112 EAST 16 STREET
MANHATTAN · BIN 1017816
💬 Discuss this project
1962Year Built
9Stories
G1Building Class
C6-2AZoning
50,174 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FISP: SAFE
All parking garages · Owner of record: EAST 16TH STREET OWNER LLC · 6,660 sf lot · 7.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 1 filing · 6 docs
Bulkhead3p · 1 filing · 6 docs
Floor 225p · 1 filing · 6 docs
Floor 215p · 1 filing · 6 docs
Floor 205p · 1 filing · 6 docs
Floor 195p · 1 filing · 6 docs
Floor 185p · 1 filing · 6 docs
Floor 174p · 1 filing · 6 docs
Floor 164p · 1 filing · 6 docs
Floor 155p · 1 filing · 6 docs
Floor 145p · 1 filing · 6 docs
Floor 135p · 1 filing · 6 docs
Floor 125p · 1 filing · 6 docs
Floor 115p · 1 filing · 6 docs
Floor 105p · 1 filing · 6 docs
Floor 94p · 1 filing · 6 docs
Floor 83p · 1 filing · 6 docs
Floor 75p · 1 filing · 6 docs
Floor 65p · 1 filing · 6 docs
Floor 55p · 1 filing · 6 docs
Floor 45p · 1 filing · 6 docs
Floor 35p · 1 filing · 6 docs
Floor 25p · 1 filing · 6 docs
Floor 15p · 1 filing · 6 docs
Cellar6p · 1 filing · 6 docs
Sub-Cellar5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TISHMAN2107/08/2026
EAST 16TH STREET OWNERS1703/22/2026
110 EAST 16TH STREET ASSO903/22/2026
110 EAST 16 STREET ASSOCI503/22/2026
A.K.EAST 16TH ST OWNER LL103/22/2026
METLIFE INSURANCE COMPANY103/22/2026
110 E 16 ST ASSC LLC103/22/2026
110 E 16 ST ASSOCAITES103/22/2026
110 E 16TH ST ASSOC LLC103/22/2026
ICON PARKING HOLDINGS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/24/2015$35.0M—METLIFE INSURANCE COMPANY OF CONNECTICUT → EAST 16TH STREET OWNER LLC$698/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM603/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
JM ZONING, LLC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARSENAL SCAFFOLD INCGeneral Contractor807/08/2026
DERRICK RAMDEENElectrical103/21/2026
SNB ELECTRICAL CONTNG CORElectrical103/22/2026
YEVGENY KOLTUNOVElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANCORA ENGINEERING, PLLC6818111/07/2025
Building Lifecycle
All (151)Filed (15)Permit Issued (5)Signed Off (1)Facade (FISP) (13)Violation (60)Objection (27)Special Inspection (30)
03/23/2026
Objection resolved — Addressed
12/08/2025
Objection raised — Admin
11/07/2025
Filed — Full Demolition
Mechanical equipment to assist with demolition on grade only . Debris chute will be built to lower debris from floor to floor
M01310832-S2
11/07/2025
Filed — Full Demolition
Mechanical equipment to assist with demolition on grade only . Debris chute will be built to lower debris from floor to floor
M01310832-I1
11/07/2025
Filed — Full Demolition
Mechanical equipment to assist with demolition on grade only . Debris chute will be built to lower debris from floor to floor
M01310832-S1
09/17/2025
Objection resolved — Resolved
08/26/2024
Objection raised — Other
08/26/2024
Objection resolved — Addressed
08/26/2024
Objection resolved — Addressed
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2024
Special inspection requirement — Air barrier - visual inspection
05/07/2024
Special inspection requirement — Preliminary
05/03/2024
Special inspection requirement — Vestibules
05/03/2024
Special inspection requirement — Lowest Floor Elevation
12/06/2023
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
09/01/2023
Objection raised — Other
08/30/2023
Filed — New Building
Application being filed to construct a new 22 story mixed use building to be reviewed via the HUB Unit.
M00812125-S9
07/12/2023
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00116866-I1
06/19/2023
Filed — New Building
Application being filed to construct a new 22 story mixed use building to be reviewed via the HUB Unit.
