← Back
One story retail building
1117 FULTON STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3378344
💬 Discuss this project
2000Year Built
1Stories
K1Building Class
R7DZoning
3,225 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
One story retail building · Owner of record: BERMUDA REALTY NO 2 LLC · 3,414 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIDYAN GATE REALTY NO 41807/08/2026
BERMUDA REALTY NO 2703/22/2026
BERMUDA REALTY403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC404/18/2025
IMC ARCHITECTURE DPC202/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEL-TECH CONSTRUCTION INCGeneral Contractor307/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514404/18/2025
Building Lifecycle
All (83)Filed (6)Permit Issued (3)Signed Off (3)Violation (13)Inspection (2)Objection (44)Special Inspection (12)
06/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2025
Signed off — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-S1
05/20/2025
Signed off — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-S2
04/30/2025
Objection resolved — Addressed
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/30/2025
Special inspection requirement — Mechanical Systems
RAUL VELASQUEZ MARTINEZ
04/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
RAUL VELASQUEZ MARTINEZ
04/30/2025
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Other
04/21/2025
Objection raised — Energy
04/18/2025
Filed — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-P2
04/18/2025
Objection resolved — Addressed
04/18/2025
Objection resolved — Addressed
04/17/2025
Special inspection requirement — Interior lighting power
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/14/2025
Filed — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-P1
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/10/2025
Special inspection requirement — Mechanical Systems
RAUL VELASQUEZ MARTINEZ
04/10/2025
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
04/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
RAUL VELASQUEZ MARTINEZ
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/08/2025
Objection raised — Admin
04/08/2025
Objection raised — Admin
04/03/2025
Permit issued — Mechanical Systems
B01165531-S1-MS
03/28/2025
Objection resolved — Addressed
03/26/2025
Objection raised — Scope
03/26/2025
Objection raised — Code
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/24/2025
Signed off — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-I1
03/17/2025
Permit issued — Plumbing
B01165531-S2-PL
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/11/2025
Objection raised — Scope
03/11/2025
Objection raised — Admin
03/11/2025
Objection raised — Zoning
03/11/2025
Objection raised — Zoning
03/11/2025
Objection raised — Scope
03/11/2025
Objection raised — Fire_Protection
03/11/2025
Objection raised — Fire_Protection
03/11/2025
Objection raised — Fire_Protection
03/03/2025
Permit issued — General Construction
B01165531-I1-GC
02/24/2025
Filed — Alteration CO
APPLICATION FILED TO CORRECT C/O TO SHOW STORAGE AND MECHANICAL ROOM AT THE CELLAR LEVEL. SCOPE IS LIMITED TO THE CONSTRUCTION OF A NEW FIRE-RATED DOOR
B01180147-I1
02/24/2025
Objection resolved — Addressed
02/12/2025
Objection resolved — Addressed
02/07/2025
Objection resolved — Addressed
01/31/2025
Filed — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-S1
01/31/2025
Filed — Alteration
Subsequent filing for new ventilation and connections to the boiler and unit heater.
B01165531-S2
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKEL-TECH CONSTRUCTION INC04/03/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC03/17/2025
DOB NOWGeneral ConstructionSigned-offKEL-TECH CONSTRUCTION INC03/03/2025
BISBLISSUEDM & J PLBG & HTG MECHANICAL CORP02/23/2001
BISMHISSUEDMARK & YAN HOME IMPROVEMENT INC12/19/2000
BISPLISSUEDM & J PLBG & HTG MECHANICAL CORP12/19/2000
BISPLISSUEDADVANCED PLUMBING HTG & SPR CORP05/23/2000
BIS—ISSUEDMARK YAN HM01/18/2000
BIS—ISSUEDHAMDAN CONSTRUCTION CORP01/09/1997
BISEQISSUEDHAMDAN CONSTRUCTION CORP01/09/1997
3 projects · most recent 04/18/2025
General Wiring
FiledStatusContractorScope
04/18/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
01/06/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
04/01/2019CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/30/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
04/30/2025Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
04/30/2025Fire-Resistance Rated ConstructionRAUL VELASQUEZ MARTINEZprogress
04/30/2025FinalRAUL VELASQUEZ MARTINEZprogress
04/17/2025Interior lighting power—energy_progress
04/17/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
04/10/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
04/10/2025Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
04/10/2025FinalRAUL VELASQUEZ MARTINEZprogress
04/10/2025Fire-Resistance Rated ConstructionRAUL VELASQUEZ MARTINEZprogress
04/10/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
01/10/2025FinalRAUL VELASQUEZ MARTINEZprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026B01165531-P1Request digital key ↗
08/23/2026B01165531-S2Request digital key ↗
08/23/2026B01165531-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01165531-P2Open ↗
08/23/2026B01165531-P1Open ↗
08/23/2026B01165531-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B01165531-S1Open ↗
08/28/2026B01165531-S1Open ↗
08/27/2026B01165531-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B01165531-S1Open ↗
08/28/2026B01165531-S1Open ↗
08/23/2026B01165531-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026B01165531-P1Open ↗
08/23/2026B01165531-S2Open ↗
08/23/2026B01165531-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026B01165531-S1Open ↗
08/13/2026B01180147-I1Open ↗
08/13/2026B01165531-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B01165531-S2Open ↗
08/13/2026B01165531-I1Open ↗
08/13/2026B01165531-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01180147-I1Open ↗