHINFELD
02/16/2024
Special inspection requirement — Mechanical Systems
ALLEN SHINFELD
01/29/2024
Permit issued — Plumbing
B00990619-S1-PL
01/24/2024
Permit issued — Mechanical Systems
B00990619-I1-GC-CX
01/22/2024
Filed — Alteration
REFURBISHING EXISTING RETAIL STORE AT 1ST FLOOR AS PER PLAN INCLUDING MECHANICAL WORKS TO INSTALL HVAC SYSTEM. PLUMING, WORK TYPE TO BE FILED UNDER SEPARATE DOB NOW APPLICATION.NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
B00990619-S1
01/19/2024
Filed — Alteration
REFURBISHING EXISTING RETAIL STORE AT 1ST FLOOR AS PER PLAN INCLUDING MECHANICAL WORKS TO INSTALL HVAC SYSTEM. PLUMING, WORK TYPE TO BE FILED UNDER SEPARATE DOB NOW APPLICATION.NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
B00990619-I1
09/12/2002
Violation issued (ECB, closed)
Construction
07/23/2001
Violation issued (FDNY_NOV, closed)
10/04/2000
Violation issued (HPD, open)
C
10/04/2000
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDW PLUMBING INC01/29/2024
DOB NOWMechanical SystemsSigned-offARUUM INTERIOR LLC01/24/2024
BISOTISSUEDDI SANTO & FAMILY CONSTRUCTION08/17/2006
1 job · most recent 02/19/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/19/2024Signed-offARUUM INTERIOR LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric SUZ-KA36NA2 36,000 BTU · Heat Pump Outdoor ×2
Ventilation
Fantech FKD 10XL 1,266 CFM · Exhaust Fan ×4
1 job · most recent 02/19/2024
Water/Sanitary
FiledStatusContractorScope
02/19/2024Permit IssuedTRI STATE PLBG & HTG INCWater/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/15/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/21/2024Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
02/21/2024Energy Code Compliance InspectionsALLEN SHINFELDprogress
02/16/2024Energy Code Compliance InspectionsALLEN SHINFELDprogress
02/16/2024FinalALLEN SHINFELDprogress
02/16/2024Fire-Resistance Rated ConstructionALLEN SHINFELDprogress
02/16/2024Air barrier - visual inspectionALLEN SHINFELDenergy_progress
02/16/2024Fenestration air leakageALLEN SHINFELDenergy_progress
02/16/2024HVAC-R and service water piping design and insulationALLEN SHINFELDenergy_progress
02/16/2024Fenestration areasALLEN SHINFELDenergy_progress
02/16/2024Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
02/16/2024HVAC-R and service water heating equipmentALLEN SHINFELDenergy_progress
02/16/2024Fenestration and door U-factor and product ratingsALLEN SHINFELDenergy_progress
02/16/2024Lighting controlsALLEN SHINFELDenergy_progress
02/16/2024Interior lighting powerALLEN SHINFELDenergy_progress
02/16/2024Maintenance informationALLEN SHINFELDenergy_progress
02/16/2024Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
02/16/2024Energy Code Compliance InspectionsALLEN SHINFELDprogress
02/16/2024HVAC-R and service water heating system controlsALLEN SHINFELDenergy_progress
02/16/2024Mechanical SystemsALLEN SHINFELDspecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00990619-I1Request digital key ↗
08/26/2026B00990619-P2Request digital key ↗
08/26/2026B00990619-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature13
08/25/2026B00990619-P1Open ↗
08/25/2026B00990619-P1Open ↗
08/25/2026B00990619-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00990619-S1Open ↗
08/26/2026B00990619-I1Open ↗
08/13/2026B00990619-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00990619-P2Open ↗
08/29/2026B00990619-S1Open ↗
08/25/2026B00990619-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00990619-S1Open ↗
08/26/2026B00990619-I1Open ↗
08/13/2026B00990619-P1Open ↗
Showing 3 of 4 on file for this type