Eleven2 Condominium
112 COOPER STREET · BIN 3079948
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof32p · 3 filings · 20 docs
Penthouse37p · 4 filings · 20 docs
Floor 427p · 1 filing · 20 docs
Floor 334p · 3 filings · 20 docs
Floor 227p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar35p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAT CONSTRUCTION SERVICES503/22/2026
112 COOPER1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2016$1.2M—— → —— not available
04/25/2014$550K—Private party → EL DEVELOPMENT INC.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PSARCHITECTURE PLLC505/05/2025
HRM ENGINEERING SERVICES, PC401/10/2024
KNF SERVICES CROP310/14/2023
ARQUITECTURA VARELA104/14/2022
KNF SERVICES CORP211/02/2021
STROH ENGINEERING SERVICES, P.C.110/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP903/21/2026
KNF SERVICES CROP403/21/2026
BANJI AWOSIKA ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAT CONSTRUCTION SERVICESGeneral Contractor2204/09/2026
WCK ELECTRIC CORP 002413General Contractor903/22/2026
DEEP FORMATION INCGeneral Contractor204/09/2026
PRAGNESH SURTIElectrical103/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161005/05/2025
Building Lifecycle
All (117)Filed (15)Permit Issued (16)Signed Off (9)Violation (5)Inspection (10)Objection (32)Special Inspection (30)
05/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/23/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/23/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
06/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/23/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
06/23/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
06/23/2025
Special inspection requirement — Masonry
FAHAD FATEH
06/23/2025
Special inspection requirement — Concrete - Precast
FAHAD FATEH
06/23/2025
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
06/23/2025
Special inspection requirement — Footing and Foundation
FAHAD FATEH
06/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/23/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/23/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
06/23/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/23/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
06/23/2025
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
06/23/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
FAHAD FATEH
06/23/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
06/23/2025
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
06/23/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
06/23/2025
Special inspection requirement — Final
FAHAD FATEH
06/23/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/23/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/23/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/23/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
06/23/2025
Special inspection requirement — Metering
FAHAD FATEH
06/23/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
06/23/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/05/2025
Filed — New Building
PROPOSE NEW BUILDING 4 STORY, (8) DWELLING UNITS WITH CELLAR & PENTHOUSE
B00606686-P5
02/28/2025
Signed off — Alteration
Filing For Foundation @ Cellar Floor, in conjunction with DOB NOW NB Job # B00606686-I1 & ST Job # B00616502-I1 - NEW 4-STORY MULTI DWELLNG RESIDENTIAL BUILDING.
B00616439-I1
02/27/2025
Permit issued — Foundation
B00616439-I1-FO
01/13/2025
Signed off — Alteration
B00713623-I1
01/06/2025
Signed off — Alteration
B00617695-I1
12/17/2024
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NB JOB # B00606686
B00717073-I1
12/17/2024
Permit issued — Sidewalk Shed
B00713623-I1-SH
12/10/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/06/2024
Signed off — Alteration
B00618534-I1
12/05/2024
Signed off — Alteration
B00616502-I1
11/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/06/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/17/2024
Permit issued — Foundation
B00606686-I1-GC-CX
05/10/2024
Objection raised — Fire_Protection
05/10/2024
Objection raised — Other
05/10/2024
Objection raised — Zoning
05/10/2024
Objection raised — Zoning
05/10/2024
Objection raised — Other
05/07/2024
Signed off — Alteration
Filing for a temporary supported scaffolding. No change in use, egress or occupancy.
B00926036-I1
05/07/2024
Signed off — Alteration
FILING FOR POST APPROVAL AMENDMENT FOR SIDE WALK SHED
B00700232-I1
04/16/2024
Signed off — Alteration
B00588121-I1
04/15/2024
Objection raised — Accessibility
04/05/2024
Filed — New Building
PROPOSE NEW BUILDING 4 STORY, (8) DWELLING UNITS WITH CELLAR & PENTHOUSE
B00606686-P2
01/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/10/2024
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NB JOB # B00606686
B00717073-P1
01/08/2024
Permit issued — Sprinklers
B00717073-I1-EW-SP
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offSAT CONSTRUCTION SERVICES02/27/2025
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC12/17/2024
DOB NOWFoundationPermit IssuedSAT CONSTRUCTION SERVICES07/17/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL01/08/2024
DOB NOWConstruction FenceSigned-offSAT CONSTRUCTION SERVICES01/04/2024
DOB NOWMechanical SystemsSigned-offSAT CONSTRUCTION SERVICES11/01/2023
DOB NOWSupported ScaffoldSigned-offSAT CONSTRUCTION SERVICES09/29/2023
DOB NOWPlumbingSigned-offN AND S PLUMBING INC09/21/2023
DOB NOWStructuralSigned-offSAT CONSTRUCTION SERVICES09/06/2023
DOB NOWSidewalk ShedSigned-offSAT CONSTRUCTION SERVICES09/06/2023
DOB NOWGeneral ConstructionPermit IssuedSAT CONSTRUCTION SERVICES07/24/2023
DOB NOWFoundationPermit IssuedSAT CONSTRUCTION SERVICES07/21/2023
DOB NOWConstruction FenceSigned-offSAT CONSTRUCTION SERVICES01/05/2023
DOB NOWFoundationSigned-offSAT CONSTRUCTION SERVICES07/06/2022
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC04/27/2022
DOB NOWConstruction FenceSigned-offSAT CONSTRUCTION SERVICES12/08/2021
BISEQISSUEDSAT CONSTRUCTION SERVICES07/01/2022
BIS—ISSUEDSAT CONSTRUCTION SERVICES03/28/2022
1 project · most recent 10/30/2024
