← Back
Factory, industrial, semi-fireproof
112-02 15 AVENUE
QUEENS · College Point · BIN 4098135
💬 Discuss this project
1972Year Built
1Stories
F4Building Class
M2-1Zoning
168,571 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Factory, industrial, semi-fireproof · Owner of record: PEPSI COLA BOTTLING COMPANY OF NEW YORK · 651,937 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PEPSI COLA BOTTLING CO. OF NY1907/08/2026
PK MECHANICAL SERVICES607/08/2026
PEPSI BOTTLING COMPANY1707/08/2026
PEPSI COLA BOTTLING COMPANY OF NEW YORK103/22/2026
NYCP5903/21/2026
PEPSI BOTTLING CO. OF NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNOVA EXPEDITING SERVICES INC1203/21/2026
SAM HOLIDAY EXPERDITORS503/21/2026
BERZAK ASSOCIATES ARCHITECTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUNIOR CARTER MECH. CORPPlumbing407/08/2026
BONSIGNORE CONSTRUCTION IGeneral Contractor303/21/2026
DANIEL DRAGOMIRElectrical103/21/2026
JUNIOR CARTER MECHGeneral Contractor103/21/2026
WESTCO F.G. CORPORATIONGeneral Contractor107/08/2026
CARTER JUNORGeneral Contractor103/21/2026
CARO GROUP LTDGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BHK ENGINEERING, D.P.C.9589109/25/2024
KALLASSY ENGINEERING PLLC5711109/25/2024
RUDOLPH DUPUY R.A. ARCHIT3936108/24/2022
HARDIE & ASSOCIATES, CONS3760508/13/2021
Building Lifecycle
All (91)Filed (12)Permit Issued (7)Signed Off (5)Violation (31)Inspection (2)Objection (4)Special Inspection (30)
01/26/2026
Permit issued — General Construction
Q01066948-S2-GC-CX
10/06/2025
Signed off — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-I1
10/06/2025
Signed off — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-S3
10/03/2025
Filed — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-P2
10/03/2025
Special inspection requirement — Final
Michael Berzak
09/25/2025
Special inspection requirement — Final
Michael Berzak
02/26/2025
Permit issued — General Construction
Q01066948-S3-GC
11/21/2024
Filed — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-P1
11/18/2024
Filed — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-S3
11/14/2024
Special inspection requirement — Final
Michael Berzak
11/14/2024
Special inspection requirement — Final
Michael Berzak
11/13/2024
Permit issued — General Construction
Q01066948-I1-GC
09/25/2024
Filed — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-S2
09/13/2024
Special inspection requirement — Post-installed Anchors
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Subgrade Inspections
Joseph El-kallassy
09/13/2024
Special inspection requirement — Final
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Footing and Foundation
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Structural Steel - Details
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
Joseph El-kallassy
09/13/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DEGRAAFF
09/13/2024
Special inspection requirement — Structural Cold-Formed Steel
WILLIAM DEGRAAFF
09/10/2024
Filed — Alteration
Q01066984-I1
09/04/2024
Filed — Alteration
Relocate existing overhead door & components to new opening; Infill existing opening; New concrete slab for new tank. No change to use, egress or occupancy.
Q01066948-I1
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2022
Signed off — Alteration
Replacement of approximately 370LF of gas pipe from existing gas meter room to direct contact shrimk wrap heater located at production area as per plans. No change to existing occupancy use or egress.
Q00795755-I1
11/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/12/2022
Permit issued — Plumbing
Q00795755-I1-PL
08/31/2022
Objection raised — Energy
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection raised — Other
08/31/2022
Objection resolved — Addressed
08/24/2022
Filed — Alteration
Replacement of approximately 370LF of gas pipe from existing gas meter room to direct contact shrimk wrap heater located at production area as per plans. No change to existing occupancy use or egress.
Q00795755-I1
08/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUDOLPH DUPUY
06/14/2022
Signed off — Alteration
Replacement of three existing Superior Boiler with three new ones, Miura model LXL-200SG-12 serial numbers CA01500475, CA01500476, CA01500477. No change to existing occupancy use or egress.
Q00432828-I1
03/03/2022
Signed off — Alteration
Gas piping for 3 boiler replacements at first floor of existing boiler room of commercial building. Boiler replacement filed under job numberQ00432828I1. No change to existing occupancy use or egress.
Q00435426-I1
08/17/2021
Special inspection requirement — Shutoff dampers
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — Maintenance information
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — HVAC and service water heating equipment
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — Electrical motors
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — Heating Systems
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — HVAC and service water heating system controls
ELLIOTT HARDIE
08/17/2021
Special inspection requirement — Lowest Floor Elevation
ELLIOTT HARDIE
08/13/2021
Filed — Alteration
Replacement of three existing Superior Boiler with three new ones, Miura model LXL-200SG-12 serial numbers CA01500475, CA01500476, CA01500477. No change to existing occupancy use or egress.
