← Back
Primarily 2 family with 1 store or office
1118 CLARKSON AVENUE
BROOKLYN · BIN 3101213
💬 Discuss this project
1910Year Built
2Stories
S2Building Class
R6Zoning
5,360 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,000 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT203/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513203/20/2023
Building Lifecycle
All (24)Filed (2)Permit Issued (1)Signed Off (1)Violation (2)Inspection (2)Special Inspection (16)
05/10/2023
Signed off — Alteration
INTERIOR RENOVATION OF THE FRONT APARTMENT ON 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY
B00765677-I1
05/09/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/06/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/22/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
03/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/22/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/22/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
03/22/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
03/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
03/22/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
03/20/2023
Filed — Alteration
INTERIOR RENOVATION OF THE FRONT APARTMENT ON 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY
B00765677-P1
03/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/10/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/10/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
03/10/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
03/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
03/10/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
03/10/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
07/05/2022
Permit issued — General Construction
B00765677-I1-GC
06/28/2022
Filed — Alteration
INTERIOR RENOVATION OF THE FRONT APARTMENT ON 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY
B00765677-I1
04/15/2002
Violation issued (HPD, open)
A
04/15/2002
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC07/05/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/09/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/22/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
03/22/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/22/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
03/22/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
03/22/2023Fenestration areasDEZHANG FANGenergy_progress
03/22/2023Interior lighting powerDEZHANG FANGenergy_progress
03/22/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
03/22/2023Fenestration air leakageDEZHANG FANGenergy_progress
03/10/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/10/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
03/10/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
03/10/2023Fenestration air leakageDEZHANG FANGenergy_progress
03/10/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
03/10/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
03/10/2023Fenestration areasDEZHANG FANGenergy_progress
03/10/2023Interior lighting powerDEZHANG FANGenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026B00765677-I1Request digital key ↗
08/29/2026B00765677-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00765677-P1Open ↗
09/01/2026B00765677-P1Open ↗
08/25/2026B00765677-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026B00765677-P1Open ↗
08/29/2026B00765677-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00765677-P1Open ↗
08/25/2026B00765677-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026B00765677-P1Open ↗
08/29/2026B00765677-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00765677-I1Open ↗