← Back
One story retail building
112-20 FARMERS BOULEVARD
QUEENS · St. Albans · BIN 4222062
💬 Discuss this project
1960Year Built
1Stories
K1Building Class
R5BZoning
5,100 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · 10,816 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER CHO ARCHITECTS, PLLC306/10/2025
SYED ENGINEERING, P.C.104/11/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GABRIELE'S DESIGN INCGeneral Contractor203/21/2026
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342306/10/2025
SYED ENGINEERING, P.C.7054104/11/2024
Building Lifecycle
All (60)Filed (4)Permit Issued (3)Signed Off (2)Violation (25)Inspection (4)Special Inspection (22)
02/05/2026
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXIST. LAUNDROMAT WITH, REPLACE DRYER, WASHER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185158-S1
08/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXIST. LAUNDROMAT WITH, REPLACE DRYER, WASHER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185158-I1
07/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/10/2025
Filed — Alteration
INTERIOR RENOVATION OF EXIST. LAUNDROMAT WITH, REPLACE DRYER, WASHER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185158-P1
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
06/10/2025
Special inspection requirement — Mechanical Systems
Danny Chen
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
PETER CHO
06/10/2025
Special inspection requirement — Final
PETER CHO
06/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
PETER CHO
06/10/2025
Special inspection requirement — Interior lighting power
PETER CHO
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
PETER CHO
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PETER CHO
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
PETER CHO
06/10/2025
Special inspection requirement — Interior lighting power
PETER CHO
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
PETER CHO
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PETER CHO
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
PETER CHO
06/10/2025
Special inspection requirement — Mechanical Systems
Danny Chen
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
06/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
PETER CHO
06/10/2025
Special inspection requirement — Final
PETER CHO
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
PETER CHO
05/27/2025
Permit issued — Plumbing
Q01185158-S1-PL
03/26/2025
Violation issued (ECB, closed)
Unknown
03/26/2025
Violation issued (ECB, closed)
Unknown
03/26/2025
Violation issued (ECB, closed)
Construction
03/14/2025
Permit issued — General Construction
Q01185158-I1-GC-CX
03/04/2025
Filed — Alteration
INTERIOR RENOVATION OF EXIST. LAUNDROMAT WITH, REPLACE DRYER, WASHER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185158-S1
03/04/2025
Filed — Alteration
INTERIOR RENOVATION OF EXIST. LAUNDROMAT WITH, REPLACE DRYER, WASHER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01185158-I1
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
PETER CHO
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2024
Permit issued — General Construction
Q01019172-I1-GC
04/11/2024
Filed — Alteration
Q01019172-I1
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
04/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/25/2024
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2021
Violation issued (FDNY_NOV, closed)
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2008
Violation issued (ECB, open)
Boilers
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2002
Violation issued (ECB, closed)
Boilers
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/27/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN03/14/2025
DOB NOWGeneral ConstructionPermit IssuedGABRIELES DESIGN06/03/2024
BISOTISSUEDMETROPOLITIAN LNDRY.MACHINERY03/22/2001
BISOTISSUEDA-Z MECHANICAL CONTRACTING INC.12/20/2000
BISBLISSUEDSTEPHEN BRAUN04/14/2000
BISBLISSUEDA.R.FUELS INC.05/27/1994
2 projects · most recent 03/26/2025
General Wiring
FiledStatusContractorScope
03/26/2025Permit IssuedERIC & NG ELEC'L, INC.General Wiring
01/30/2024Permit IssuedSTEEL CITY ELECTRICAL CONGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/10/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
06/10/2025Mechanical SystemsDanny Chenspecial
06/10/2025Energy Code Compliance InspectionsPETER CHOprogress
06/10/2025FinalPETER CHOprogress
06/10/2025Fire-Resistance Rated ConstructionPETER CHOprogress
06/10/2025Interior lighting powerPETER CHOenergy_progress
06/10/2025HVAC-R and service water heating equipmentPETER CHOenergy_progress
06/10/2025HVAC-R and service water piping design and insulationPETER CHOenergy_progress
06/10/2025HVAC-R and service water heating system controlsPETER CHOenergy_progress
06/10/2025Interior lighting powerPETER CHOenergy_progress
06/10/2025HVAC-R and service water heating system controlsPETER CHOenergy_progress
06/10/2025HVAC-R and service water piping design and insulationPETER CHOenergy_progress
06/10/2025HVAC-R and service water heating equipmentPETER CHOenergy_progress
06/10/2025Mechanical SystemsDanny Chenspecial
06/10/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
06/10/2025Fire-Resistance Rated ConstructionPETER CHOprogress
06/10/2025FinalPETER CHOprogress
06/10/2025Energy Code Compliance InspectionsPETER CHOprogress
03/03/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
03/03/2025Energy Code Compliance InspectionsPETER CHOprogress
04/11/2024Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
04/11/2024Energy Code Compliance InspectionsRAFI HAMIDprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q01019172-I1Request digital key ↗
08/20/2026Q01185158-P1Request digital key ↗
08/20/2026Q01185158-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q01185158-P1Open ↗
09/01/2026Q01185158-P1Open ↗
09/01/2026Q01185158-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026Q01185158-P1Open ↗
08/20/2026Q01185158-S1Open ↗
08/20/2026Q01185158-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01185158-P1Open ↗
08/30/2026Q01185158-S1Open ↗
08/28/2026Q01185158-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026Q01185158-S1Open ↗
08/20/2026Q01185158-I1Open ↗
08/20/2026Q01185158-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed3
08/13/2026Q01019172-I1Open ↗
08/13/2026Q01185158-S1Open ↗
08/13/2026Q01185158-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q01185158-I1Open ↗
08/13/2026Q01185158-S1Open ↗