Pier, dock, bulkhead
111A 11 AVENUE
MANHATTAN · BIN 1012256
💬 Discuss this project
1908Year Built
4Stories
T2Building Class
M2-3Zoning
105,472 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 1 unresolved · 7 paperwork only ▸
Pier, dock, bulkhead · Owner of record: HUDSON RIVER PARK TRUST · 306,950 sf lot · 0.34 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Roof34p · 15 filings · 20 docs
Floor 212p · 9 filings · 20 docs
Floor 131p · 15 filings · 20 docs
Mezzanine65p · 18 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHELSEA PIERS MANAGEMENT, INC.47109/13/2026
PIER 59 STUDIOS607/08/2026
HUDSON RIVER PARK TRUST103/22/2026
CHELSEA PIERS LP CHELSEA PIERS1503/22/2026
STATE OF NY DEPT OF TRANS103/22/2026
DEPT RE CITY OF NY103/22/2026
TO THE OWNER OF 23 ST W H103/22/2026
DEPARTMENT OF GENERAL SER103/22/2026
THE OWNER OF103/22/2026
LIGHTHOUSE303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.18803/21/2026
SPRING SCAFFOLDING LLC1203/21/2026
MUNICIPAL BUILDING CONSULTANTS603/21/2026
BROMARK CONSULTING SERVICES103/21/2026
DI DIO ARCHITECTURE, PC203/21/2026
BUILDING BROTHERS403/21/2026
A E C CONSULTING EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLONIAL CRAFTERS INCGeneral Contractor4807/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor807/08/2026
ACCURATE MECHANICAL INCFire Protection707/08/2026
CHELSEA PIERS, LP.ETALGeneral Contractor606/28/2026
LCS PLUMBING&CONSULT INCPlumbing507/08/2026
HC DESIGN GROUP INCGeneral Contractor507/08/2026
AIR FORCE MECHANICAL CORPGeneral Contractor507/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing407/08/2026
WINICK PRODUCTIONS, LLCGeneral Contractor307/08/2026
ARENA EVENT SERVICES INCGeneral Contractor307/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection207/08/2026
AMI AND ASSOCIATES INCFire Protection207/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
BP MECHANICAL CORPGeneral Contractor203/21/2026
STARR TENT & EVENT GROUPGeneral Contractor107/02/2026
THANASI ELECTRICAL LLCGeneral Contractor104/09/2026
ACCURATE MECH INDSTRS INCPlumbing107/08/2026
CK PLUMBING & MECH INCPlumbing107/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
MCL NY INDUSTRIES CORPPlumbing107/08/2026
NATIONWIDE MECHANICAL INCPlumbing107/08/2026
POWER PLUMBING & HEATINGPlumbing107/08/2026
ACTIVE SIGNSScaffold107/08/2026
GUDERSKI, STANLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2547506/29/2026
ALLEN+KILLCOYNE ARCHITECT2697307/01/2025
RP ENGINEERING, PC7930103/07/2024
PIRO STUDIO LLC7503101/05/2023
FUTURE TECH CONSULTANTS O589812/15/2020
LL ENGINEERING PC1618208/27/2019
Building Lifecycle
All (300)Filed (70)Permit Issued (74)Signed Off (47)Violation (7)Inspection (60)Objection (12)Special Inspection (30)
08/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Signed off — Alteration
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
M01371893-I1
07/29/2026
Signed off — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-S1
07/29/2026
Signed off — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-I1
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/09/2026
Permit issued — General Construction
M01420426-I1-GC
07/08/2026
Signed off — Alteration
M01315051-I1
07/07/2026
Signed off — Alteration
Interior and exterior demolition and construction for existing commercial space at Pier 60 (Headhouse Center)
M01282124-I1
06/30/2026
Permit issued — General Construction
M01417642-I1-GC
06/30/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/29/2026
Filed — Alteration
Interior demolition and construction for staff locker room renovation @ Pier 60
M01420426-I1
06/29/2026
Permit issued — Plumbing
M01397743-I1-PL
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/26/2026
Signed off — Alteration
Mechanical work for Swim Center at Pier 60 (Headhouse Center)
M01315041-I1
06/26/2026
Signed off — Alteration
Structural framing associated with interior renovation & new facade along a portion of the perimeter. Partial demolition of bldg. interior & non-load bearing exterior perimeter wall, using handheld demolition devices
M01285116-I1
06/25/2026
Filed — No Work
M01418248-I1
06/23/2026
Permit issued — Mechanical Systems
