Two stories - detached, small or mid-size
112-22 203 STREET
QUEENS · St. Albans · BIN 4505324
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2Zoning
1,514 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC211/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIKE ASSOCIATES INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965211/04/2025
Building Lifecycle
All (29)Filed (2)Permit Issued (2)Violation (2)Inspection (7)Objection (12)Special Inspection (4)
03/23/2026
Violation issued (ECB, closed)
Construction
03/18/2026
Permit issued — General Construction
Q01099811-I1-GC-CX
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
12/11/2025
Special inspection requirement — Masonry
SYED RIZVI
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
12/11/2025
Special inspection requirement — Final
HAYM GROSS
11/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
application filed to rebuild existing garage;; new row of cmu blocks added to existing foundation, new framing for walls and roof, new gypsum boards.
Q01099811-P1
10/03/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2025
Permit issued — Structural
Q01099811-I1-GC-CX
06/02/2025
Objection resolved — Addressed
05/15/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Other
04/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/03/2025
Objection resolved — Addressed
01/07/2025
Objection raised — Zoning
12/31/2024
Objection resolved — Addressed
12/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/11/2024
Objection resolved — Addressed
09/11/2024
Objection resolved — Addressed
09/09/2024
Objection raised — Energy
09/09/2024
Objection raised — Other
09/09/2024
Objection raised — Zoning
09/09/2024
Objection raised — Structural
08/27/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
application filed to rebuild existing garage;; new row of cmu blocks added to existing foundation, new framing for walls and roof, new gypsum boards.
Q01099811-I1
08/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRIKE ASSOCIATES INC03/18/2026
DOB NOWStructuralPermit IssuedRIKE ASSOCIATES INC07/02/2025
1 project · most recent 11/04/2025
Masonry Wood
FiledStatusContractorScope
11/04/2025Permit IssuedRIKE ASSOCIATES INCMasonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/11/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
12/11/2025MasonrySYED RIZVIspecial
12/11/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
12/11/2025FinalHAYM GROSSprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01099811-P2Request digital key ↗
08/18/2026Q01099811-P1Request digital key ↗
08/18/2026Q01099811-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01099811-P1Open ↗
08/13/2026Q01099811-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01099811-P2Open ↗
08/13/2026Q01099811-P1Open ↗
08/13/2026Q01099811-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01099811-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q01099811-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01099811-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01099811-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026Q01099811-P2Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification3
08/18/2026Q01099811-P2Open ↗
08/13/2026Q01099811-I1Open ↗
08/13/2026Q01099811-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/18/2026Q01099811-P2Open ↗
08/13/2026Q01099811-I1Open ↗
08/13/2026Q01099811-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01099811-I1Open ↗