ECB02/25/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESS$630 due
DOB02/16/2023REQUEST ADDITIONAL INFORMATION-RESPONDENT IS REQUESTED TO PROVIDE A S/S LETTER ALONG W/DETAILED CALCS,DWGS,FOUNDATION DETAILS,SOIL TYPES, ETC IN ACCORDANCE W/1RCNY 103-09 IDENTIFYING THE FACTURAL BASIS(INCL DATES PE PERSONALLY VISITED THE SITE)OF THE ENG'R ASSESSMENT REPORT REGARDING THE STRUCT STABILITY OF THE R/W
DOB10/01/2019FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
Two stories - detached, small or mid-size · 6,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.