General Wiring
FiledStatusContractorScope
10/30/2024CompleteWCK ELECTRIC CORP.General Wiring
2 projects · most recent 05/05/2025
FiledStatusContractorScope
05/05/2025Permit IssuedSAT CONSTRUCTION SERVICES5 scope_items
11/02/2021Signed-offSAT CONSTRUCTION SERVICES1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/23/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/23/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
06/23/2025Interior lighting powerFAHAD FATEHenergy_progress
06/23/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
06/23/2025Maintenance informationFAHAD FATEHenergy_progress
06/23/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/23/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
06/23/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
06/23/2025Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
06/23/2025MeteringFAHAD FATEHenergy_progress
06/23/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
06/23/2025Air barrier — testing FAHAD FATEHenergy_progress
06/23/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
06/23/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/23/2025Permanent certificateFAHAD FATEHenergy_progress
06/23/2025Fenestration air leakageFAHAD FATEHenergy_progress
06/23/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/23/2025Fenestration areasFAHAD FATEHenergy_progress
06/23/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
06/23/2025Exterior lighting powerFAHAD FATEHenergy_progress
06/23/2025Lighting controlsFAHAD FATEHenergy_progress
06/23/2025FinalFAHAD FATEHprogress
06/23/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/23/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/23/2025Footing and FoundationFAHAD FATEHprogress
Latest 25 of 150.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/01/2026B00588121-I1Request digital key ↗
08/31/2026B00616502-I1Request digital key ↗
08/31/2026B00618534-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
10/11/2024320913071Open ↗
09/03/2024322117703Open ↗
08/30/2024322117703Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
09/12/2022322099126Open ↗
09/12/2022322099126Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00606686-I1Open ↗
08/13/2026B00606686-P3Open ↗
08/13/2026B00606686-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00606686-I1Open ↗
08/13/2026B00606686-P1Open ↗
08/13/2026B00606686-P2Open ↗
Showing 3 of 5 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
08/23/2024322117703Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/23/2024322117703Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00606686-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00588121-I1Open ↗
08/31/2026B00616502-I1Open ↗
08/31/2026B00618534-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00616439-I1Open ↗
09/01/2026B00616439-I1Open ↗
08/29/2026B00606686-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00616439-I1Open ↗
08/29/2026B00606686-P2Open ↗
08/29/2026B00606686-P2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/08/2023340896169Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/08/2023340896169Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00606686-P1Open ↗
08/13/2026B00606686-P3Open ↗
08/13/2026B00606686-P5Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/25/2026B00606686-P3Open ↗
08/25/2026B00606686-I1Open ↗
08/15/2026B00606686-P2Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/08/2023340896169Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
04/02/2022322099126Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00606686-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00606686-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00606686-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/02/2022322099126Open ↗
▸BISRODENT CONTROL1
04/02/2022322099126Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00617695-I1Open ↗
08/13/2026B00618534-I1Open ↗
08/13/2026B00606686-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT6
08/13/2026B00616439-I1Open ↗
08/13/2026B00606686-P1Open ↗
08/13/2026B00606686-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00606686-I1Open ↗
08/13/2026B00616439-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00616439-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/02/2022322099126Open ↗
04/02/2022322099126Open ↗
04/02/2022322099126Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/27/2024340896169Open ↗
▸Cost, Insurance & Ownership4
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
07/09/2022322099126Open ↗
04/02/2022322099126Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/12/2022322099126Open ↗
04/02/2022322099126Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION3
08/30/2024322117703Open ↗
08/30/2024322117703Open ↗
08/07/2024340896169Open ↗
▸DOB NOWAI1 Form3
08/13/2026B00717073-I1Open ↗
08/13/2026B00717073-P1Open ↗
08/13/2026B00617695-I1Open ↗
▸BISEFILING COVER SHEET2
08/05/2024322117703Open ↗
08/17/2021322099126Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/08/2023340896169Open ↗
▸Other Documents29
▸DOB NOWSite Survey: Initial5
08/13/2026B00606686-P1Open ↗
08/13/2026B00606686-P2Open ↗
08/13/2026B00606686-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00606686-I1Open ↗
08/13/2026B00606686-P2Open ↗
08/13/2026B00606686-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026B00606686-I1Open ↗
08/25/2026B00606686-P3Open ↗
08/15/2026B00606686-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSurvey5
08/13/2026B00606686-P3Open ↗
08/13/2026B00606686-I1Open ↗
08/13/2026B00606686-P1Open ↗
Showing 3 of 5 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET2
08/30/2024322117703Open ↗
08/08/2023340896169Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
08/23/2024322117703Open ↗
08/08/2023340896169Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/08/2023340896169Open ↗
▸BISPLOT DIAGRAM1
08/30/2024322117703Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00606686-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00606686-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00606686-I1Open ↗