LL97 Covered5 Active Violations 0 unresolved · 5 paperwork only ▸
Pier, dock, bulkhead · Owner of record: Hudson River Park Trust · 306,950 sf lot · 0.34 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofChelsea Piers, Arte Museum +3Under Construction75p · 20 filings · 20 docs
Floor 36p · 1 filing · 9 docs
Floor 2Chelsea Piers, Pier59studios +3Under Construction99p · 33 filings · 20 docs
Floor 1CPNY Pier 61, CPNY Swim Center +4Under Construction226p · 46 filings · 20 docs
MezzaninePier Sixty, Chelsea Piers +3Under Construction229p · 36 filings · 20 docs
Site & exteriorChelsea Piers, Classic Harbor Line +1Under Construction23p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chelsea Piers2203/21/2026
Pier 59 Studios607/08/2026
Hudson River Park Trust103/22/2026
Artland Fashion Group103/21/2026
Pier 62103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates18803/21/2026
Spring Scaffolding1203/21/2026
Municipal Building Consultants603/21/2026
Bromark Consulting Services103/21/2026
DI Dio Architecture203/21/2026
Building Brothers403/21/2026
AEC Consulting Expediting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Colonial CraftersGeneral Contractor4807/08/2026
Spring ScaffoldingScaffold807/08/2026
Accurate MechanicalFire Protection707/08/2026
Chelsea Piers, LP EtalGeneral Contractor606/28/2026
Air Force Mechanicalspecialty_contractor507/08/2026
HC Design GroupGeneral Contractor507/08/2026
LCS Plumbing & ConsultingPlumbing507/08/2026
J. Caiazzo Plumbing & HeatingPlumbing407/08/2026
Arena Event ServicesGeneral Contractor307/08/2026
Winick ProductionsGeneral Contractor307/08/2026
Safety Fire SprinklerFire Protection207/08/2026
BP Mechanicalspecialty_contractor203/21/2026
Accurate MechanicalPlumbing207/08/2026
Ami and AssociatesFire Protection207/08/2026
J. Caiazzo Plumbing & HeatingFire Protection207/08/2026
Pristine Air Conditioningspecialty_contractor107/08/2026
Starr Tent & Event GroupGeneral Contractor107/02/2026
Thanasi Electricalspecialty_contractor104/09/2026
Double "R" Electrical ContractingElectrical103/21/2026
Ragen RodneyElectrical103/21/2026
Active SignsSign hanger107/08/2026
R.G.M. SignsSign hanger107/08/2026
Power Plumbing & HeatingPlumbing107/08/2026
Beacon ElectricElectrical103/21/2026
Accurate Mechanical IndstrsPlumbing107/08/2026
RCI Fire ProtectionFire Protection107/08/2026
CK Plumbing & MechanicalPlumbing107/08/2026
DC Building ServicesFire Protection107/08/2026
Donato PlumbingPlumbing107/08/2026
Inter Connection ElectricElectrical103/21/2026
Salzman Electric CoElectrical103/21/2026
Lite-Tron ElectricalElectrical103/21/2026
MCL NY IndustriesPlumbing107/08/2026
Nationwide MechanicalPlumbing107/08/2026
RPM ElectricElectrical103/21/2026
Skowronski JeffElectrical103/21/2026
Kentauros ContractingGeneral Contractor107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency2547506/29/2026
ALLEN+KILLCOYNE Architect2697307/01/2025
RP Engineering7930103/07/2024
Piro Studio7503101/05/2023
Future Tech Consultants O589812/15/2020
LL Engineering1618208/27/2019
Building Lifecycle
All (300)Filed (73)Permit Issued (80)Signed Off (46)Violation (7)Inspection (51)Objection (13)Special Inspection (30)
09/01/2026
Filed — Alteration
General construction for new laundry room as accessory use for existing Pier 61 Banquet Hall
M01334254-P1
08/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Allen
08/28/2026
Special inspection requirement — Final
Daniel Allen
08/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Signed off — Alteration
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
M01371893-I1
07/29/2026
Signed off — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-S1
07/29/2026
Signed off — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-I1
