← Back
Three families
112-10 111 AVENUE
QUEENS · BIN 4250180
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R4-1Zoning
2,168 sfGross Floor Area
3Units
9 Open Violations 5 unresolved · 4 paperwork only ▸FDNY Report ↗
Three families · Owner of record: ZAPA HOLDINGS LLC · 2,500 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZAPA HOLDINGS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC203/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA ENGINEERING P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KISHAN PLUMBING INCGeneral Contractor207/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
Building Lifecycle
All (17)Filed (2)Permit Issued (3)Signed Off (1)Violation (10)Special Inspection (1)
06/24/2026
Violation issued (ECB, open)
Construction
02/13/2025
Violation issued (HPD, open)
A
02/13/2025
Violation issued (HPD, open)
B
02/13/2025
Violation issued (HPD, open)
B
02/13/2025
Violation issued (HPD, open)
B
02/13/2025
Violation issued (HPD, open)
A
02/13/2025
Violation issued (HPD, closed)
C
11/25/2024
Signed off — Alteration
APPLICATION FILING REMOVE AND REPLACE EXISTING 2 WC, 1 LAV AND 1 TUB , 1 KITCHEN SINK AND 1 STOVE IN CONNECTION GC JOB#Q0101253-I1 AS PER PLAN AT 1ST FLOOR RESIDENTIAL UNIT. NO CHNAGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
Q01001253-I1
08/12/2024
Permit issued — General Construction
Q01001253-I1-GC
05/21/2024
Permit issued — General Construction
Q01001253-I1-GC
05/21/2024
Permit issued — Plumbing
Q01001253-S1-PL
03/29/2024
Filed — Alteration
APPLICATION FILING REMOVE AND REPLACE EXISTING 2 WC, 1 LAV AND 1 TUB , 1 KITCHEN SINK AND 1 STOVE IN CONNECTION GC JOB#Q0101253-I1 AS PER PLAN AT 1ST FLOOR RESIDENTIAL UNIT. NO CHNAGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
Q01001253-S1
02/29/2024
Filed — Alteration
APPLICATION FILING REMOVE AND REPLACE EXISTING 2 WC, 1 LAV AND 1 TUB , 1 KITCHEN SINK AND 1 STOVE IN CONNECTION GC JOB#Q0101253-I1 AS PER PLAN AT 1ST FLOOR RESIDENTIAL UNIT. NO CHNAGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
Q01001253-I1
02/05/2024
Special inspection requirement — Final
MOATEZ ALI
01/11/2007
Violation issued (ECB, open)
Unknown
08/28/2006
Violation issued (ECB, open)
Quality of Life
08/28/2006
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKISHAN PLUMBING INC08/12/2024
DOB NOWGeneral ConstructionSigned-offKISHAN PLUMBING INC05/21/2024
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC05/21/2024
1 project · most recent 03/29/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/29/2024Permit IssuedKISHAN PLUMBING INCGas, Water/Sanitary
2 projects · most recent 01/31/2024
General Wiring
FiledStatusContractorScope
01/31/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/24/2018Permit IssuedBDS ELECTRIC CORP.3 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/05/2024FinalMOATEZ ALIprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q01001253-S1Request digital key ↗
08/23/2026Q01001253-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q01001253-S1Open ↗
08/23/2026Q01001253-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01001253-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q01001253-S1Open ↗
08/23/2026Q01001253-I1Open ↗