RoofUnder Construction14p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents · 1 drawing sheet
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING BLDG ALTERATION, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
16 documents
Latest 3 of 7 filings on this floor.
Bulkhead2p · 1 filing · 4 docs
Architecture
No filed description on record for this project.
On file for this project
4 documents · 2 drawing sheets
Floor 15Under Construction10p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
No filed description on record for this project.
On file for this project
39 documents · 2 drawing sheets
Floor 14Under Construction8p · 1 filing · 3 docs
Fire Protection
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
Floor 13Under Construction8p · 1 filing · 3 docs
Fire Protection
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
Floor 12Under Construction8p · 1 filing · 3 docs
Fire Protection
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
Floor 11Under Construction8p · 1 filing · 3 docs
Fire Protection
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
Floor 10Under Construction9p · 2 filings · 20 docs
Fire ProtectionGeneral
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
No filed description on record for this project.
On file for this project
39 documents · 1 drawing sheet
Floor 9Under Construction11p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
No filed description on record for this project.
On file for this project
39 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 8Under Construction12p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INTERIOR NON-STRUCTURAL DEMOLITION AS PER PLANS.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 7Under Construction14p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 6Under Construction12p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 5Under Construction15p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents · 1 drawing sheet
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 4Under Construction14p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents · 1 drawing sheet
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction14p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents · 1 drawing sheet
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 2Under Construction15p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents · 1 drawing sheet
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 1Under Construction16p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE OF MECHANICAL DEMO EQUIPMENT AS PER PLANS.
On file for this project
2 documents · 1 drawing sheet
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents
INSTALLATION AND USE OF DEBRIS CHUTE DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M01304727-I1.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
CellarUnder Construction15p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Standpipe
FILING HEREWITH CONVERSION OF THE EXISTING WET SYSTEM TO A DRY TEMPORARY STANDPIPE SYSTEM FOR THE DURATION OF PHASE 1. PHASE 2: STANDPIPE TO BE EXTENDED/NEW INSTALLATION AFTER NEW BUILDING CORE HAS BEEN INSTALLED.
On file for this project
3 documents · 1 drawing sheet
FILING HEREWITH REMOVAL OF ALL EXISTING GAS PIPING AS PER PLANS.
On file for this project
4 documents · 1 drawing sheet
INTERIOR NON-STRUCTURAL DEMOLITION AS PER PLANS.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.