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/09/2026
Permit issued — General Construction
M01420426-I1-GC
07/08/2026
Signed off — Alteration
M01315051-I1
07/07/2026
Signed off — Alteration
Interior and exterior demolition and construction for existing commercial space at Pier 60 (Headhouse Center)
M01282124-I1
06/30/2026
Permit issued — General Construction
M01417642-I1-GC
06/30/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/29/2026
Filed — Alteration
Interior demolition and construction for staff locker room renovation @ Pier 60
M01420426-I1
06/29/2026
Permit issued — Plumbing
M01397743-I1-PL
06/29/2026
Violation issued (ECB, closed)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, open)
Construction
06/29/2026
Violation issued (ECB, closed)
Construction
06/26/2026
Signed off — Alteration
Structural framing associated with interior renovation & new facade along a portion of the perimeter. Partial demolition of bldg. interior & non-load bearing exterior perimeter wall, using handheld demolition devices
M01285116-I1
06/26/2026
Signed off — Alteration
Mechanical work for Swim Center at Pier 60 (Headhouse Center)
M01315041-I1
06/25/2026
Filed — No Work
M01418248-I1
06/23/2026
Permit issued — Mechanical Systems
M01397739-I1-MS
06/23/2026
Permit issued — General Construction
M01397731-I1-GC
06/22/2026
Filed — Alteration
M01417642-I1
06/16/2026
Special inspection requirement — Final
DANNY TRUJILLO
06/15/2026
Filed — Alteration
Plumbing work for for Suite 300 @ Pier 62
M01397743-I1
06/15/2026
Filed — Alteration
Mechanical work for Suite 300 @ Pier 62
M01397739-I1
06/15/2026
Signed off — Alteration
mechanical work during renovation of existing bar lounge in golf club
M00274526-I1
06/15/2026
Filed — Alteration
General construction work for Suite 300 @ Pier 62
M01397731-I1
06/05/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
06/05/2026
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
06/05/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
06/04/2026
Filed — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-P2
06/04/2026
Filed — Alteration
Sprinkler work for Swim Center at Pier 60 (Headhouse Center)
M01315066-P1
05/20/2026
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/14/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
05/14/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
04/15/2026
Objection raised — Scope
04/15/2026
Objection resolved — Resolved
04/10/2026
Permit issued — General Construction
M01371893-I1-GC
04/07/2026
Objection resolved — Addressed
03/23/2026
Filed — Alteration
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
M01371893-I1
03/20/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
03/19/2026
Objection raised — Fire_Protection
03/17/2026
Objection raised — Other
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection raised — Other
03/17/2026
Objection resolved — Addressed
03/16/2026
Filed — No Work
M01371654-I1
03/11/2026
Permit issued — General Construction
M01334254-I1-GC
03/11/2026
Permit issued — Structural
M01334280-I1-ST
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Filed — No Work
M01312001-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKentauros Contracting07/09/2026
DOB NOWGeneral ConstructionPermit IssuedStarr Tent & Event Group06/30/2026
DOB NOWPlumbingPermit IssuedJ. Caiazzo Plumbing & Heating06/29/2026
DOB NOWMechanical SystemsPermit IssuedColonial Crafters06/23/2026
DOB NOWGeneral ConstructionPermit IssuedColonial Crafters06/23/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions04/10/2026
DOB NOWGeneral ConstructionPermit IssuedChelsea Piers, LP Etal03/11/2026
DOB NOWStructuralPermit IssuedChelsea Piers, LP Etal03/11/2026
DOB NOWStandpipeSigned-offAmi and Associates12/10/2025
