← Back
BuildNYC
Three families
112 BAY 35 STREET
BROOKLYN · BIN 3185943
💬 Discuss this project
1925Year Built
2.5Stories
C0Building Class
R5Zoning
2,524 sfGross Floor Area
3Units
Three families · 3,843 sf lot · 0.66 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 26p · 1 filing · 17 docs
Floor 12p · 1 filing · 17 docs
Cellar4p · 1 filing · 17 docs
Basement1p · 1 filing · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2023$1.7M—Private party → Private party$662/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nic 88311/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Basic Groups603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Built NYGGeneral Contractor303/21/2026
PipestylistsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Nic 888371311/15/2023
Building Lifecycle
12/21/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/16/2023
Signed off — Alteration
Install boiler, HWH, washer and gas dryer in the existing 2 story building. Install kitchen and bathroom fixtures, gas and plumbing works as per plan. No change in egress, use, or occupancy.
B00917345-I1
11/16/2023
Signed off — Alteration
Install boiler, HWH, washer and gas dryer in the existing 2 story building. Install kitchen and bathroom fixtures, gas and plumbing works as per plan. No change in egress, use, or occupancy.
B00917345-S1
11/15/2023
Filed — Alteration
Install boiler, HWH, washer and gas dryer in the existing 2 story building. Install kitchen and bathroom fixtures, gas and plumbing works as per plan. No change in egress, use, or occupancy.
B00917345-P4
11/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T Plumbing09/19/2023
DOB NOWGeneral ConstructionSigned-offBuilt NYG08/22/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/21/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
11/15/2023Fire-Resistant Penetrations and JointsEric Sunspecial
11/15/2023Mechanical SystemsEric Sunspecial
11/15/2023FinalEric Sunprogress
11/15/2023Fire-Resistance Rated ConstructionEric Sunprogress
11/15/2023Energy Code Compliance InspectionsEric Sunprogress
11/15/2023HVAC-R and service water heating system controlsEric Sunenergy_progress
11/15/2023Fenestration and door U-factor and product ratingsEric Sunenergy_progress
11/15/2023Fenestration air leakageEric Sunenergy_progress
11/15/2023HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/15/2023Interior lighting powerEric Sunenergy_progress
11/15/2023Duct leakage testing, insulation and designEric Sunenergy_progress
11/15/2023HVAC-R and service water heating equipmentEric Sunenergy_progress
11/15/2023Insulation placement and R valuesEric Sunenergy_progress
11/15/2023Fenestration areasEric Sunenergy_progress
11/15/2023Maintenance informationEric Sunenergy_progress
11/15/2023Air barrier - visual inspectionEric Sunenergy_progress
11/15/2023Fire-Resistant Penetrations and JointsEric Sunspecial
11/15/2023Mechanical SystemsEric Sunspecial
11/15/2023Energy Code Compliance InspectionsEric Sunprogress
11/15/2023FinalEric Sunprogress
11/15/2023Fire-Resistance Rated ConstructionEric Sunprogress
11/15/2023Fenestration air leakageEric Sunenergy_progress
11/15/2023Air barrier - visual inspectionEric Sunenergy_progress
11/15/2023HVAC-R and service water heating system controlsEric Sunenergy_progress
11/15/2023Fenestration and door U-factor and product ratingsEric Sunenergy_progress
Latest 25 of 34.
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account