ECB01/23/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39062513M ISSUED ON 05/20/2022, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT$1K due
ECB01/23/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39062514Y ISSUED ON 05/20/2022, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT$1K due
DOB04/29/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
ECB05/20/2022#2 BOILER RELIEF VALVE NOT IN VERTICAL POSITION,DAMPERS TO SWING BOTH WAYS (GAS) & MISSING SPILL SWITCHES ,MISSING RATING PLATE EXPOSED WIRE BY LOW WATER CUT OFF,CORRECT VIOLATION & SEND IN CERTIFICATE OF CORRENothing owed — awaiting certificate of correction
ECB05/20/2022#1BOILER MISSING RATING PLATE,DAMPERS DO NOT SWING BOTH WAYS (GAS),MISSING SPILL SWITCHS,CORRECT VIOLATION & SEND IN CERTIFICATE OF CORRECTIONNothing owed — awaiting certificate of correction