DOB NOWSprinklersSigned-offAmi and Associates12/10/2025
DOB NOWPlumbingSigned-offAccurate Mechanical Indstrs11/28/2025
DOB NOWPlumbingPermit IssuedJ. Caiazzo Plumbing & Heating11/28/2025
DOB NOWMechanical SystemsSigned-offColonial Crafters11/21/2025
DOB NOWStructuralPermit IssuedChelsea Piers, LP Etal10/24/2025
DOB NOWMechanical SystemsPermit IssuedAir Force Mechanical10/23/2025
DOB NOWSuspended ScaffoldSigned-offVertical Access10/23/2025
DOB NOWGeneral ConstructionPermit IssuedColonial Crafters10/21/2025
DOB NOWSignSigned-offActive Signs10/20/2025
DOB NOWStructuralSigned-offColonial Crafters10/02/2025
DOB NOWGeneral ConstructionSigned-offColonial Crafters09/25/2025
DOB NOWMechanical SystemsSigned-offColonial Crafters08/20/2025
DOB NOWGeneral ConstructionSigned-offColonial Crafters08/20/2025
DOB NOWStructuralPermit IssuedColonial Crafters08/13/2025
DOB NOWGeneral ConstructionPermit IssuedColonial Crafters08/05/2025
DOB NOWSprinklersSigned-offSafety Fire Sprinkler02/03/2025
DOB NOWStandpipeSigned-offSafety Fire Sprinkler02/03/2025
DOB NOWPlumbingSigned-offPower Plumbing & Heating01/31/2025
DOB NOWMechanical SystemsPermit IssuedAir Force Mechanical01/24/2025
DOB NOWMechanical SystemsSigned-offPristine Air Conditioning12/26/2024
DOB NOWStructuralSigned-offHC Design Group12/19/2024
DOB NOWGeneral ConstructionSigned-offHC Design Group12/19/2024
DOB NOWPlumbingSigned-offAttention to Detail P&H.I12/02/2024
DOB NOWPlumbingSigned-offDonato Plumbing11/19/2024
DOB NOWPlumbingSigned-offAnthony Disabato11/14/2024
DOB NOWStandpipeSigned-offAccurate Mechanical11/13/2024
DOB NOWSprinklersSigned-offAccurate Mechanical11/12/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/08/2024
DOB NOWMechanical SystemsSigned-offColonial Crafters11/06/2024
DOB NOWPlumbingSigned-offAttention to Detail P&H.I10/25/2024
DOB NOWStandpipeSigned-offAccurate Mechanical10/08/2024
+ 60 more permits on file
3 projects · most recent 11/19/2025
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/19/2025Signed-offColonial CraftersHeating and Air Conditioning Systems
Heat / Cool
Daikin REYGQ216AATJA 216,000 BTU · Condensing Unit ×1
Dectron DS-060-PG-I-A3NH5602W2E5BN3H 179,400 BTU · Split System ×1
10/10/2025Permit IssuedAir Force MechanicalHeating and Air Conditioning Systems
Heat / Cool
Ei Solution FLEX-080-PB-ERV 484,000 BTU · Erv ×2
Aaon RNA-060-D-3-GJBOB-CB2L0 517,500 BTU · Rooftop Unit ×1
08/27/2019——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
York YFK48B21S 4 tons · Condensing Unit ×1
Heating
York ×1
Ventilation
York AVC48CX21 4 tons · Ahu ×1
2 projects · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026Signed-offAmi and Associates453 heads, 8 outlets
04/15/2020Signed-offJ. Caiazzo Plumbing & Heating6 heads
3 projects · most recent 06/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/15/2026Permit IssuedJ. Caiazzo Plumbing & HeatingWater/Sanitary
06/04/2026———
10/10/2025Permit IssuedJ. Caiazzo Plumbing & HeatingGas
18 projects · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026Permit IssuedFive Borough ElectricGeneral Wiring
10/30/2025Permit IssuedTritech Electl & Data—
10/20/2025CompleteRainbow Electric Co—
05/19/2025CompleteThanasi ElectricalGeneral Wiring
01/27/2025CompletePower Electrical ContsGeneral Wiring
11/11/2024CompleteTop Shelf Electric—
09/13/2024CompleteJoseph Weinstein ElectricGeneral Wiring
06/14/2024CompleteEmpire State Electric MaintenanceGeneral Wiring
04/18/2024CompleteTop Shelf Electric—
12/12/2023CompleteThanasi Electrical1 meters
04/18/2023Permit IssuedThanasi ElectricalGeneral Wiring
10/05/2022Permit IssuedSafetech Electrical ContngGeneral Wiring
09/10/2021Permit IssuedRainbow Electric Co—
02/03/2020CompleteBeacon ElectricGeneral Wiring
