← Back
Elevator cooperative
112-20 112 STREET
QUEENS · BIN 4432149
💬 Discuss this project
1956Year Built
6Stories
D4Building Class
R6Zoning
238,128 sfGross Floor Area
220Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: BALFOUR OWNERS CORP · 113,664 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BALFOUR OWNERS4503/22/2026
BALFOUR OWNERS COR103/22/2026
D H NEPTUN CONSTRUCTION103/22/2026
AKAM ASSOCIATES403/21/2026
BALFOUR OWNER CORP C O JOHN B203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
SAM HOLIDAY EXPERDITORS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISHCO INCGeneral Contractor407/08/2026
D & H NEPTUN CONSTRUCTIONGeneral Contractor303/21/2026
HOMEPRO GENERAL CONTRACTINGGeneral Contractor303/21/2026
D&A HOME IMPROVEMENT NYCGeneral Contractor206/27/2026
JODOM MECHANICAL, INCPlumbing207/08/2026
SEGNA, MARIOElectrical103/21/2026
TOROSSIAN, FRANKElectrical103/21/2026
POFI CONSTRUCTION CORPGeneral Contractor107/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor107/08/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
GUIGLIANO, MICHAELElectrical103/21/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
RUBIN GLICKElectrical103/21/2026
RZYMSKI, MACIEJElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCT. ENGINEERING INTEG4174205/25/2023
JOSEPH FARAHNIK CONSULTIN3544110/27/2021
Building Lifecycle
All (137)Filed (12)Permit Issued (11)Signed Off (6)Facade (FISP) (12)Violation (60)Inspection (8)Objection (22)Special Inspection (6)
06/25/2026
Signed off — Alteration
Q01304470-I1
05/06/2026
Violation issued (HPD, open)
A
03/16/2026
Permit issued — General Construction
Q01304470-I1-GC
02/03/2026
Permit issued — General Construction
Q01304470-I1-GC
11/21/2025
Violation issued (HPD, closed)
I
10/17/2025
Filed — Alteration
Q01304470-I1
10/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2025
Signed off — Alteration
Plumbing installation/upgrade in the laundry room. Replacement of existing washers and dryers. Modification of existing sprinkler heads.
Q00743260-I1
01/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2024
Signed off — Alteration
Modification of existing laundry room dryer vents
Q00615492-I1
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2024
Filed — Alteration
Plumbing installation/upgrade in the laundry room. Replacement of existing washers and dryers. Modification of existing sprinkler heads.
Q00743260-P2
10/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Filed — Alteration
Plumbing installation/upgrade in the laundry room. Replacement of existing washers and dryers. Modification of existing sprinkler heads.
Q00743260-P1
09/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/17/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/26/2024
Permit issued — Plumbing
Q00743260-I1-PL
03/03/2024
Cycle 9 facade report submitted
03/03/2024
Cycle 9 facade report signed — SAFE
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2024
Cycle 9 facade inspection completed
02/16/2024
Signed off — Alteration
Minor renovation of the existing apartment - refreshing, painting, beautification. Replacement of existing flooring. Under seperate PL application: replacement of some existing plumbing fixtures w/ new ones.
Q00880361-I1
12/14/2023
Permit issued — Mechanical Systems
Q00615492-I1-MS
08/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2023
Permit issued — Plumbing
Q00880361-S1-PL
06/05/2023
Permit issued — General Construction
Q00880361-I1-GC
05/25/2023
Filed — Alteration
Minor renovation of the existing apartment - refreshing, painting, beautification. Replacement of existing flooring. Under seperate PL application: replacement of some existing plumbing fixtures w/ new ones.
Q00880361-I1
05/25/2023
Filed — Alteration
Minor renovation of the existing apartment - refreshing, painting, beautification. Replacement of existing flooring. Under seperate PL application: replacement of some existing plumbing fixtures w/ new ones.
Q00880361-S1
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chris Yiu
05/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Wieslawa Jasiulewicz Majran
05/25/2023
Special inspection requirement — Lighting in dwelling units
Wieslawa Jasiulewicz Majran
05/24/2023
Special inspection requirement — Final
Wieslawa Jasiulewicz Majran
03/28/2023
Violation issued (HPD, closed)
A
03/17/2023
Permit issued — General Construction
Q00757303-I1-GC
11/25/2022
Permit issued — General Construction
Q00757303-I1-GC
11/23/2022
Permit issued — Plumbing
Q00743260-I1-PL
09/26/2022
Filed — Alteration
General construction renovation of building lobby entrance, reception areas and ramps all as shown on drawings filed herewith. no change in use egress or occupancy.
Q00757303-I1
09/07/2022
Signed off — Alteration
Remove non load bearing kitchen partition, and kitchen cabinets. provide new drop soffit, provide new kitchen floor finish, cabintes and painting. No change of use occupancy or egress.