M01397739-I1-MS
06/23/2026
Permit issued — General Construction
M01397731-I1-GC
06/22/2026
Filed — Alteration
M01417642-I1
06/16/2026
Special inspection requirement — Final
DANNY TRUJILLO
06/15/2026
Filed — Alteration
Plumbing work for for Suite 300 @ Pier 62
M01397743-I1
06/15/2026
Filed — Alteration
General construction work for Suite 300 @ Pier 62
M01397731-I1
06/15/2026
Filed — Alteration
Mechanical work for Suite 300 @ Pier 62
M01397739-I1
06/15/2026
Signed off — Alteration
mechanical work during renovation of existing bar lounge in golf club
M00274526-I1
06/05/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
06/05/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
06/05/2026
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
06/04/2026
Filed — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-P1
06/04/2026
Filed — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-P2
05/20/2026
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/14/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
05/14/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
04/15/2026
Objection raised — Scope
04/15/2026
Objection resolved — Resolved
04/10/2026
Permit issued — General Construction
M01371893-I1-GC
04/07/2026
Objection resolved — Addressed
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Filed — Alteration
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
M01371893-I1
03/20/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
03/19/2026
Objection raised — Fire_Protection
03/17/2026
Objection raised — Other
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection raised — Other
03/17/2026
Objection resolved — Addressed
03/16/2026
Filed — No Work
M01371654-I1
03/11/2026
Permit issued — Structural
M01334280-I1-ST
03/11/2026
Permit issued — General Construction
M01334254-I1-GC
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Filed — No Work
M01312001-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKENTAUROS CONTRACTING COR07/09/2026
DOB NOWGeneral ConstructionPermit IssuedSTARR TENT & EVENT GROUP06/30/2026
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR06/29/2026
DOB NOWMechanical SystemsPermit IssuedCOLONIAL CRAFTERS INC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL CRAFTERS INC06/23/2026
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC04/10/2026
DOB NOWStructuralPermit IssuedCHELSEA PIERS, LP.ETAL03/11/2026
DOB NOWGeneral ConstructionPermit IssuedCHELSEA PIERS, LP.ETAL03/11/2026
DOB NOWSprinklersSigned-offAMI AND ASSOCIATES INC12/10/2025
DOB NOWStandpipeSigned-offAMI AND ASSOCIATES INC12/10/2025
DOB NOWPlumbingSigned-offACCURATE MECH INDSTRS INC11/28/2025
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR11/28/2025
DOB NOWMechanical SystemsSigned-offCOLONIAL CRAFTERS INC11/21/2025
DOB NOWStructuralPermit IssuedCHELSEA PIERS, LP.ETAL10/24/2025
DOB NOWSuspended ScaffoldSigned-offVERTICAL ACCESS LLC10/23/2025
DOB NOWMechanical SystemsPermit IssuedAIR FORCE MECHANICAL10/23/2025
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL CRAFTERS INC10/21/2025
DOB NOWSignSigned-offACTIVE SIGNS INC10/20/2025
DOB NOWStructuralSigned-offCOLONIAL CRAFTERS INC10/02/2025
DOB NOWGeneral ConstructionSigned-offCOLONIAL CRAFTERS INC09/25/2025
DOB NOWGeneral ConstructionSigned-offCOLONIAL CRAFTERS INC08/20/2025
DOB NOWMechanical SystemsSigned-offCOLONIAL CRAFTERS INC08/20/2025
DOB NOWStructuralPermit IssuedCOLONIAL CRAFTERS INC08/13/2025
DOB NOWGeneral ConstructionPermit IssuedCOLONIAL CRAFTERS INC08/05/2025
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP02/03/2025
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP02/03/2025
DOB NOWPlumbingSigned-offPOWER PLUMBING & HEATING01/31/2025
DOB NOWMechanical SystemsPermit IssuedAIR FORCE MECHANICAL01/24/2025
DOB NOWMechanical SystemsSigned-offPRISTINE AIR CONDITIONING12/26/2024
DOB NOWStructuralSigned-offHC DESIGN GROUP12/19/2024
DOB NOWGeneral ConstructionSigned-offHC DESIGN GROUP12/19/2024
DOB NOWPlumbingSigned-offATTENTION TO DETAIL P&H.I12/02/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC11/19/2024
DOB NOWPlumbingSigned-offANTHONY DISABATO11/14/2024
