← Back
Large suburban residence
112-30 68 AVENUE
QUEENS · BIN 4052220
💬 Discuss this project
1930Year Built
1.75Stories
A3Building Class
R1-2AZoning
1,744 sfGross Floor Area
1Units
Large suburban residence · 6,500 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction37p · 1 filing · 20 docs
Floor 1Under Construction37p · 1 filing · 20 docs
CellarUnder Construction35p · 1 filing · 20 docs
1 job · most recent 03/03/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2026Signed-offEJ HOMES 45 LLCHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×12
Heating
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×12
Ventilation
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×6
1 job · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
1 job · most recent 03/03/2026
Steel Concrete
FiledStatusContractorScope
03/03/2026Permit IssuedFOUR POINTS P & H CORPSteel, Concrete
1 job · most recent 03/03/2026
Fence
FiledStatusContractorScope
03/03/2026Permit IssuedFOUR POINTS P & H CORPFence
Building Lifecycle
All (94)Filed (9)Permit Issued (6)Signed Off (1)Inspection (4)Objection (44)Special Inspection (30)
08/18/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install footings and foundation walls
Q01257905-S3
07/09/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/30/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
06/23/2026
Permit issued — Plumbing
Q01257905-S5-PL
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Objection resolved — Addressed
04/10/2026
Special inspection requirement — Metering
William Alicea
04/10/2026
Special inspection requirement — Air barrier - visual inspection
William Alicea
04/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
William Alicea
04/10/2026
Special inspection requirement — Ventilation and air distribution system
William Alicea
04/10/2026
Special inspection requirement — Interior lighting power
William Alicea
04/10/2026
Special inspection requirement — Insulation placement and R values
William Alicea
04/10/2026
Special inspection requirement — Electric vehicle service equipment requirements
William Alicea
04/10/2026
Special inspection requirement — Air barrier — testing
William Alicea
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
04/10/2026
Special inspection requirement — Fenestration air leakage
William Alicea
04/10/2026
Special inspection requirement — Maintenance information
William Alicea
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
04/10/2026
Special inspection requirement — Permanent certificate
William Alicea
04/10/2026
Special inspection requirement — Protection of exposed foundation insulation
William Alicea
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
04/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
04/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
04/10/2026
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
04/10/2026
Special inspection requirement — Mechanical Systems
William Alicea
04/10/2026
Special inspection requirement — Subgrade Inspections
William Alicea
04/10/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
William Alicea
04/10/2026
Special inspection requirement — Masonry
William Alicea
04/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
04/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
William Alicea
04/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
04/10/2026
Special inspection requirement — Final
RICHARD MUESCH JR.
04/10/2026
Special inspection requirement — Fenestration areas
William Alicea
04/10/2026
Special inspection requirement — Exterior lighting power
William Alicea
03/31/2026
Objection raised — Plumbing
03/12/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/10/2026
Objection raised — Scope
03/05/2026
Objection raised — Scope
03/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Install footings and foundation walls
Q01257905-P1
02/22/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Install footings and foundation walls
Q01257905-P3
02/22/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Install footings and foundation walls
Q01257905-P2
02/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Install footings and foundation walls
Q01257905-S5
02/10/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/27/2026
Permit issued — Foundation
Q01257905-S2-FO
01/25/2026
Permit issued — General Construction
Q01257905-I1-GC-CX
01/25/2026
Permit issued — Structural
Q01257905-S4-ST
01/22/2026
Permit issued — Support of Excavation
Q01257905-S3-SE
01/09/2026
Permit issued — Construction Fence
Q01257905-S1-FN
11/11/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Structural
10/17/2025
Objection raised — Other
10/17/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Inspections
Latest 60 of 94 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2026$2.0M—— → —$1,147/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS403/03/2026
NYC SPECIAL CONTRACTORS502/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING68601803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EJ HOMES 45 LLCGeneral Contractor507/08/2026
FOUR POINTS P & H CORPPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323703/03/2026
AA BUILDING & INSPECTION1519102/20/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP06/23/2026
DOB NOWFoundationSigned-offEJ HOMES 4501/27/2026
DOB NOWGeneral ConstructionPermit IssuedEJ HOMES 4501/25/2026
DOB NOWStructuralSigned-offEJ HOMES 4501/25/2026
DOB NOWSupport of ExcavationSigned-offEJ HOMES 4501/22/2026
DOB NOWConstruction FencePermit IssuedEJ HOMES 4501/09/2026
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/09/2026Pass-Final PL - UndergroundPassView ↗
06/30/2026Fail-Final PL - UndergroundFailView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
04/10/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
04/10/2026Fenestration air leakageWilliam Aliceaenergy_progress
04/10/2026Ventilation and air distribution systemWilliam Aliceaenergy_progress
04/10/2026MeteringWilliam Aliceaenergy_progress
04/10/2026Interior lighting powerWilliam Aliceaenergy_progress
04/10/2026Protection of exposed foundation insulationWilliam Aliceaenergy_progress
04/10/2026Insulation placement and R valuesWilliam Aliceaenergy_progress
04/10/2026Air barrier - visual inspectionWilliam Aliceaenergy_progress
04/10/2026Electric vehicle service equipment requirementsWilliam Aliceaenergy_progress
04/10/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
04/10/2026Air barrier — testing William Aliceaenergy_progress
04/10/2026Maintenance informationWilliam Aliceaenergy_progress
04/10/2026Permanent certificateWilliam Aliceaenergy_progress
04/10/2026Duct leakage testing, insulation and designWilliam Aliceaenergy_progress
04/10/2026Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
04/10/2026Exterior lighting powerWilliam Aliceaenergy_progress
04/10/2026Exterior Insulation and Finish Systems (EIFS)William Aliceaspecial
04/10/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/10/2026Concrete - Cast-In-PlaceWilliam Aliceaspecial
04/10/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
04/10/2026Mechanical SystemsWilliam Aliceaspecial
04/10/2026Subgrade InspectionsWilliam Aliceaspecial
04/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWilliam Aliceaspecial
04/10/2026MasonryWilliam Aliceaspecial
04/10/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
Latest 25 of 84.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026Q01257905-I1Request digital key ↗
08/17/2026Q01257905-S5Request digital key ↗
08/17/2026Q01257905-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01257905-I1Open ↗
08/13/2026Q01257905-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01257905-I1Open ↗
08/13/2026Q01257905-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01257905-I1Open ↗
08/13/2026Q01257905-P1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026Q01257905-S5Open ↗
09/01/2026Q01257905-S5Open ↗
09/01/2026Q01257905-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q01257905-S5Open ↗
09/01/2026Q01257905-S5Open ↗
09/01/2026Q01257905-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026Q01257905-I1Open ↗
08/17/2026Q01257905-S5Open ↗
08/17/2026Q01257905-P3Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026Q01257905-S5Open ↗
08/17/2026Q01257905-P3Open ↗
08/17/2026Q01257905-P2Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT5
08/13/2026Q01257905-I1Open ↗
08/13/2026Q01257905-S5Open ↗
08/13/2026Q01257905-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q01257905-S5Open ↗
08/13/2026Q01257905-S2Open ↗
08/13/2026Q01257905-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q01257905-S3Open ↗
08/13/2026Q01257905-S2Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q01257905-I1Open ↗
08/13/2026Q01257905-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01257905-I1Open ↗
08/13/2026Q01257905-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01257905-I1Open ↗
08/17/2026Q01257905-P1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01257905-S4Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01257905-S3Open ↗