09/09/2019CompleteLive Wire Electric 1General Wiring
2 projects · most recent 09/22/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/22/2025Signed-offColonial CraftersSteel, Concrete, Masonry
08/06/2025Permit IssuedColonial CraftersSteel, Concrete
▾Field Inspections (DOB CAP) — 51
DateTypeResultReport
08/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/30/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/07/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/31/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/28/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
Latest 25 of 51.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/28/2026FinalDaniel Allenprogress
08/28/2026Fire-Resistance Rated ConstructionDaniel Allenprogress
06/16/2026FinalDANNY TRUJILLOprogress
06/05/2026Standpipe SystemsMAURICIO ANDRADEspecial
06/05/2026Sprinkler SystemsMAURICIO ANDRADEspecial
06/05/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
06/05/2026Post-installed AnchorsMAURICIO ANDRADEspecial
05/20/2026Standpipe SystemsMAURICIO ANDRADEspecial
05/14/2026Sprinkler SystemsMAURICIO ANDRADEspecial
05/14/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/14/2026Post-installed AnchorsMAURICIO ANDRADEspecial
03/20/2026FinalANDY ENGLER ROTHprogress
01/27/2026FinalDaniel Allenprogress
01/27/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
01/27/2026Post-installed AnchorsMAURICIO ANDRADEspecial
01/27/2026Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
01/23/2026FinalDaniel Allenprogress
01/23/2026Post-installed AnchorsMAURICIO ANDRADEspecial
01/23/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
01/23/2026Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
12/15/2025FinalDaniel Allenprogress
12/15/2025Fire-Resistance Rated ConstructionDaniel Allenprogress
12/15/2025Fire-Resistant Penetrations and JointsDaniel Allenspecial
11/07/2025Post-installed AnchorsMAURICIO ANDRADEspecial
11/07/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pier SixtyEvents & gatheringsFloor 1, Mezzanine
Project M01420426 Alteration · Permit Entire · 06/29/2026
Project M01081787 Alteration · LOC Issued · 07/22/2024
Chelsea PiersFitness / RecreationFloors 1, 2, Mezzanine, Roof
Project M01397731 Alteration · Permit Entire · 06/15/2026
Project M01397739 Alteration · Permit Entire · 06/15/2026
Project M01397743 Alteration · Permit Entire · 06/15/2026
Project M01296353 Alteration · Permit Entire · 10/10/2025
Project M01296864 Alteration · Permit Entire · 10/10/2025
Project M01296871 Alteration · Permit Entire · 10/10/2025
Project M01282124 Alteration · LOC Issued · 09/22/2025
Project M01285116 Alteration · LOC Issued · 09/22/2025
Project M01112865 Alteration · LOC Issued · 09/24/2024
Project M00992921 Alteration · LOC Issued · 09/11/2024
Project M00969058 Alteration · LOC Issued · 03/07/2024
Project M00991524 Alteration · LOC Issued · 03/01/2024
Pier59studiosArts / Culture / EntertainmentFloor 2
Project M01371893 Alteration · LOC Issued · 03/23/2026
Project M08015447 Alteration · LOC Issued · 10/11/2022
Project M00761303 Alteration · LOC Issued · 06/21/2022
CPNY Pier 61Fitness / RecreationFloor 1
Project M01334254 Alteration · Permit Entire · 01/14/2026
Project M01334280 Alteration · Permit Entire · 01/14/2026
CPNY Swim CenterFitness / RecreationFloor 1, Mezzanine
Project M01315051 Alteration · LOC Issued · 11/21/2025
Project M01315041 Alteration · LOC Issued · 11/19/2025
Project M01315066 Alteration · LOC Issued · 11/19/2025
Arte MuseumArts / Culture / EntertainmentFloor 1, Mezzanine
Project M01124804 Alteration · LOC Issued · 12/17/2024
Project M01124811 Alteration · LOC Issued · 12/17/2024
Project M01124820 Alteration · LOC Issued · 12/17/2024
Project M01140324 Alteration · LOC Issued · 12/17/2024