DOB NOWStandpipeSigned-offACCURATE MECHANICAL INC11/13/2024
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC11/12/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/08/2024
DOB NOWMechanical SystemsSigned-offCOLONIAL CRAFTERS INC11/06/2024
DOB NOWPlumbingSigned-offATTENTION TO DETAIL P&H.I10/25/2024
DOB NOWStandpipeSigned-offACCURATE MECHANICAL INC10/08/2024
+ 60 more permits on file
3 projects · most recent 11/19/2025
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/19/2025Signed-offCOLONIAL CRAFTERS INCHeating and Air Conditioning Systems
Heat / Cool
Daikin REYGQ216AATJA 216,000 BTU · Condensing Unit ×1
Dectron DS-060-PG-I-A3NH5602W2E5BN3H 179,400 BTU · Split System ×1
10/10/2025Permit IssuedAIR FORCE MECHANICAL CORPHeating and Air Conditioning Systems
Heat / Cool
Ei Solution FLEX-080-PB-ERV 484,000 BTU · Erv ×2
Aaon RNA-060-D-3-GJBOB-CB2L0 517,500 BTU · Rooftop Unit ×1
08/27/2019——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
York YFK48B21S 4 tons · Condensing Unit ×1
Heating
York ×1
Ventilation
York AVC48CX21 4 tons · Ahu ×1
2 projects · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026Signed-offAMI AND ASSOCIATES INC453 heads, 8 outlets
04/15/2020Signed-offJ. CAIAZZO PLBG & HTG COR6 heads
3 projects · most recent 06/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/15/2026Permit IssuedJ. CAIAZZO PLBG & HTG CORWater/Sanitary
06/04/2026———
10/10/2025Permit IssuedJ. CAIAZZO PLBG & HTG CORGas
18 projects · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026Permit IssuedFIVE BOROUGH ELECTRIC INCGeneral Wiring
10/30/2025Permit IssuedTRITECH ELECTL & DATA INC—
10/20/2025CompleteRAINBOW ELECTRIC CO., INC—
05/19/2025CompleteTHANASI ELECTRICAL, LLCGeneral Wiring
01/27/2025CompletePOWER ELECTRICAL CONTS INGeneral Wiring
11/11/2024CompleteTOP SHELF ELECTRIC CORP—
09/13/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/14/2024CompleteEMPIRE STATE ELEC MAINT &General Wiring
04/18/2024CompleteTOP SHELF ELECTRIC CORP—
12/12/2023CompleteTHANASI ELECTRICAL, LLC1 meters
04/18/2023Permit IssuedTHANASI ELECTRICAL, LLCGeneral Wiring
10/05/2022Permit IssuedSAFETECH ELECL CONTNG CORGeneral Wiring
09/10/2021Permit IssuedRAINBOW ELECTRIC CO., INC—
02/03/2020CompleteBEACON ELECTRIC CORP.General Wiring
09/09/2019CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
2 projects · most recent 09/22/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/22/2025Signed-offCOLONIAL CRAFTERS INCSteel, Concrete, Masonry
08/06/2025Permit IssuedCOLONIAL CRAFTERS INCSteel, Concrete
▾Field Inspections (DOB CAP) — 63
DateTypeResultReport
08/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/30/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/07/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
Latest 25 of 63.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/16/2026FinalDANNY TRUJILLOprogress
06/05/2026Sprinkler SystemsMAURICIO ANDRADEspecial
06/05/2026Post-installed AnchorsMAURICIO ANDRADEspecial
06/05/2026Standpipe SystemsMAURICIO ANDRADEspecial
06/05/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/20/2026Standpipe SystemsMAURICIO ANDRADEspecial
05/14/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/14/2026Post-installed AnchorsMAURICIO ANDRADEspecial
05/14/2026Sprinkler SystemsMAURICIO ANDRADEspecial
03/20/2026FinalANDY ENGLER ROTHprogress
01/27/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
01/27/2026FinalDaniel Allenprogress
01/27/2026Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
01/27/2026Post-installed AnchorsMAURICIO ANDRADEspecial
01/23/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
01/23/2026Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
01/23/2026FinalDaniel Allenprogress
01/23/2026Post-installed AnchorsMAURICIO ANDRADEspecial
12/15/2025Fire-Resistance Rated ConstructionDaniel Allenprogress
12/15/2025FinalDaniel Allenprogress
12/15/2025Fire-Resistant Penetrations and JointsDaniel Allenspecial
11/07/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
11/07/2025Post-installed AnchorsMAURICIO ANDRADEspecial
11/06/2025FinalMAURICIO ANDRADEprogress
11/06/2025Mechanical SystemsMAURICIO ANDRADEspecial
Latest 25 of 150.
