1119 42ND STREET
BROOKLYN · Borough Park · BIN 3430096
💬 Discuss this project
2024Year Built
—Stories
C1Building Class
R6Zoning
10,463 sfGross Floor Area
8Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 1119 42 St · 4,708 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTemporary pipe scaffold installationUnder Construction83p · 2 filings · 20 docs
BulkheadUnder Construction7p · 1 filing · 20 docs
Floor 4Temporary pipe scaffold installationUnder Construction154p · 2 filings · 20 docs
Floor 3Temporary pipe scaffold installationUnder Construction153p · 2 filings · 20 docs
Floor 2Temporary pipe scaffold installationUnder Construction150p · 2 filings · 20 docs
Floor 1Temporary pipe scaffold installationUnder Construction155p · 3 filings · 20 docs
MezzanineTemporary pipe scaffold installationUnder Construction148p · 2 filings · 20 docs
CellarUnder Construction146p · 1 filing · 20 docs
Site & exteriorTemporary sidewalk shed installationUnder Construction162p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2020$2.1M—1119 42 LLC → Private party— not available
07/25/2019$1.7M—Private party → 1119 42 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Binyan Expediting203/21/2026
NYC Permit Services2803/21/2026
Advanced Builders Services903/21/2026
AE Design Solution803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BB EmpireGeneral Contractor3308/26/2026
BB EmpireScaffold407/08/2026
Core Scaffold SystemsScaffold307/08/2026
Ness Mechanical P & HPlumbing307/22/2026
Design N SafetyScaffold107/08/2026
Quality PipingFire Protection107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56162610/12/2026
Building Lifecycle
All (196)Filed (33)Permit Issued (39)Signed Off (11)Violation (7)Inspection (5)Objection (71)Special Inspection (30)
10/12/2026
Filed — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-B2
08/26/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-S7
08/25/2026
Permit issued — General Construction
B00766828-I1-GC
08/24/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-S1
07/27/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-Z3
07/27/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-S9
07/27/2026
Permit issued — General Construction
B00766828-I1-GC
07/20/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-Z1
07/20/2026
Permit issued — Plumbing
B00766828-Z2-PL
07/08/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-S2
07/07/2026
Filed — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-B1
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/02/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
07/01/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Other
06/23/2026
Filed — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-A9
06/19/2026
Filed — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-A8
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/18/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/10/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/10/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/29/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
05/29/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
05/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/29/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
05/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/29/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/29/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/29/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/29/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/29/2026
Special inspection requirement — Metering
FAHAD FATEH
05/29/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/29/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/29/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/29/2026
Special inspection requirement — Masonry
FAHAD FATEH
05/29/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/14/2026
Objection resolved — Addressed
05/12/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-S5
05/08/2026
Signed off — Alteration
B00567279-I1
05/08/2026
Signed off — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-S4
05/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01215449-I1
05/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01233385-I1
04/22/2026
Permit issued — Sidewalk Shed
B01215449-I1-SH
04/14/2026
Permit issued — Construction Fence
B00766828-S4-FN
04/01/2026
Objection raised — Other
03/31/2026
Permit issued — Construction Fence
B00766828-S4-FN
03/16/2026
Filed — New Building
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
B00766828-A7
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/12/2026
Permit issued — Support of Excavation
B00766828-S5-SE
02/11/2026
Permit issued — Foundation
B00766828-S7-FO
02/10/2026
Permit issued — Structural
B00766828-S2-ST
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBB Empire08/25/2026
DOB NOWGeneral ConstructionPermit IssuedBB Empire07/27/2026
DOB NOWPlumbingPermit IssuedNess Mechanical P & H07/20/2026
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/22/2026
DOB NOWConstruction FenceSigned-offBB Empire04/14/2026
DOB NOWConstruction FenceSigned-offBB Empire03/31/2026
DOB NOWSupport of ExcavationSigned-offBB Empire02/12/2026
DOB NOWFoundationSigned-offBB Empire02/11/2026
DOB NOWStructuralSigned-offBB Empire02/10/2026
DOB NOWFoundationSigned-offBB Empire02/05/2026
DOB NOWBoiler EquipmentSigned-offNess Mechanical P & H02/03/2026
DOB NOWGeneral ConstructionPermit IssuedBB Empire10/31/2025
DOB NOWGeneral ConstructionPermit IssuedBB Empire08/26/2025
DOB NOWSprinklersSigned-offQuality Piping08/01/2025
DOB NOWPlumbingPermit IssuedNess Mechanical P & H07/22/2025
DOB NOWMechanical SystemsSigned-offBB Empire07/16/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/11/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/28/2025
DOB NOWStructuralSigned-offBB Empire03/18/2025
DOB NOWSupport of ExcavationSigned-offBB Empire03/18/2025