Project M01141254 Alteration · LOC Issued · 12/17/2024
Project M01117151 Alteration · LOC Issued · 12/16/2024
Classic Harbor LineOtherGround
Project M01125542 Alteration · LOC Issued · 11/06/2024
District KoreaArts / Culture / EntertainmentFloors 1, 2, Mezzanine
Project M01071038 Alteration · LOC Issued · 07/25/2024
NetflixOfficeFloor 2
Project M01034860 Alteration · LOC Issued · 05/06/2024
BowleroFitness / RecreationRoof
Project M00983320 Alteration · LOC Issued · 03/26/2024
Sports Performance CenterFitness / RecreationFloor 1
Project M00991531 Alteration · LOC Issued · 03/01/2024
HaiteOtherFloor 1
Project M01000712 Alteration · LOC Issued · 02/06/2024
CPNYFitness / RecreationFloor 2
Project M00326983 Alteration · LOC Issued · 04/15/2020
CPNY Sky Rink TerraceFitness / RecreationFloor 2
Project M00326990 Alteration · LOC Issued · 04/15/2020
Sky Rink TerraceRestaurant / Food ServiceFloor 2
Project M00326992 Alteration · Permit Entire · 04/15/2020
Bowlmor Chelsea PiersFitness / RecreationFloor 1, Mezzanine
Project M00210830 Alteration · Approved · 08/27/2019
Project M00216031 Alteration · Permit Entire · 08/27/2019
Project M00216064 Alteration · Permit Entire · 08/27/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,560 on file (BIS + DOB NOW)
▸Plans & Drawings135
▸DOB NOWPlans/Sketch101
09/06/2026M01371893-I1Request digital key ↗
09/03/2026M00586909-I1Request digital key ↗
09/02/2026M00761303-I1Request digital key ↗
Showing 3 of 101 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly15
09/05/2026M00151467-I1Request digital key ↗
09/05/2026M00246001-I1Request digital key ↗
09/05/2026M00252573-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00210830-I1Request digital key ↗
09/05/2026M00326983-I1Request digital key ↗
09/04/2026M00274526-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00216064-I1Request digital key ↗
09/05/2026M00274531-I1Request digital key ↗
09/05/2026M00274531-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/04/2026M00350823-I1Request digital key ↗
Showing 1 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00216031-I1Request digital key ↗
09/05/2026M00274532-I1Request digital key ↗
09/05/2026M00326992-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00277997-I1Request digital key ↗
▸Applications & Permits230
▸BISPLAN / WORK APPROVAL APPLICATION134
09/23/2025100619957Open ↗
09/22/2025100619957Open ↗
09/16/2025100619957Open ↗
Showing 3 of 134 on file for this type
▸BISWORK PERMIT APPLICATION87
03/09/2022140731821Open ↗
03/09/2022140731821Open ↗
12/02/2020123831648Open ↗
Showing 3 of 87 on file for this type
▸BISPLACE OF ASSEMBLY8
03/12/2020104528986Open ↗
02/14/2020104528986Open ↗
Showing 2 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/19/2020100619957Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFLOOD ZONE COMPLIANCE1
07/05/2022140731821Open ↗
▸Seals & Professional Certifications512
▸DOB NOWDPL-1: Design Professional Seal & Signature134
09/06/2026M01371893-I1Open ↗
09/05/2026M00118455-I1Open ↗
09/05/2026M00216031-I1Open ↗
Showing 3 of 134 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION122
04/24/2020123869732Open ↗
04/24/2020123869732Open ↗
03/13/2020123831648Open ↗
Showing 3 of 122 on file for this type
▸DOB NOWProgress Inspector Seal & Signature104
10/14/2026M01334254-P1Open ↗
10/14/2026M01334254-P1Open ↗
10/08/2026M01071038-P1Open ↗
Showing 3 of 104 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature67
10/08/2026M01071038-P1Open ↗
09/29/2026M00992871-I1Open ↗
09/23/2026M01071038-I1Open ↗
Showing 3 of 67 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST34
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
10/25/2019123696438Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT26