Q00432828-P2
08/03/2021
Special inspection requirement — HVAC and service water heating equipment
ELLIOTT HARDIE
08/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
08/03/2021
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
ELLIOTT HARDIE
08/03/2021
Special inspection requirement — Heating Systems
ELLIOTT HARDIE
08/03/2021
Special inspection requirement — Lowest Floor Elevation
ELLIOTT HARDIE
05/10/2021
Filed — Alteration
Gas piping for 3 boiler replacements at first floor of existing boiler room of commercial building. Boiler replacement filed under job numberQ00432828I1. No change to existing occupancy use or egress.
Q00435426-P1
05/10/2021
Filed — Alteration
Replacement of three existing Superior Boiler with three new ones, Miura model LXL-200SG-12 serial numbers CA01500475, CA01500476, CA01500477. No change to existing occupancy use or egress.
Q00432828-P1
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2021
Permit issued — Plumbing
Q00435426-I1-PL
01/29/2021
Permit issued — Plumbing
Q00435426-I1-PL
01/29/2021
Permit issued — Boiler Equipment
Q00432828-I1-BE
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCARO GROUP01/26/2026
DOB NOWGeneral ConstructionSigned-offWESTCO F.G. CORPORATION02/26/2025
DOB NOWGeneral ConstructionSigned-offBONSIGNORE CONSTRUCTION I11/13/2024
DOB NOWPlumbingSigned-offJUNIOR CARTER MECH. CORP09/12/2022
DOB NOWPlumbingSigned-offJUNIOR CARTER MECH. CORP03/15/2021
DOB NOWPlumbingSigned-offJUNIOR CARTER MECH. CORP01/29/2021
DOB NOWBoiler EquipmentSigned-offJUNIOR CARTER MECH. CORP01/29/2021
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/08/2021
BISOTISSUEDDYNAIRE LLC11/28/2020
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/06/2020
BISFSISSUEDOLYMPIAN FUEL OIL CORP04/24/2019
BISOTISSUEDNEW VISION BUILDERS04/17/2019
BISSPISSUEDCAPITOL FIRE SPRINKLER CO04/10/2019
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/08/2019
BISOTISSUEDDYNAIRE LLC02/19/2019
BISPLISSUEDK.G. MECHANICAL INC02/19/2019
BISSPISSUEDCAPITOL FIRE SPRINKLER CO07/24/2018
BISSPISSUEDCAPITOL FIRE SPRINKLER CO04/11/2018
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/08/2018
BISSPISSUEDCAPITOL FIRE SPRINKLER CO07/24/2017
BISSPISSUEDCAPITOL FIRE SPRINKLER CO04/11/2017
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/07/2017
BISMHISSUEDNEW VISION BUILDERS INC08/18/2016
BISSPISSUEDCAPITOL FIRE SPRINKLER CO07/15/2016
BISMHISSUEDKESSEL PAVING AND CONCRET04/26/2016
BISPLISSUEDA PLUS PLUMBING CORP04/21/2016
BISOTISSUEDNEW VISION BUILDERS INC04/20/2016
BISOTISSUEDNEW VISION BUILDERS INC04/20/2016
BISMHISSUEDNEW VISION BUILDERS INC04/20/2016
BISOTISSUEDNEW VISION BUILDERS INC04/20/2016
BISOTISSUEDNEW VISION BUILDERS INC04/20/2016
BISSPISSUEDCAPITOL FIRE SPRINKLER CO04/13/2016
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/07/2016
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR10/08/2015
BISMHISSUEDJ CAIAZZO PLUMBING & HEAT10/08/2015
BISMHISSUEDNORTHEAST SERVICES INC06/19/2015
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/06/2015
BISOTISSUEDB & B IRON WORKS CORP05/22/2014
BISPLISSUEDSHAW MECHANICAL INC04/09/2014
BISSPISSUEDCAPITOL FIRE SPKL CO,INC03/07/2014
+ 17 more permits on file
4 projects · most recent 03/06/2021
General Wiring
FiledStatusContractorScope
03/06/2021Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
03/03/2021CompleteEXCALIBUR ELECTRIC INC—
02/08/2021Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
02/06/2019CompleteEXCALIBUR ELECTRIC INC—
1 project · most recent 10/03/2025
Steel Concrete
FiledStatusContractorScope
10/03/2025Signed-offCARO GROUP LTDSteel, Concrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
10/03/2025FinalMichael Berzakprogress
09/25/2025FinalMichael Berzakprogress
11/14/2024FinalMichael Berzakprogress
11/14/2024FinalMichael Berzakprogress
09/13/2024Post-installed AnchorsWILLIAM DEGRAAFFspecial
09/13/2024Structural Steel - High Strength BoltingWILLIAM DEGRAAFFspecial
09/13/2024Structural Steel - WeldingWILLIAM DEGRAAFFspecial
09/13/2024Subgrade InspectionsJoseph El-kallassyspecial
09/13/2024FinalWILLIAM DEGRAAFFprogress
09/13/2024Footing and FoundationWILLIAM DEGRAAFFprogress
09/13/2024Structural Steel - DetailsWILLIAM DEGRAAFFspecial
09/13/2024Helical Piles Foundation (BB # 2014-020)Joseph El-kallassyspecial
09/13/2024Concrete - Cast-In-PlaceWILLIAM DEGRAAFFspecial
09/13/2024Structural Stability – Alterations of existing buildingsWILLIAM DEGRAAFFspecial
09/13/2024Structural Cold-Formed SteelWILLIAM DEGRAAFFspecial
08/18/2022Fire-Resistant Penetrations and JointsRUDOLPH DUPUYspecial
08/17/2021Shutoff dampersELLIOTT HARDIEenergy_progress
08/17/2021Maintenance informationELLIOTT HARDIEenergy_progress
08/17/2021HVAC and service water heating equipment ELLIOTT HARDIEenergy_progress
08/17/2021Electrical motorsELLIOTT HARDIEenergy_progress
08/17/2021Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)ELLIOTT HARDIEspecial
08/17/2021Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
08/17/2021Heating SystemsELLIOTT HARDIEspecial
08/17/2021HVAC and service water heating system controls ELLIOTT HARDIEenergy_progress
08/17/2021Lowest Floor ElevationELLIOTT HARDIEprogress
Latest 25 of 47.