M00812125-S8
05/17/2023
Objection raised — Structural
05/16/2023
Objection resolved — Addressed
05/11/2023
Special inspection requirement — Underpinning
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection resolved — Resolved
05/03/2023
Special inspection requirement — Footing and Foundation
05/03/2023
Special inspection requirement — Final
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2023
Objection resolved — Addressed
04/13/2023
Objection resolved — Addressed
04/12/2023
Objection raised — Other
04/11/2023
Objection resolved — Addressed
04/11/2023
Objection resolved — Addressed
04/10/2023
Filed — New Building
Application being filed to construct a new 22 story mixed use building to be reviewed via the HUB Unit.
M00812125-S1
04/07/2023
Objection raised — Other
04/07/2023
Objection raised — Energy
04/06/2023
Filed — New Building
Application being filed to construct a new 22 story mixed use building to be reviewed via the HUB Unit.
M00812125-S7
04/03/2023
Objection resolved — Addressed
03/29/2023
Special inspection requirement — Subgrade Inspections
03/29/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/23/2023
Objection raised — Other
03/23/2023
Special inspection requirement — Exterior lighting power
03/23/2023
Special inspection requirement — Maintenance information
03/23/2023
Special inspection requirement — Metering
03/23/2023
Special inspection requirement — Duct leakage testing, insulation and design
03/23/2023
Special inspection requirement — Shutoff dampers
03/23/2023
Special inspection requirement — Interior lighting power
03/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
03/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2023
Special inspection requirement — Electrical motors and elevators
03/23/2023
Special inspection requirement — Lighting controls
03/23/2023
Special inspection requirement — Lighting in dwelling units
03/23/2023
Special inspection requirement — Standpipe Systems
03/22/2023
Objection resolved — Addressed
03/21/2023
Objection raised — Other
03/21/2023
Objection raised — Other
03/20/2023
Objection raised — Other
03/20/2023
Objection raised — Other
03/17/2023
Filed — New Building
Application being filed to construct a new 22 story mixed use building to be reviewed via the HUB Unit.
M00812125-S4
03/17/2023
Objection raised — Other
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC02/11/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/02/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/05/2020
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/21/2019
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC01/10/2019
BIS—ISSUEDSKYLINE RESTORATION INC04/06/2021
BISOTISSUEDSKYLINE RESTORATION INC03/16/2021
BIS—ISSUEDTHOMAS MAINTENANCE INC.01/19/2018
BISOTISSUEDETNA CONTRACTING INC10/16/2017
BISOTISSUEDSIGNS ARTISTRY AWNING CO*10/03/2017
BISOTISSUEDETNA CONTRACTING INC10/03/2017
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING07/07/2008
BIS—ISSUEDLAKKE CONSTRUCTION CORP.09/12/2007
BIS—ISSUEDADVANCE PARKING CORP.01/23/1998
1 project · most recent 08/30/2023
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/30/2023——Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
1 project · most recent 08/30/2023
Sprinkler System
FiledStatusContractorScope
08/30/2023——Sprinkler System
1 project · most recent 08/30/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/30/2023——Gas, Water/Sanitary
2 projects · most recent 06/16/2025
General Wiring
FiledStatusContractorScope
06/16/2025CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
01/08/2019CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 08/30/2023
Steel Concrete Masonry
FiledStatusContractorScope
08/30/2023——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
05/30/2024Air barrier - visual inspection—energy_progress
05/07/2024Preliminary—progress
05/03/2024Vestibules—energy_progress
05/03/2024Lowest Floor Elevation—progress
12/06/2023Alternative Materials - OTCR Buildings Bulletin Number—special
05/11/2023Underpinning—special
05/03/2023Footing and Foundation—progress
05/03/2023Final—progress
03/29/2023Subgrade Inspections—special
03/29/2023Excavations - Sheeting, Shoring, and Bracing—special
03/23/2023Exterior lighting power—energy_progress
03/23/2023Maintenance information—energy_progress
03/23/2023Metering—energy_progress
03/23/2023Duct leakage testing, insulation and design—energy_progress
03/23/2023Shutoff dampers—energy_progress
03/23/2023Interior lighting power—energy_progress
03/23/2023HVAC-R and service water heating system controls—energy_progress
03/23/2023HVAC-R and service water piping design and insulation—energy_progress
03/23/2023HVAC-R and service water heating equipment—energy_progress
03/23/2023Electrical motors and elevators—energy_progress
03/23/2023Lighting controls—energy_progress
03/23/2023Lighting in dwelling units—energy_progress
03/23/2023Standpipe Systems—special
03/15/2023Concrete - Cast-In-Place—special
