← Back
Walk-up apt, over six families with stores
112-18 101 AVENUE
QUEENS · BIN 4539299
💬 Discuss this project
2007Year Built
3.5Stories
C7Building Class
R6BZoning
22,615 sfGross Floor Area
15Units
28 Open Violations 25 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 112 101 AVENUE LLC · 5,011 sf lot · 4.51 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 17 docs
Floor 1Under Construction10p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EARTH LINK GENERAL CONST. INC.607/08/2026
112 101 AVENUE LLC C/O HA203/22/2026
SUPREME BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP405/23/2025
MJE PROFESSIONAL SERVICES101/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERIOR FIRE CONTROL403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EARTH LINK GENERAL CONSTRGeneral Contractor407/08/2026
SIGNORE & SONS PLBG CORPPlumbing307/08/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500202/06/2023
BITOPI CONSULTANTS LLC7036101/23/2023
Building Lifecycle
All (34)Filed (5)Permit Issued (6)Signed Off (1)Violation (4)Inspection (8)Special Inspection (10)
09/15/2026
Inspection — Pass PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2026
Permit issued — Plumbing
Q00806207-S1-PL
09/19/2025
Violation issued (ECB, open)
Construction
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
05/27/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM HOQUE
05/23/2025
Filed — Alteration
INSTALL COMMERCIAL KITCHEN COOKING EQUIPMENTS AND GAS VALVE FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00806207-P2
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM HOQUE
05/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/26/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/03/2024
Permit issued — Plumbing
Q00806207-S1-PL
11/02/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00996170-I1
04/08/2024
Permit issued — Sidewalk Shed
Q00996170-I1-SH
03/11/2024
Violation issued (HPD, open)
C
02/08/2024
Violation issued (ECB, open)
Construction
02/01/2024
Permit issued — Sidewalk Shed
Q00996170-I1-SH
01/30/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00996170-I1
05/20/2023
Violation issued (ECB, open)
Construction
05/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/24/2023
Permit issued — Plumbing
Q00806207-S1-PL
02/06/2023
Filed — Alteration
INSTALL COMMERCIAL KITCHEN COOKING EQUIPMENTS AND GAS VALVE FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00806207-P1
01/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
01/25/2023
Special inspection requirement — Energy Code Compliance Inspections
AKM HOQUE
01/23/2023
Filed — Alteration
INSTALL COMMERCIAL KITCHEN COOKING EQUIPMENTS AND GAS VALVE FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00806207-S1
01/20/2023
Permit issued — Mechanical Systems
Q00806207-I1-MS
01/12/2023
Filed — Alteration
INSTALL COMMERCIAL KITCHEN COOKING EQUIPMENTS AND GAS VALVE FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00806207-I1
12/30/2022
Special inspection requirement — Duct leakage testing, insulation and design
AKM HOQUE
12/30/2022
Special inspection requirement — Mechanical Systems
Jay Kavi
12/30/2022
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
12/30/2022
Special inspection requirement — Final
BRIAN MCCAFFREY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP01/08/2026
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP12/03/2024
DOB NOWSidewalk ShedSigned-offEARTH LINK GENERAL CONSTR04/08/2024
DOB NOWSidewalk ShedSigned-offEARTH LINK GENERAL CONSTR02/01/2024
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP02/24/2023
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC01/20/2023
1 project · most recent 05/23/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/23/2025Permit IssuedSUPERIOR FIRE CONTROL INCVentilation Systems
Ventilation
Pen Vent USDI18DD 2,800 CFM · Kitchen Exhaust ×1
1 project · most recent 05/23/2025
Gas
FiledStatusContractorScope
05/23/2025Permit IssuedSIGNORE & SONS PLBG CORPGas
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/15/2026Pass PL - Up to 3 Requested FloorsPassView ↗
05/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/27/2025Tenant Protection Plan ComplianceKAMRUL AHSANspecial
05/27/2025Energy Code Compliance InspectionsAKM HOQUEprogress
05/14/2025Energy Code Compliance InspectionsAKM HOQUEprogress
05/14/2025Tenant Protection Plan Compliance—special
01/25/2023Tenant Protection Plan ComplianceJay Kavispecial
01/25/2023Energy Code Compliance InspectionsAKM HOQUEprogress
12/30/2022Duct leakage testing, insulation and designAKM HOQUEenergy_progress
12/30/2022Mechanical SystemsJay Kavispecial
12/30/2022Tenant Protection Plan ComplianceJay Kavispecial
12/30/2022FinalBRIAN MCCAFFREYprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00996170-I1Request digital key ↗
08/20/2026Q00806207-S1Request digital key ↗
08/20/2026Q00806207-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026Q00996170-I1Open ↗
08/20/2026Q00806207-S1Open ↗
08/20/2026Q00806207-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/24/2026Q00806207-S1Open ↗
09/02/2026Q00806207-I1Open ↗
09/02/2026Q00806207-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/24/2026Q00806207-S1Open ↗
09/02/2026Q00806207-I1Open ↗
09/02/2026Q00806207-I1Open ↗
Showing 3 of 4 on file for this type