← Back
One family attached or semi-detached
112-02 FRANCIS LEWIS BLVD
QUEENS · St. Albans · BIN 4235436
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R4BZoning
1,224 sfGross Floor Area
1Units
One family attached or semi-detached · 1,900 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR101/17/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524101/17/2024
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Objection (4)Special Inspection (5)
04/05/2024
Permit issued — Solar
Q00982872-I1-SL
02/02/2024
Objection resolved — Addressed
02/02/2024
Objection resolved — Addressed
01/25/2024
Objection raised — Other
01/25/2024
Objection raised — Zoning
01/17/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 6 Panels, 2.4 kW
Q00982872-I1
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
12/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/27/2023
Special inspection requirement — Final
Mina Makar
12/27/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR04/05/2024
1 project · most recent 01/09/2024
FiledStatusContractorScope
01/09/2024CompleteISLAND ELECTRIC CORP—
1 project · most recent 01/17/2024
FiledStatusContractorScope
01/17/2024Permit IssuedMOMENTUM SOLAR6 panels, 2.4 kw, 106 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/27/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
12/27/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
12/27/2023Energy Code Compliance InspectionsMina Makarprogress
12/27/2023FinalMina Makarprogress
12/27/2023Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00982872-I1Request digital key ↗
08/23/2026Q00982872-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00982872-I1Open ↗
08/23/2026Q00982872-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q00982872-I1Open ↗
08/25/2026Q00982872-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00982872-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00982872-I1Open ↗
08/23/2026Q00982872-P1Open ↗