02/16/2023Final—progress
Latest 25 of 52.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/21/2026M01310832-S1Request digital key ↗
08/21/2026M01310832-S2Request digital key ↗
08/15/2026M01310832-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00116866-I1Request digital key ↗
09/05/2026M00116866-P1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION23
10/27/2023141024399Open ↗
02/22/2023123915898Open ↗
02/07/2023123915898Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION11
04/07/2021123912613Open ↗
03/29/2021123912613Open ↗
03/16/2021140915721Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
05/17/2021123912613Open ↗
01/25/2018122706474Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/04/2024141024399Open ↗
▸BISEXPIRATION DATE ON AMENDED CITY PLANNINGAPPROVAL AND SCHEDULE A FILED UNDER PRESENT APPLICATION SHALL BE CONSISTENT.1
04/01/2021123912613Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026M00812125-S2Open ↗
08/13/2026M00812125-S1Open ↗
▸Seals & Professional Certifications40
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
08/14/2018110286734Open ↗
08/14/2018110286734Open ↗
01/29/2018121856679Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
03/11/2021123912613Open ↗
10/04/2017123159376Open ↗
10/04/2017123159385Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/04/2017123159376Open ↗
10/04/2017123159385Open ↗
03/18/2016122706474Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/05/2026M00116866-I1Open ↗
09/05/2026M00116866-P1Open ↗
08/21/2026M01310832-S1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/04/2024141024399Open ↗
09/04/2020140915721Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/03/2008110286734Open ↗
04/21/2008110142676Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/27/2023141024399Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026M00116866-I1Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST5
03/29/2021123912613Open ↗
03/11/2021123912613Open ↗
06/29/2018122706474Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE SIGNOFF1
07/19/2022123912613Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/04/2024141024399Open ↗
▸DOB NOWTenant Protection Plan1
09/05/2026M00116866-P1Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
01/03/2014121856679Open ↗
01/03/2014121856483Open ↗
07/03/2008110286734Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/04/2020140915721Open ↗
10/04/2017123159376Open ↗
10/04/2017123159385Open ↗
▸DOB NOWOER: Notice to Proceed3
09/05/2026M00116866-I1Open ↗
08/13/2026M00812125-S1Open ↗
08/13/2026M00812125-S2Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
02/28/2022140915721Open ↗
03/26/2021123912613Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
03/04/2024141024399Open ↗
09/04/2020140915721Open ↗
▸Energy Compliance12
▸BISAS-BUILT ENERGY ANALYSIS5
02/28/2022140915721Open ↗
10/19/2021122706474Open ↗
01/29/2018123159385Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/04/2017123159376Open ↗
10/04/2017123159385Open ↗
03/18/2016122706474Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/28/2022140915721Open ↗
03/11/2021123912613Open ↗
09/04/2020140915721Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
02/28/2022140915721Open ↗
02/28/2022140915721Open ↗
02/28/2022140915721Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
03/01/2022140915721Open ↗
10/19/2021122706474Open ↗
08/20/2018122706474Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
03/17/2021123912613Open ↗
03/11/2021123912613Open ↗
01/22/2018122706474Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/04/2017123159376Open ↗
—123912613Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/03/2008110286734Open ↗
04/21/2008110142676Open ↗
▸BISBSA/CPC APPROVAL1
03/26/2021123912613Open ↗
▸BISAMENDED CITY PLANNING APPROVAL.CURRENTAPPROVAL BASED ON WHICH PREVIOUS C.O.WAS ISSUED IS EXPIRED.1
04/01/2021123912613Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
02/28/2022140915721Open ↗
10/19/2021122706474Open ↗
09/04/2020140915721Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/27/2022123912613Open ↗
▸Filing & Intake Forms37
▸BISBOROUGH INTAKE FORM19
02/22/2023123915898Open ↗
02/07/2023123915898Open ↗
10/19/2021122706474Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET10
02/22/2023123915898Open ↗
02/07/2023123915898Open ↗
02/17/2021123912613Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
02/03/2022140915721Open ↗
01/05/2022140915721Open ↗
12/09/2021123912613Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/27/2023141024399Open ↗
09/04/2020140915721Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/27/2023141024399Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
03/11/2021123912613Open ↗
03/18/2016122706474Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/22/2018122706474Open ↗
04/17/2012110142676Open ↗
▸DOB NOWStructure Photographs1
08/15/2026M01310832-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026M01310832-I1Open ↗