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
10/25/2019123696438Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment79
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE25
02/24/2020140731821Open ↗
09/13/2019123670900Open ↗
09/11/2019123670900Open ↗
Showing 3 of 25 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/07/2022140731821Open ↗
07/07/2022140731821Open ↗
07/07/2022140731821Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/07/2022140731821Open ↗
Showing 1 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER SYSTEMS2
10/01/2024120225050Open ↗
10/01/2024120225050Open ↗
▸BISSTANDPIPE SYSTEMS2
10/01/2024120225050Open ↗
10/01/2024120225050Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos148
▸DOB NOWDEP ACP-5: Asbestos Assessment Report97
09/05/2026M00216031-I1Open ↗
09/05/2026M00326990-I1Open ↗
09/05/2026M00326990-P1Open ↗
Showing 3 of 97 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)29
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
08/20/2019123771604Open ↗
Showing 3 of 29 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance51
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS27
03/13/2020123831648Open ↗
03/02/2020123771604Open ↗
03/02/2020123771604Open ↗
Showing 3 of 27 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
06/08/2020123670900Open ↗
03/02/2020123771604Open ↗
11/25/2019123771604Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/03/2020123831648Open ↗
06/08/2020123670900Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/05/2022140731821Open ↗
09/01/2021123831648Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
09/03/2021123831648Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/20/2024120225050Open ↗
06/08/2020123670900Open ↗
Showing 2 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/01/2021123831648Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
07/05/2022140731821Open ↗
▸Approvals, Objections & Sign-offs117
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST60
11/20/2024120225050Open ↗
03/14/2023140833515Open ↗
09/28/2022123696438Open ↗
Showing 3 of 60 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
09/23/2025100619957Open ↗
09/22/2025100619957Open ↗
09/16/2025100619957Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER3
03/09/2022140731821Open ↗
03/09/2022140731821Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL3
09/26/2022123696438Open ↗
09/03/2021123831648Open ↗
08/26/2020123725861Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
05/25/2022140833515Open ↗
▸BISMaster Plumber Seal Temporary Approval Letter1
03/09/2022140731821Open ↗
▸BISPRIOR TO NEXT TCO PROVIDE DOH APPROVAL FOR SWIMMING POOL, SAUNA AND STEAM ROOM1
03/18/2025100619957Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership93
▸BISCOST AFFIDAVIT87
05/25/2022140833515Open ↗
06/08/2020123670900Open ↗
03/13/2020123831648Open ↗
Showing 3 of 87 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
10/01/2024120225050Open ↗
09/26/2022123696438Open ↗
07/05/2022140731821Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms150
▸BISEFILING COVER SHEET56
03/13/2020123831648Open ↗
12/24/2019123725861Open ↗
10/25/2019123696438Open ↗
Showing 3 of 56 on file for this type
▸BISBOROUGH INTAKE FORM53
03/09/2022140731821Open ↗
04/24/2020123869732Open ↗
03/06/2020100619957Open ↗
Showing 3 of 53 on file for this type
▸BISADDITIONAL INFORMATION39
09/26/2025100619957Open ↗
06/13/2025100619957Open ↗
12/13/2024100619957Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProof of Historic Building8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL1
09/01/2021123831648Open ↗
▸DOB NOWAlternate Plan 11
09/04/2026M00350823-I1Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type