▾Documents — 438 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
08/21/2026Q01066984-I1Request digital key ↗
08/21/2026Q01066948-P2Request digital key ↗
08/21/2026Q01066948-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/27/2026Q00432828-I1Request digital key ↗
08/27/2026Q00432828-P2Request digital key ↗
08/15/2026Q00432828-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00435426-I1Request digital key ↗
08/15/2026Q00435426-P1Request digital key ↗
▸Applications & Permits71
▸BISPLAN / WORK APPROVAL APPLICATION43
11/12/2020401087239Open ↗
11/12/2020402400923Open ↗
10/10/2019440535690Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION28
11/28/2020421738285Open ↗
05/06/2019421601608Open ↗
05/02/2019421601608Open ↗
Showing 3 of 28 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE DESIGN CERTIFICATION2
11/16/2020421738285Open ↗
02/14/2019440535690Open ↗
▸Seals & Professional Certifications145
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
10/16/2019421601608Open ↗
05/10/2019421302101Open ↗
05/02/2019421302101Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/02/2026Q00435426-P1Open ↗
09/01/2026Q01066948-S2Open ↗
09/01/2026Q01066948-S2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026Q00435426-P1Open ↗
09/01/2026Q01066948-S2Open ↗
09/01/2026Q01066948-S2Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
04/19/2019421738285Open ↗
04/18/2019421601608Open ↗
08/30/2016421090704Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
04/19/2019421738285Open ↗
04/18/2019421601608Open ↗
02/14/2019440535690Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00432828-I1Open ↗
08/27/2026Q00432828-P1Open ↗
08/27/2026Q00432828-P2Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)2
03/24/2016421302101Open ↗
03/24/2016421302101Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/14/2019440535690Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/14/2019440535690Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
10/10/2019440535690Open ↗
09/18/2017421271091Open ↗
09/08/2017421271091Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING3
02/14/2019440535690Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
07/18/2020421389349Open ↗
▸BISGAS CUT-OFF1
11/22/2016421302101Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/02/2019421601608Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST7
08/29/2016421090704Open ↗
03/24/2016421302101Open ↗
Showing 2 of 7 on file for this type
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026Q00432828-I1Open ↗
08/27/2026Q00432828-P1Open ↗
08/27/2026Q00432828-P2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
04/19/2019421738285Open ↗
02/14/2019440535690Open ↗
10/24/2016421389349Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
11/06/2019421266640Open ↗
10/16/2019421601608Open ↗
05/02/2019421302101Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/07/2019421266640Open ↗
10/16/2019421601608Open ↗
05/03/2019421302101Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/14/2019440535690Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/14/2019440535690Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00432828-I1Open ↗
▸Inspections & Test Reports7
▸BISHYDRAULIC FLOW CALCULATIONS3
03/04/2016421271091Open ↗
03/04/2016421271091Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/21/2021440535690Open ↗
11/28/2020421738285Open ↗
02/14/2019440535690Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/21/2021440535690Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
08/14/2020421389349Open ↗
04/20/2020421389349Open ↗
01/27/2020421601608Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/19/2019421266640Open ↗
03/16/2016421266640Open ↗
Showing 2 of 3 on file for this type
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT37
08/14/2020421389349Open ↗
04/20/2020421389349Open ↗
01/13/2020421601608Open ↗
Showing 3 of 37 on file for this type
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET21
04/18/2019421738285Open ↗
04/18/2019421601608Open ↗
10/24/2016421389349Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION8
12/05/2019440535690Open ↗
09/13/2018421271091Open ↗
09/18/2017421271091Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM2
11/01/2017421389349Open ↗
09/08/2017421271091Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/14/2019440535690Open ↗
▸Other Documents1
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
02/14/2019440535690Open ↗