DOB NOWConstruction FenceSigned-offBB Empire03/10/2025
DOB NOWFoundationSigned-offBB Empire03/05/2025
DOB NOWFoundationSigned-offBB Empire03/05/2025
DOB NOWGeneral ConstructionPermit IssuedBB Empire03/04/2025
DOB NOWStructuralSigned-offBB Empire12/09/2024
DOB NOWFoundationSigned-offBB Empire12/05/2024
DOB NOWSupport of ExcavationSigned-offBB Empire12/05/2024
DOB NOWGeneral ConstructionPermit IssuedBB Empire11/12/2024
DOB NOWSupport of ExcavationSigned-offBB Empire11/08/2024
DOB NOWFoundationSigned-offBB Empire11/08/2024
DOB NOWFoundationSigned-offBB Empire11/08/2024
DOB NOWGeneral ConstructionPermit IssuedBB Empire11/07/2024
DOB NOWFoundationSigned-offBB Empire11/06/2024
DOB NOWSupport of ExcavationSigned-offBB Empire05/29/2024
DOB NOWFoundationSigned-offBB Empire05/29/2024
DOB NOWFoundationSigned-offBB Empire05/07/2024
DOB NOWGeneral ConstructionPermit IssuedBB Empire03/12/2024
DOB NOWConstruction FenceSigned-offBB Empire03/08/2024
DOB NOWConstruction FenceSigned-offDesign N Safety10/04/2021
1 project · most recent 10/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/12/2026Permit IssuedBB EmpireHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×8
MXZ-SM36NAM2 36,000 BTU · Condensing Unit ×2
MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×2
1 project · most recent 10/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/12/2026Permit IssuedQuality PipingGas, Storm, Water/Sanitary
3 projects · most recent 09/06/2026
General Wiring
FiledStatusContractorScope
09/06/2026CompleteAdd Electrical ContractingGeneral Wiring
04/25/2025CompleteSolas Electrical—
07/09/2024CompleteTrue Power Electrical Cont—
1 project · most recent 10/12/2026
Steel Concrete
FiledStatusContractorScope
10/12/2026Permit IssuedBB EmpireSteel, Concrete
3 projects · most recent 10/12/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
10/12/2026Permit IssuedBB EmpireFence
11/21/2025Signed-offCore Scaffold SystemsScaffold
05/15/2025Signed-offCore Scaffold SystemsSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/02/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/02/2026Sprinkler SystemsFAHAD FATEHspecial
06/18/2026Sprinkler SystemsFAHAD FATEHspecial
06/18/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/10/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/10/2026Heating SystemsFAHAD FATEHspecial
06/10/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/10/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/10/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/10/2026Maintenance informationFAHAD FATEHenergy_progress
05/29/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/29/2026Fenestration air leakageFAHAD FATEHenergy_progress
05/29/2026Exterior lighting powerFAHAD FATEHenergy_progress
05/29/2026Interior lighting powerFAHAD FATEHenergy_progress
05/29/2026Maintenance informationFAHAD FATEHenergy_progress
05/29/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/29/2026Fenestration areasFAHAD FATEHenergy_progress
05/29/2026MeteringFAHAD FATEHenergy_progress
05/29/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/29/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/29/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/29/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/29/2026MasonryFAHAD FATEHspecial
05/29/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/29/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
09/01/2026B00567279-I1Request digital key ↗
08/21/2026B01215449-I1Request digital key ↗
08/21/2026B01215449-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/30/2024340912105Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/30/2024340912105Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/18/2026B00766828-A7Open ↗
08/13/2026B00766828-P1Open ↗
08/13/2026B00766828-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/18/2026B00766828-A7Open ↗
08/13/2026B00766828-P1Open ↗
08/13/2026B00766828-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B00766828-I1Open ↗
▸Seals & Professional Certifications91
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/01/2026B00567279-I1Open ↗
08/21/2026B01215449-I1Open ↗
08/21/2026B01215449-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/29/2026B00766828-A2Open ↗
09/29/2026B00766828-A2Open ↗
09/23/2026B00766828-S2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/29/2026B00766828-A2Open ↗
09/23/2026B00766828-S2Open ↗
09/20/2026B00766828-P2Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2024340912105Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/30/2024340912105Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/18/2026B00766828-A7Open ↗
08/13/2026B00766828-A1Open ↗
08/13/2026B00766828-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/18/2026B00766828-A7Open ↗
08/15/2026B00766828-A1Open ↗
08/14/2026B00766828-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/30/2024340912105Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/30/2024340912105Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00766828-I1Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT10
08/13/2026B00766828-P8Open ↗
08/13/2026B00766828-P5Open ↗
08/13/2026B00766828-P6Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00766828-S1Open ↗
08/13/2026B00766828-S5Open ↗
08/13/2026B00766828-S7Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2024340912105Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/18/2026B00766828-A7Open ↗
08/13/2026B00766828-P1Open ↗
08/13/2026B00766828-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/18/2026B00766828-A7Open ↗
08/13/2026B00766828-I1Open ↗
08/13/2026B00766828-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/18/2026B00766828-A7Open ↗
08/15/2026B00766828-A1Open ↗
08/14/2026B00766828-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
11/12/2024340912105Open ↗
11/12/2024340912105Open ↗
08/30/2024340912105Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00766828-S5Open ↗