Q00469873-I1
08/19/2022
Special inspection requirement — Final
Hugh Robotham
08/15/2022
Objection resolved — Addressed
08/15/2022
Objection resolved — Addressed
08/15/2022
Objection resolved — Addressed
08/15/2022
Objection resolved — Addressed
07/24/2022
Objection raised — Other
07/24/2022
Objection raised — Inspections
07/24/2022
Objection raised — Scope
07/24/2022
Objection raised — Other
07/19/2022
Filed — Alteration
Remove non load bearing kitchen partition, and kitchen cabinets. provide new drop soffit, provide new kitchen floor finish, cabintes and painting. No change of use occupancy or egress.
Q00469873-P1
05/31/2022
Filed — Alteration
Plumbing installation/upgrade in the laundry room. Replacement of existing washers and dryers. Modification of existing sprinkler heads.
Q00743260-I1
11/02/2021
Objection raised — Fire_Protection
11/02/2021
Objection resolved — Addressed
11/02/2021
Objection raised — Scope
11/02/2021
Objection resolved — Addressed
11/02/2021
Objection raised — Mechanical
11/02/2021
Objection resolved — Addressed
11/02/2021
Objection raised — Energy
11/02/2021
Objection resolved — Addressed
10/27/2021
Filed — Alteration
Modification of existing laundry room dryer vents
Q00615492-I1
07/13/2021
Permit issued — General Construction
Q00469873-I1-GC
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offD&A HOME IMPROVEMENT NYC03/16/2026
DOB NOWGeneral ConstructionSigned-offD&A HOME IMPROVEMENT NYC02/03/2026
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC04/26/2024
DOB NOWMechanical SystemsSigned-offPOFI CONSTRUCTION CORP12/14/2023
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO06/17/2023
DOB NOWGeneral ConstructionSigned-offD & H NEPTUN CONSTRUCTION06/05/2023
DOB NOWGeneral ConstructionSigned-offISHCO INC03/17/2023
DOB NOWGeneral ConstructionSigned-offISHCO INC11/25/2022
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC11/23/2022
DOB NOWGeneral ConstructionSigned-offHOMEPRO GENERAL CONTRACTI07/13/2021
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP05/07/2018
BISOTISSUEDNEW REGAL CONSTRUCTION IN07/17/2020
BISOTISSUEDMARKLUX INC06/05/2020
BISOTISSUEDWINWAY DEVELOPMENT LLC10/21/2019
BISPLISSUEDCROSSFIELD PLBG.&HTG10/08/2019
BISOTISSUEDWINWAY DEVELOPMENT LLC10/01/2019
BISPLISSUEDDAVID JABLON12/14/2018
BISOTISSUEDKEVIN KENEFICK10/29/2018
BISPLISSUEDRENEW PLUMBING CORP05/10/2018
BISOTISSUEDA-1 STATE INC05/07/2018
BISPLISSUEDFJP MECHANICAL INC04/16/2018
BISPLISSUEDP.S.I. MECHANICAL03/06/2018
BISOTISSUEDFAMOUS RESTORATION INC02/27/2018
BISFBISSUEDABILENE, INC02/10/2016
BISBLISSUEDABILENE, INC11/30/2015
BISFBISSUEDABILENE, INC08/21/2015
BISFBISSUEDABILENE, INC07/03/2015
BISPLISSUEDBELL FUEL OIL, LLC07/03/2015
BISOTISSUEDDL RESTORATION & BUILDERS06/24/2013
BISPLISSUED21 PLUMBING & HEATING INC06/05/2013
BISOTISSUEDJC LA ROCA CONSTRUCTION C05/23/2013
BISMHISSUEDDL RESTORATION & BUILDERS03/22/2013
BISOTISSUEDMC FAR CONTRACTORS INC01/11/2013
BISOTISSUEDFULLER & COMPANY INC07/05/2012
BISEQISSUEDTRIBORO CONTRACTING & REM04/01/2011
BISOTISSUEDTRIBORO CONTRACTING & REM03/21/2011
BISOTISSUEDPYRAMID RESTORATION INC02/12/2010
BISPLISSUEDPFEIFFER P,HTG,SPKL CONT09/15/2009
BISOTISSUEDJC LA ROCA CONSTR CORP07/13/2007
BISOTISSUEDSKYLINE RESTORATION INC03/25/2005
+ 16 more permits on file
18 projects · most recent 07/24/2026
General Wiring Lighting
FiledStatusContractorScope
07/24/2026CompleteATMOS ELECTRIC SVCE CORP—
01/29/2026CompleteRJ RUSSO ELECTRIC CO.General Wiring
03/21/2024CompleteALL CITY ELECTRICAL INCGeneral Wiring
02/21/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/17/2024CompleteVLASHAVA ELEC CONTR'G COR—
06/06/2023CompleteFUSED ELECTRIC CONTNG CORGeneral Wiring
05/11/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
01/03/2023CompleteH. & L. ELECTRIC INCGeneral Wiring
02/02/2022CompleteASKO ELEC CONST & MAIN INGeneral Wiring
07/29/2021CompleteTM SELECT ELECTRIC CORPGeneral Wiring
02/15/2021CompleteNGM ELECTRIC INCGeneral Wiring
05/18/2020CompleteCENTURY ELECTRIC LLCGeneral Wiring
10/05/2019CompleteLOTUS ELECTRICGeneral Wiring
10/03/2019CompleteLOTUS ELECTRICGeneral Wiring
12/10/2018CompleteA.C. MORGAN ELECTRIC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/17/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/25/2023Fire-Resistant Penetrations and JointsChris Yiuspecial
05/25/2023Energy Code Compliance InspectionsWieslawa Jasiulewicz Majranprogress
05/25/2023Lighting in dwelling unitsWieslawa Jasiulewicz Majranenergy_progress
05/24/2023FinalWieslawa Jasiulewicz Majranprogress
08/19/2022FinalHugh Robothamprogress
01/04/2021FinalJoseph Farahnikprogress
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/29/2026Q00034349-I1Request digital key ↗
08/25/2026Q00757303-I1Request digital key ↗
08/24/2026Q00880361-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/15/2026Q00469873-I1Request digital key ↗
