| Owner | Filings | Most Recent |
|---|---|---|
| Chelsea Piers | 22 | 03/21/2026 |
| Pier 59 Studios | 6 | 07/08/2026 |
| Hudson River Park Trust | 1 | 03/22/2026 |
| Artland Fashion Group | 1 | 03/21/2026 |
| Pier 62 | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Allen + Killcoyne Architects | 16 | 09/01/2026 |
| Andrew Formichella | 3 | 06/25/2026 |
| Urban Integrations | 1 | 06/22/2026 |
| Kendall Engineering | 2 | 06/15/2026 |
| AMA Consulting Engineers | 19 | 06/04/2026 |
| SYNC Architecture | 13 | 03/23/2026 |
| Dewberry Engineers | 2 | 01/21/2026 |
| JBM and Associates | 6 | 01/14/2026 |
| Leon Skvirsky PE | 2 | 10/16/2025 |
| Me Engineers | 2 | 10/10/2025 |
| Severud Associates | 1 | 10/10/2025 |
| Gilsanz Murray Steficek | 1 | 09/22/2025 |
| NYC Department of Housing Preservation and Development | 7 | 09/17/2025 |
| Restructure Engineering | 2 | 08/06/2025 |
| HKC Engineering | 15 | 06/24/2025 |
| Silman | 2 | 06/11/2025 |
| Tohfaz Uddin PE | 6 | 11/08/2024 |
| Cosentini Associates | 21 | 11/06/2024 |
| RP Engineering | 1 | 03/07/2024 |
| Piro Studio | 1 | 01/05/2023 |
| Jack Stone Engineers | 4 | 02/26/2021 |
| Christopher McCagg | 1 | 06/08/2020 |
| C3D Architecture | 4 | 01/23/2020 |
| HNY Consulting Engineers | 3 | 08/27/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| J.A.M. Associates | 188 | 03/21/2026 |
| Spring Scaffolding | 12 | 03/21/2026 |
| Municipal Building Consultants | 6 | 03/21/2026 |
| Bromark Consulting Services | 1 | 03/21/2026 |
| DI Dio Architecture | 2 | 03/21/2026 |
| Building Brothers | 4 | 03/21/2026 |
| AEC Consulting Expediting | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Colonial Crafters | General Contractor | 48 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 8 | 07/08/2026 |
| Accurate Mechanical | Fire Protection | 7 | 07/08/2026 |
| Chelsea Piers, LP Etal | General Contractor | 6 | 06/28/2026 |
| Air Force Mechanical | specialty_contractor | 5 | 07/08/2026 |
| HC Design Group | General Contractor | 5 | 07/08/2026 |
| LCS Plumbing & Consulting | Plumbing | 5 | 07/08/2026 |
| J. Caiazzo Plumbing & Heating | Plumbing | 4 | 07/08/2026 |
| Arena Event Services | General Contractor | 3 | 07/08/2026 |
| Winick Productions | General Contractor | 3 | 07/08/2026 |
| Safety Fire Sprinkler | Fire Protection | 2 | 07/08/2026 |
| BP Mechanical | specialty_contractor | 2 | 03/21/2026 |
| Accurate Mechanical | Plumbing | 2 | 07/08/2026 |
| Ami and Associates | Fire Protection | 2 | 07/08/2026 |
| J. Caiazzo Plumbing & Heating | Fire Protection | 2 | 07/08/2026 |
| Pristine Air Conditioning | specialty_contractor | 1 | 07/08/2026 |
| Starr Tent & Event Group | General Contractor | 1 | 07/02/2026 |
| Thanasi Electrical | specialty_contractor | 1 | 04/09/2026 |
| Double "R" Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Ragen Rodney | Electrical | 1 | 03/21/2026 |
| Active Signs | Sign hanger | 1 | 07/08/2026 |
| R.G.M. Signs | Sign hanger | 1 | 07/08/2026 |
| Power Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Beacon Electric | Electrical | 1 | 03/21/2026 |
| Accurate Mechanical Indstrs | Plumbing | 1 | 07/08/2026 |
| RCI Fire Protection | Fire Protection | 1 | 07/08/2026 |
| CK Plumbing & Mechanical | Plumbing | 1 | 07/08/2026 |
| DC Building Services | Fire Protection | 1 | 07/08/2026 |
| Donato Plumbing | Plumbing | 1 | 07/08/2026 |
| Inter Connection Electric | Electrical | 1 | 03/21/2026 |
| Salzman Electric Co | Electrical | 1 | 03/21/2026 |
| Lite-Tron Electrical | Electrical | 1 | 03/21/2026 |
| MCL NY Industries | Plumbing | 1 | 07/08/2026 |
| Nationwide Mechanical | Plumbing | 1 | 07/08/2026 |
| RPM Electric | Electrical | 1 | 03/21/2026 |
| Skowronski Jeff | Electrical | 1 | 03/21/2026 |
| Kentauros Contracting | General Contractor | 1 | 07/10/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PSI Agency | 254 | 75 | 06/29/2026 |
| ALLEN+KILLCOYNE Architect | 2697 | 3 | 07/01/2025 |
| RP Engineering | 7930 | 1 | 03/07/2024 |
| Piro Studio | 7503 | 1 | 01/05/2023 |
| Future Tech Consultants O | 589 | 8 | 12/15/2020 |
| LL Engineering | 1618 | 2 | 08/27/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Kentauros Contracting | 07/09/2026 |
| DOB NOW | General Construction | Permit Issued | Starr Tent & Event Group | 06/30/2026 |