▾Documents — 1,556 on file (BIS + DOB NOW)
▸Plans & Drawings135
▸DOB NOWPlans/Sketch101
09/06/2026M01371893-I1Request digital key ↗
09/03/2026M00586909-I1Request digital key ↗
09/02/2026M00761303-I1Request digital key ↗
Showing 3 of 101 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly15
09/05/2026M00151467-I1Request digital key ↗
09/05/2026M00246001-I1Request digital key ↗
09/05/2026M00252573-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00210830-I1Request digital key ↗
09/05/2026M00326983-I1Request digital key ↗
09/04/2026M00274526-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00216064-I1Request digital key ↗
09/05/2026M00274531-I1Request digital key ↗
09/05/2026M00274531-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/04/2026M00350823-I1Request digital key ↗
Showing 1 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00216031-I1Request digital key ↗
09/05/2026M00274532-I1Request digital key ↗
09/05/2026M00326992-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00277997-I1Request digital key ↗
▸Applications & Permits230
▸BISPLAN / WORK APPROVAL APPLICATION134
09/23/2025100619957Open ↗
09/22/2025100619957Open ↗
09/16/2025100619957Open ↗
Showing 3 of 134 on file for this type
▸BISWORK PERMIT APPLICATION87
03/09/2022140731821Open ↗
03/09/2022140731821Open ↗
12/02/2020123831648Open ↗
Showing 3 of 87 on file for this type
▸BISPLACE OF ASSEMBLY8
03/12/2020104528986Open ↗
02/14/2020104528986Open ↗
Showing 2 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/19/2020100619957Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFLOOD ZONE COMPLIANCE1
07/05/2022140731821Open ↗
▸Seals & Professional Certifications508
▸DOB NOWDPL-1: Design Professional Seal & Signature134
09/06/2026M01371893-I1Open ↗
09/05/2026M00118455-I1Open ↗
09/05/2026M00216031-I1Open ↗
Showing 3 of 134 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION122
04/24/2020123869732Open ↗
04/24/2020123869732Open ↗
03/13/2020123831648Open ↗
Showing 3 of 122 on file for this type
▸DOB NOWProgress Inspector Seal & Signature101
09/29/2026M00992871-I1Open ↗
09/23/2026M01071038-I1Open ↗
09/23/2026M00274526-P1Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature66
09/29/2026M00992871-I1Open ↗
09/23/2026M01071038-I1Open ↗
09/23/2026M01315066-I1Open ↗
Showing 3 of 66 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST34
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
10/25/2019123696438Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT26
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
10/25/2019123696438Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment79
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE25
02/24/2020140731821Open ↗
09/13/2019123670900Open ↗
09/11/2019123670900Open ↗
Showing 3 of 25 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/07/2022140731821Open ↗
07/07/2022140731821Open ↗
07/07/2022140731821Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/07/2022140731821Open ↗
Showing 1 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER SYSTEMS2
10/01/2024120225050Open ↗
10/01/2024120225050Open ↗
▸BISSTANDPIPE SYSTEMS2
10/01/2024120225050Open ↗
10/01/2024120225050Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos148
▸DOB NOWDEP ACP-5: Asbestos Assessment Report97
09/05/2026M00216031-I1Open ↗
09/05/2026M00326990-I1Open ↗
09/05/2026M00326990-P1Open ↗
Showing 3 of 97 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)29
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
08/20/2019123771604Open ↗
Showing 3 of 29 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance51
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS27
03/13/2020123831648Open ↗
03/02/2020123771604Open ↗
03/02/2020123771604Open ↗
Showing 3 of 27 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
06/08/2020123670900Open ↗
03/02/2020123771604Open ↗
11/25/2019123771604Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/03/2020123831648Open ↗
06/08/2020123670900Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/05/2022140731821Open ↗
09/01/2021123831648Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
09/03/2021123831648Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/20/2024120225050Open ↗
06/08/2020123670900Open ↗
Showing 2 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/01/2021123831648Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
07/05/2022140731821Open ↗
▸Approvals, Objections & Sign-offs117
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST60
11/20/2024120225050Open ↗
03/14/2023140833515Open ↗
09/28/2022123696438Open ↗
Showing 3 of 60 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
09/23/2025100619957Open ↗
09/22/2025100619957Open ↗
09/16/2025100619957Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER3
03/09/2022140731821Open ↗
03/09/2022140731821Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL3
09/26/2022123696438Open ↗
09/03/2021123831648Open ↗
08/26/2020123725861Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
05/25/2022140833515Open ↗
▸BISMaster Plumber Seal Temporary Approval Letter1
03/09/2022140731821Open ↗
▸BISPRIOR TO NEXT TCO PROVIDE DOH APPROVAL FOR SWIMMING POOL, SAUNA AND STEAM ROOM1
03/18/2025100619957Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership93
▸BISCOST AFFIDAVIT87
05/25/2022140833515Open ↗
06/08/2020123670900Open ↗
03/13/2020123831648Open ↗
Showing 3 of 87 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
10/01/2024120225050Open ↗
09/26/2022123696438Open ↗
07/05/2022140731821Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms150
▸BISEFILING COVER SHEET56
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
10/25/2019123696438Open ↗
Showing 3 of 56 on file for this type
▸BISBOROUGH INTAKE FORM53
03/09/2022140731821Open ↗
04/24/2020123869732Open ↗
03/06/2020100619957Open ↗
Showing 3 of 53 on file for this type
▸BISADDITIONAL INFORMATION39
09/26/2025100619957Open ↗
06/13/2025100619957Open ↗
12/13/2024100619957Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProof of Historic Building8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL1
09/01/2021123831648Open ↗
▸DOB NOWAlternate Plan 11
09/04/2026M00350823-I1Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type