Three families
1116 GATES AVENUE
BROOKLYN · BIN 3076411
💬 Discuss this project
1905Year Built
3Stories
C0Building Class
R6Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: GATES STONES AND BRICKS LLC · 2,000 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof4p · 1 filing · 20 docs
Floor 39p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP1307/08/2026
GATES STONES AND BRICKS LLC103/22/2026
TOWNHOUSE RENTAL II, LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/10/2025$2.4M—GATES STONES AND BRICKS LLC → TOWNHOUSE RENTAL II, L.L.C.$733/sf building
02/15/2023$1.1M—Private party → GATES STONES AND BRICKS LLC$341/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.803/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWO BROTHERS K CONST CORPGeneral Contractor407/08/2026
YAFE MEOD CORPGeneral Contractor303/21/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781603/04/2024
Building Lifecycle
All (78)Filed (8)Permit Issued (4)Signed Off (2)Violation (12)Inspection (10)Objection (12)Special Inspection (30)
06/09/2025
Violation issued (HPD, closed)
A
05/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2024
Violation issued (HPD, closed)
A
04/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/15/2024
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL UNITS AT CELLAR, 1ST, 2ND, & 3RD FLOOR AND ROOF IN CONJUNCTION WITH ALT1 JOB # B00908662-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00848047-S1
03/14/2024
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL UNITS AT CELLAR, 1ST, 2ND, & 3RD FLOOR AND ROOF IN CONJUNCTION WITH ALT1 JOB # B00908662-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00848047-S2
03/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/05/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/05/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/04/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL UNITS AT CELLAR, 1ST, 2ND, & 3RD FLOOR AND ROOF IN CONJUNCTION WITH ALT1 JOB # B00908662-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00848047-P1
03/04/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL UNITS AT CELLAR, 1ST, 2ND, & 3RD FLOOR AND ROOF IN CONJUNCTION WITH ALT1 JOB # B00908662-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00848047-P2
03/04/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/27/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Structural Cold-Formed Steel
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
02/27/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
02/19/2024
Filed — Alteration CO
CONVERT EXISTING STORE AT CELLAR TO RESIDENTIAL ACCESSORY USE TO DWELLING UNIT ABOVE AND METERS ROOM. REMAIN ONE D.U. EACH ON EXISTING 3-SORTY BRICK BUILDING, TOTAL 3 DWELLING UNITS. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00908662-P2
12/05/2023
Objection resolved — Addressed
11/30/2023
Filed — Alteration CO
CONVERT EXISTING STORE AT CELLAR TO RESIDENTIAL ACCESSORY USE TO DWELLING UNIT ABOVE AND METERS ROOM. REMAIN ONE D.U. EACH ON EXISTING 3-SORTY BRICK BUILDING, TOTAL 3 DWELLING UNITS. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00908662-P1
11/30/2023
Objection raised — Admin
11/17/2023
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
10/24/2023
Permit issued — Structural
B00908662-I1-GC-CX
09/25/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Scope
08/22/2023
Objection resolved — Addressed
08/22/2023
Objection resolved — Addressed
08/22/2023
Objection resolved — Addressed
08/22/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Scope
08/09/2023
Objection raised — Fire_Protection
08/09/2023
Objection raised — Scope
08/09/2023
Objection raised — Zoning
08/01/2023
Filed — Alteration CO
CONVERT EXISTING STORE AT CELLAR TO RESIDENTIAL ACCESSORY USE TO DWELLING UNIT ABOVE AND METERS ROOM. REMAIN ONE D.U. EACH ON EXISTING 3-SORTY BRICK BUILDING, TOTAL 3 DWELLING UNITS. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00908662-I1
08/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedYAFE MEOD CORP10/24/2023
DOB NOWMechanical SystemsSigned-offTWO BROTHERS K CONST CORP03/31/2023
DOB NOWPlumbingSigned-offPLBG P & H INC03/30/2023
DOB NOWGeneral ConstructionPermit IssuedTWO BROTHERS K CONST CORP03/30/2023
1 project · most recent 03/04/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2024Signed-offTWO BROTHERS K CONST CORPHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-48MES-230VO 48,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 03/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/04/2024Signed-offPLBG P & H INCGas, Water/Sanitary
1 project · most recent 04/12/2024
General Wiring
FiledStatusContractorScope
04/12/2024CompleteC & A ELECTRICAL CORPGeneral Wiring
2 projects · most recent 03/04/2024
Wood Steel
FiledStatusContractorScope
03/04/2024Signed-offTWO BROTHERS K CONST CORPWood
02/19/2024Permit IssuedYAFE MEOD CORPSteel, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2023Fail-Final Construction Permit WithdrawalFailView ↗
08/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
03/05/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/05/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/05/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/05/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/05/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/04/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/04/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/04/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/04/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/04/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/04/2024Heating SystemsCHRISTIAN LOZADAspecial
03/04/2024Mechanical SystemsCHRISTIAN LOZADAspecial
03/04/2024FinalCHRISTIAN LOZADAprogress
03/04/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/04/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/04/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/04/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/04/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/27/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
02/27/2024Structural Steel - DetailsCHRISTIAN LOZADAspecial
02/27/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/27/2024Structural Cold-Formed SteelCHRISTIAN LOZADAspecial
02/27/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/27/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/27/2024FinalCHRISTIAN LOZADAprogress
Latest 25 of 48.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00848047-S1Request digital key ↗
08/27/2026B00848047-I1Request digital key ↗
08/27/2026B00848047-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00908662-I1Open ↗
08/13/2026B00908662-P1Open ↗
08/13/2026B00908662-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00908662-P2Open ↗
08/13/2026B00908662-P1Open ↗
08/13/2026B00908662-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00908662-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/03/2026B00848047-P1Open ↗
09/03/2026B00848047-P1Open ↗
08/31/2026B00848047-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00848047-S2Open ↗
08/27/2026B00848047-S1Open ↗
08/26/2026B00908662-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/03/2026B00848047-P1Open ↗
08/29/2026B00908662-P1Open ↗
08/24/2026B00908662-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026B00908662-I1Open ↗
08/13/2026B00908662-P1Open ↗
08/13/2026B00908662-P2Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00908662-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00908662-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00908662-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00848047-S1Open ↗
08/27/2026B00848047-S2Open ↗
08/26/2026B00908662-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026B00908662-P1Open ↗
08/13/2026B00908662-P2Open ↗
08/13/2026B00908662-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00908662-I1Open ↗
08/13/2026B00908662-P1Open ↗
08/13/2026B00908662-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00908662-P2Open ↗
08/13/2026B00908662-P1Open ↗
08/13/2026B00908662-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026B00908662-I1Open ↗
08/26/2026B00908662-P2Open ↗
08/15/2026B00908662-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00908662-I1Open ↗