| DOB NOW | Plumbing | Permit Issued | J. Caiazzo Plumbing & Heating | 06/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Colonial Crafters | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | Colonial Crafters | 06/23/2026 |
| DOB NOW | General Construction | Signed-off | Winick Productions | 04/10/2026 |
| DOB NOW | General Construction | Permit Issued | Chelsea Piers, LP Etal | 03/11/2026 |
| DOB NOW | Structural | Permit Issued | Chelsea Piers, LP Etal | 03/11/2026 |
| DOB NOW | Standpipe | Signed-off | Ami and Associates | 12/10/2025 |
| DOB NOW | Sprinklers | Signed-off | Ami and Associates | 12/10/2025 |
| DOB NOW | Plumbing | Signed-off | Accurate Mechanical Indstrs | 11/28/2025 |
| DOB NOW | Plumbing | Permit Issued | J. Caiazzo Plumbing & Heating | 11/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Colonial Crafters | 11/21/2025 |
| DOB NOW | Structural | Permit Issued | Chelsea Piers, LP Etal | 10/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Air Force Mechanical | 10/23/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Vertical Access | 10/23/2025 |
| DOB NOW | General Construction | Permit Issued | Colonial Crafters | 10/21/2025 |
| DOB NOW | Sign | Signed-off | Active Signs | 10/20/2025 |
| DOB NOW | Structural | Signed-off | Colonial Crafters | 10/02/2025 |
| DOB NOW | General Construction | Signed-off | Colonial Crafters | 09/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Colonial Crafters | 08/20/2025 |
| DOB NOW | General Construction | Signed-off | Colonial Crafters | 08/20/2025 |
| DOB NOW | Structural | Permit Issued | Colonial Crafters | 08/13/2025 |
| DOB NOW | General Construction | Permit Issued | Colonial Crafters | 08/05/2025 |
| DOB NOW | Sprinklers | Signed-off | Safety Fire Sprinkler | 02/03/2025 |
| DOB NOW | Standpipe | Signed-off | Safety Fire Sprinkler | 02/03/2025 |
| DOB NOW | Plumbing | Signed-off | Power Plumbing & Heating | 01/31/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Air Force Mechanical | 01/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Pristine Air Conditioning | 12/26/2024 |
| DOB NOW | Structural | Signed-off | HC Design Group | 12/19/2024 |
| DOB NOW | General Construction | Signed-off | HC Design Group | 12/19/2024 |
| DOB NOW | Plumbing | Signed-off | Attention to Detail P&H.I | 12/02/2024 |
| DOB NOW | Plumbing | Signed-off | Donato Plumbing | 11/19/2024 |
| DOB NOW | Plumbing | Signed-off | Anthony Disabato | 11/14/2024 |
| DOB NOW | Standpipe | Signed-off | Accurate Mechanical | 11/13/2024 |
| DOB NOW | Sprinklers | Signed-off | Accurate Mechanical | 11/12/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | Spring Scaffolding | 11/08/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Colonial Crafters | 11/06/2024 |
| DOB NOW | Plumbing | Signed-off | Attention to Detail P&H.I | 10/25/2024 |
| DOB NOW | Standpipe | Signed-off | Accurate Mechanical | 10/08/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 11/19/2025 | Signed-off | Colonial Crafters | Heating and Air Conditioning Systems | |
| 10/10/2025 | Permit Issued | Air Force Mechanical | Heating and Air Conditioning Systems | Heat / Cool Ei Solution FLEX-080-PB-ERV 484,000 BTU · Erv ×2 Aaon RNA-060-D-3-GJBOB-CB2L0 517,500 BTU · Rooftop Unit ×1 |
| 08/27/2019 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Signed-off | Ami and Associates | 453 heads, 8 outlets |
| 04/15/2020 | Signed-off | J. Caiazzo Plumbing & Heating | 6 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/15/2026 | Permit Issued | J. Caiazzo Plumbing & Heating | Water/Sanitary |
| 06/04/2026 | — | — | — |
| 10/10/2025 | Permit Issued | J. Caiazzo Plumbing & Heating | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | Five Borough Electric | General Wiring |
| 10/30/2025 | Permit Issued | Tritech Electl & Data | — |
| 10/20/2025 | Complete | Rainbow Electric Co | — |
| 05/19/2025 | Complete | Thanasi Electrical | General Wiring |
| 01/27/2025 | Complete | Power Electrical Conts | General Wiring |
| 11/11/2024 | Complete | Top Shelf Electric | — |
| 09/13/2024 | Complete | Joseph Weinstein Electric | General Wiring |
| 06/14/2024 | Complete | Empire State Electric Maintenance | General Wiring |
| 04/18/2024 | Complete | Top Shelf Electric | — |
| 12/12/2023 | Complete | Thanasi Electrical | 1 meters |