08/15/2026Q00446800-I1Request digital key ↗
08/15/2026Q00469873-P1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION30
12/27/2020440654560Open ↗
05/01/2020421732691Open ↗
03/09/2020421756282Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION26
07/17/2020440549578Open ↗
06/05/2020421756282Open ↗
04/21/2020421756282Open ↗
Showing 3 of 26 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
05/01/2020421732691Open ↗
04/30/2020421732691Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/22/2019421631069Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/16/2019440555418Open ↗
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
04/20/2020421756282Open ↗
03/09/2020421756282Open ↗
11/22/2019440555418Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026Q00034349-I1Open ↗
08/27/2026Q00446800-I1Open ↗
08/26/2026Q00469873-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
05/16/2018421631069Open ↗
03/28/2013420825664Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
03/28/2013420825664Open ↗
Showing 1 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
09/04/2019440555418Open ↗
08/12/2019440555418Open ↗
06/11/2019440549578Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00469873-I1Open ↗
09/01/2026Q00446800-I1Open ↗
08/26/2026Q00880361-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/27/2020440654560Open ↗
07/02/2015440232277Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/16/2018421631069Open ↗
07/02/2015440232277Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/02/2015440232277Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q00880361-I1Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING8
09/04/2019440555418Open ↗
11/19/2018440491521Open ↗
09/14/2018440491521Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/16/2018421631069Open ↗
01/11/2018421591682Open ↗
05/17/2014420977991Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/02/2015440232277Open ↗
06/27/2014420977991Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/04/2013420827902Open ↗
09/25/2013420827902Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
04/20/2018421591682Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes7
03/09/2020421756282Open ↗
08/12/2019440555418Open ↗
06/11/2019440549578Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
05/17/2014420977991Open ↗
03/28/2013420825664Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/11/2018421591682Open ↗
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/27/2020440654560Open ↗
03/09/2020421756282Open ↗
08/12/2019440555418Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/18/2026Q01304470-I1Open ↗
08/15/2026Q00469873-I1Open ↗
08/15/2026Q00446800-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/28/2013420825664Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
12/05/2018440491521Open ↗
09/14/2018440491521Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/09/2020421756282Open ↗
11/22/2019440555418Open ↗
11/22/2019440555418Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
12/27/2020440654560Open ↗
09/23/2020440549578Open ↗
08/03/2020421756282Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
09/23/2020440549578Open ↗
08/03/2020421756282Open ↗
11/22/2019440555418Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections1
04/22/2013420827902Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/02/2015440232277Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/27/2020440654560Open ↗
09/23/2020440549578Open ↗
08/03/2020421756282Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS11
01/11/2018421591682Open ↗
05/17/2014420977991Open ↗
04/04/2013420827902Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
09/23/2020440549578Open ↗
08/03/2020421756282Open ↗
11/22/2019440555418Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/14/2018440491521Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
03/28/2013420825664Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT29
09/23/2020440549578Open ↗
08/03/2020421756282Open ↗
03/09/2020421756282Open ↗
Showing 3 of 29 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
03/28/2013420825664Open ↗
▸Filing & Intake Forms31
▸BISADDITIONAL INFORMATION13
09/23/2020440549578Open ↗
10/28/2019440555418Open ↗
09/24/2019440555418Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET12
03/09/2020421756282Open ↗
05/16/2018421631069Open ↗
01/11/2018421591682Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/27/2020440654560Open ↗
08/12/2019440555418Open ↗
06/11/2019440549578Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
05/01/2020421732691Open ↗
▸Other Documents11
▸DOB NOWDHCR Document11
08/15/2026Q00469873-I1Open ↗
08/13/2026Q00743260-I1Open ↗
08/13/2026Q00743260-P2Open ↗
Showing 3 of 11 on file for this type