← Back
Two stories - detached, small or mid-size
112-08 PARK LANE SOUTH
QUEENS · Richmond Hill · BIN 4192291
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2Zoning
1,890 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,500 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 23p · 1 filing · 8 docs
Floor 13p · 1 filing · 8 docs
Cellar3p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/25/2022$1.1M—— → —$598/sf building
03/05/2020$500K—— → —$265/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P GEORGOPOULOS ARCHITECT PC107/09/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADVANCED PLBG LLCPlumbing107/08/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
11/24/2020
Signed off — Alteration
plumbing work filed in conjunction with alteration application 440590665. Cellar WC, lavatory, wash, sink, gas dryer, gas boiler, gas HWH, and floor drain. First fl relocate sink, dishwasher, gas stove, WC and lavatory. Second fl relocate WC, tub, lav.
Q00336196-I1
07/09/2020
Filed — Alteration
plumbing work filed in conjunction with alteration application 440590665. Cellar WC, lavatory, wash, sink, gas dryer, gas boiler, gas HWH, and floor drain. First fl relocate sink, dishwasher, gas stove, WC and lavatory. Second fl relocate WC, tub, lav.
Q00336196-I1
07/09/2020
Permit issued — Plumbing
Q00336196-I1-PL
03/24/2020
Special inspection requirement — Energy Code Compliance Inspections
Vasilios Georgopoulos
03/24/2020
Special inspection requirement — HVAC and service water heating equipment
Vasilios Georgopoulos
03/24/2020
Special inspection requirement — HVAC insulation and sealing
Vasilios Georgopoulos
03/24/2020
Special inspection requirement — HVAC and service water heating system controls
Vasilios Georgopoulos
03/24/2020
Special inspection requirement — Maintenance information
Vasilios Georgopoulos
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADVANCED PLBG LLC07/09/2020
BISOTISSUEDANDRZEJ TYBOROWSKI03/25/2020
1 project · most recent 05/05/2020
General Wiring
FiledStatusContractorScope
05/05/2020CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/24/2020Energy Code Compliance InspectionsVasilios Georgopoulosprogress
03/24/2020HVAC and service water heating equipment Vasilios Georgopoulosenergy_progress
03/24/2020HVAC insulation and sealing Vasilios Georgopoulosenergy_progress
03/24/2020HVAC and service water heating system controls Vasilios Georgopoulosenergy_progress
03/24/2020Maintenance informationVasilios Georgopoulosenergy_progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00336196-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
06/07/2022440590665Open ↗
03/17/2022440590665Open ↗
03/09/2022440590665Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
03/25/2020440590665Open ↗
03/24/2020440590665Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026Q00336196-I1Open ↗
08/23/2026Q00336196-I1Open ↗
08/23/2026Q00336196-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/24/2020440590665Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/24/2020440590665Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/24/2020440590665Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00336196-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/24/2020440590665Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00336196-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/17/2022440590665Open ↗
03/24/2020440590665Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/24/2020440590665Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/17/2022440590665Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/17/2022440590665Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/17/2022440590665Open ↗
▸BISFENESTRATION AREAS1
03/17/2022440590665Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/17/2022440590665Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/17/2022440590665Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/17/2022440590665Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/17/2022440590665Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/17/2022440590665Open ↗
03/24/2020440590665Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
03/17/2022440590665Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/17/2022440590665Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/21/2022440590665Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/17/2022440590665Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/17/2022440590665Open ↗
▸BISMASONRY1
03/17/2022440590665Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/17/2022440590665Open ↗
▸BISSOIL REPORT1
03/24/2020440590665Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/18/2022440590665Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/21/2022440590665Open ↗
▸BISFINAL1
03/17/2022440590665Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/24/2020440590665Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/17/2022440590665Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/17/2022440590665Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/24/2020440590665Open ↗
▸Other Documents1
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/17/2022440590665Open ↗