| 04/18/2023 | Permit Issued | Thanasi Electrical | General Wiring |
| 10/05/2022 | Permit Issued | Safetech Electrical Contng | General Wiring |
| 09/10/2021 | Permit Issued | Rainbow Electric Co | — |
| 02/03/2020 | Complete | Beacon Electric | General Wiring |
| 09/09/2019 | Complete | Live Wire Electric 1 | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2025 | Signed-off | Colonial Crafters | Steel, Concrete, Masonry |
| 08/06/2025 | Permit Issued | Colonial Crafters | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/14/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 06/30/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/07/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/24/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/22/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/25/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/20/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 02/20/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/31/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/28/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/28/2026 | Final | Daniel Allen | progress |
| 08/28/2026 | Fire-Resistance Rated Construction | Daniel Allen | progress |
| 06/16/2026 | Final | DANNY TRUJILLO | progress |
| 06/05/2026 | Standpipe Systems | MAURICIO ANDRADE | special |
| 06/05/2026 | Sprinkler Systems | MAURICIO ANDRADE | special |
| 06/05/2026 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 06/05/2026 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 05/20/2026 | Standpipe Systems | MAURICIO ANDRADE | special |
| 05/14/2026 | Sprinkler Systems | MAURICIO ANDRADE | special |
| 05/14/2026 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 05/14/2026 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 03/20/2026 | Final | ANDY ENGLER ROTH | progress |
| 01/27/2026 | Final | Daniel Allen | progress |
| 01/27/2026 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 01/27/2026 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 01/27/2026 | Fire-Resistance Rated Construction | MAURICIO ANDRADE | progress |
| 01/23/2026 | Final | Daniel Allen | progress |
| 01/23/2026 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 01/23/2026 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 01/23/2026 | Fire-Resistance Rated Construction | MAURICIO ANDRADE | progress |
| 12/15/2025 | Final | Daniel Allen | progress |
| 12/15/2025 | Fire-Resistance Rated Construction | Daniel Allen | progress |
| 12/15/2025 | Fire-Resistant Penetrations and Joints | Daniel Allen | special |
| 11/07/2025 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 11/07/2025 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Pier Sixty | Events & gatherings | Floor 1, Mezzanine | Project M01420426 Project M01081787 |
| Chelsea Piers | Fitness / Recreation | Floors 1, 2, Mezzanine, Roof | Project M01397731 Project M01397739 Project M01397743 Project M01296353 Project M01296864 Project M01296871 Project M01282124 Project M01285116 Project M01112865 Project M00992921 Project M00969058 Project M00991524 |
| Pier59studios | Arts / Culture / Entertainment | Floor 2 | Project M01371893 Project M08015447 Project M00761303 |
| CPNY Pier 61 | Fitness / Recreation | Floor 1 | Project M01334254 Project M01334280 |
| CPNY Swim Center | Fitness / Recreation | Floor 1, Mezzanine | Project M01315051 Project M01315041 Project M01315066 |
| Arte Museum | Arts / Culture / Entertainment | Floor 1, Mezzanine | Project M01124804 Project M01124811 Project M01124820 Project M01140324 Project M01141254 Project M01117151 |
| Classic Harbor Line | Other | Ground | Project M01125542 |
| District Korea | Arts / Culture / Entertainment | Floors 1, 2, Mezzanine | Project M01071038 |
| Netflix | Office | Floor 2 | Project M01034860 |
| Bowlero | Fitness / Recreation | Roof | Project M00983320 |
| Sports Performance Center | Fitness / Recreation | Floor 1 | Project M00991531 |
| Haite | Other | Floor 1 | Project M01000712 |
| CPNY | Fitness / Recreation | Floor 2 | Project M00326983 |
| CPNY Sky Rink Terrace | Fitness / Recreation | Floor 2 | Project M00326990 |
| Sky Rink Terrace | Restaurant / Food Service | Floor 2 | Project M00326992 |
| Bowlmor Chelsea Piers | Fitness / Recreation | Floor 1, Mezzanine | Project M00210830 Project M00216031 Project M00216064 |