← Back
Primarily 1 family with 1 store or office
112-02 71 ROAD
QUEENS · Forest Hills · BIN 4052698
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R3-2Zoning
3,327 sfGross Floor Area
2Units
0 Open Violations
Primarily 1 family with 1 store or office · 7,300 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC110/13/2022
DAVID LEE - ARCHITECT106/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAPITOL FIRE SPRINKLER203/21/2026
A D BUILDING SOLUTIONS IN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600106/17/2022
Building Lifecycle
All (20)Filed (2)Permit Issued (2)Signed Off (2)Violation (7)Inspection (5)Special Inspection (2)
04/25/2023
Signed off — Alteration
Installation of Sprinkler piping and heads on Cellar & First Floor. No change in use, occupancy or egress.
Q00740181-I1
03/03/2023
Signed off — Alteration
installation of plumbing fixtures as per plan.
Q08019977-I1
01/17/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2022
Permit issued — Plumbing
Q08019977-I1-PL
10/13/2022
Filed — Alteration
installation of plumbing fixtures as per plan.
Q08019977-I1
06/21/2022
Permit issued — Sprinklers
Q00740181-I1-EW-SP
06/17/2022
Filed — Alteration
Installation of Sprinkler piping and heads on Cellar & First Floor. No change in use, occupancy or egress.
Q00740181-I1
06/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
05/17/2022
Special inspection requirement — Sprinkler Systems
Hackjong Choi
08/07/2019
Violation issued (ECB, closed)
Construction
08/07/2019
Violation issued (ECB, closed)
Construction
07/09/2019
Violation issued (ECB, closed)
Zoning
04/19/2017
Violation issued (ECB, closed)
Construction
07/23/1998
Violation issued (ECB, closed)
Construction
07/23/1998
Violation issued (ECB, closed)
Construction
06/17/1994
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/25/2022
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO06/21/2022
BIS—ISSUEDKHAIKA CONSTRUCTION INC08/24/2021
BISMHISSUEDJM CONTRACTORS (NY) INC01/25/2017
BISEQISSUEDWING SING INCORPORATION04/29/2016
BIS—ISSUEDWING SING INCORPORATION04/29/2016
BISOTISSUEDWING SING INCORPORATION04/29/2016
BISPLISSUEDQMB PLUMBING & HEATING INC12/29/2015
BISPLISSUEDQMB PLUMBING & HEATING INC12/29/2015
BIS—ISSUEDWING SING INCORPORATION11/16/2015
BIS—ISSUEDWING SING INCORPORATION11/16/2015
BISEQISSUEDWING SING INCORPORATION11/12/2015
BISOTISSUEDWING SING INCORPORATION11/12/2015
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/10/2022Fire-Resistant Penetrations and JointsHackjong Choispecial
05/17/2022Sprinkler SystemsHackjong Choispecial
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00740181-I1Request digital key ↗
08/25/2026Q08019977-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION17
09/22/2023421779800Open ↗
03/03/2023421779800Open ↗
08/09/2022421779800Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION6
08/24/2021421779800Open ↗
01/26/2017421188262Open ↗
12/30/2015421204967Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
01/30/2017421188262Open ↗
12/01/2016421188262Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
02/09/2023421779800Open ↗
08/16/2016421204967Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/13/2021421779800Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/13/2021421779800Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
04/27/2023421779800Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/27/2023421779800Open ↗
▸BISZONING DIAGRAM1
10/30/2015421204967Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/30/2019421779800Open ↗
01/04/2017421204967Open ↗
12/23/2016421188262Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q08019977-I1Open ↗
08/13/2026Q00740181-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q00740181-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
08/16/2016421204967Open ↗
06/29/2016421204967Open ↗
05/11/2016421204967Open ↗
Showing 3 of 6 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
01/11/2017421188262Open ↗
12/01/2016421188262Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
12/30/2019421779800Open ↗
03/04/2016421204967Open ↗
10/20/2015421204967Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/17/2021421779800Open ↗
11/12/2015421204967Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/02/2020421779800Open ↗
07/21/2015421188262Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026Q08019977-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
12/30/2019421779800Open ↗
01/04/2017421204967Open ↗
12/23/2016421188262Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/04/2017421204967Open ↗
12/23/2016421188262Open ↗
12/01/2016421188262Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/02/2023421779800Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/02/2023421779800Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/20/2015421204967Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSCHEDULE A - OCCUPANCY / USE10
09/22/2023421779800Open ↗
11/25/2020421779800Open ↗
11/09/2020421779800Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/02/2017421204967Open ↗
01/30/2017421188262Open ↗
12/01/2016421188262Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/21/2015421188262Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
10/20/2023421779800Open ↗
11/19/2020421779800Open ↗
12/30/2019421779800Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/20/2023421779800Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
11/23/2016421204967Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION9
03/21/2023421779800Open ↗
11/25/2020421779800Open ↗
09/26/2016421204967Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
12/30/2019421779800Open ↗
08/25/2015421204967Open ↗
07/20/2015421188262Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/19/2021421779800Open ↗
11/25/2020421779800Open ↗
11/25/2020421779800Open ↗
▸BISPLOT DIAGRAM2
12/30/2019421779800Open ↗
11/23/2016421204967Open ↗