BuildNYC
Elevator co-op, conversion from loft/warehouse
112 EAST 19TH STREET
MANHATTAN · Gramercy · BIN 1017903
💬 Discuss this project
1913Year Built
12Stories
D0Building Class
R8BZoning
55,049 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator co-op, conversion from loft/warehouse · Owner of record: Ruggles House · 4,600 sf lot · 11.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 10Unit 10F13p · 3 filings · 20 docs
Floor 9Unit 9R13p · 1 filing · 20 docs
Floor 815p · 1 filing · 20 docs
Floor 7Unit 7FUnder Construction38p · 1 filing · 17 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 3M19p · 4 filings · 18 docs
CellarBuchbinder & Warren LLC26p · 4 filings · 18 docs
Site & exteriorBuchbinder & Warren LLCUnder Construction11p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ruggles House7503/22/2026
Buchbinder & Warren7409/17/2026
116 E 19th Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DHD Architecture1003/21/2026
J Callahan Consulting803/21/2026
EA Design Group803/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nova Construction ServiceScaffold2307/08/2026
ErarisGeneral Contractor807/10/2026
Euro Art ConstructionGeneral Contractor603/21/2026
NY Sheet Metalspecialty_contractor303/21/2026
Procore MechanicalPlumbing207/08/2026
Stone & Oak InteriorsGeneral Contractor207/08/2026
Andamio ScaffoldingScaffold209/17/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Concept Construction ServiceGeneral Contractor207/08/2026
Reem Plumbing & HeatingPlumbing106/28/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Full Capacity FireFire Protection107/08/2026
Cresco ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP Inspections and Commis7079410/09/2025
HT Engineering6274106/13/2025
Phillip Summers, Architects9499103/03/2025
Alan Margolin & Associates423411/15/2023
Ryan Special Engineering2018210/27/2021
Building Lifecycle
All (184)Filed (21)Permit Issued (35)Signed Off (10)Facade (FISP) (18)Violation (45)Inspection (19)Objection (6)Special Inspection (30)
09/16/2026
Permit issued — Sidewalk Shed
M01417425-I1-SH
07/08/2026
Permit issued — General Construction
M01187474-I1-GC
07/08/2026
Permit issued — Mechanical Systems
M01187474-S1-MS
06/23/2026
Permit issued — Sidewalk Shed
M01417425-I1-SH
06/22/2026
Filed — Alteration
M01417425-I1
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/10/2026
Permit issued — Plumbing
M01109324-S1-PL
02/19/2026
Filed — Alteration
PROVIDE THRU-WALL AIR COOLED DX COOLING-ONLY CONDENSING UNIT AND CEILING HUNG, HORIZONTAL, DUCTED EVAPORATOR UNIT AS PART OF SPLIT SYSTEM TO SERVE APARTMENT COOLING LOAD. PROVIDE BATHROOM EXHAUST, KITCHEN EXHAUST, AND DRYER EXHAUST AS REQUIRED.
M01187474-P1
02/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/03/2025
Signed off — Alteration
Replace, relocate and install plumbing fixtures in existing apartment 8/9R on the 8th and 9th floor. Plumbing work. No change in use, occupancy or egress
M01109324-I1
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
10/16/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
10/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
10/09/2025
Filed — Alteration
Replace, relocate and install plumbing fixtures in existing apartment 8/9R on the 8th and 9th floor. Plumbing work. No change in use, occupancy or egress
M01109324-P2
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
09/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
09/30/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
09/15/2025
Permit issued — General Construction
M01109324-I1-GC
09/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Filed — Alteration
Replace, relocate and install plumbing fixtures in existing apartment 8/9R on the 8th and 9th floor. Plumbing work. No change in use, occupancy or egress
M01109324-P1
07/18/2025
Permit issued — General Construction
M01187474-I1-GC
07/18/2025
Permit issued — Mechanical Systems
M01187474-S1-MS
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
07/15/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
06/25/2025
Permit issued — Plumbing
M01187474-S3-PL
06/25/2025
Permit issued — Mechanical Systems
M01187474-S1-MS
06/20/2025
Permit issued — General Construction
M01187474-I1-GC
06/17/2025
Filed — Alteration
PROVIDE THRU-WALL AIR COOLED DX COOLING-ONLY CONDENSING UNIT AND CEILING HUNG, HORIZONTAL, DUCTED EVAPORATOR UNIT AS PART OF SPLIT SYSTEM TO SERVE APARTMENT COOLING LOAD. PROVIDE BATHROOM EXHAUST, KITCHEN EXHAUST, AND DRYER EXHAUST AS REQUIRED.
M01187474-S3
06/13/2025
Filed — Alteration
PROVIDE THRU-WALL AIR COOLED DX COOLING-ONLY CONDENSING UNIT AND CEILING HUNG, HORIZONTAL, DUCTED EVAPORATOR UNIT AS PART OF SPLIT SYSTEM TO SERVE APARTMENT COOLING LOAD. PROVIDE BATHROOM EXHAUST, KITCHEN EXHAUST, AND DRYER EXHAUST AS REQUIRED.
M01187474-S1
06/13/2025
Special inspection requirement — Maintenance information
HENRY TORRES
06/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
HENRY TORRES
06/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HENRY TORRES
06/13/2025
Special inspection requirement — Post-installed Anchors
HENRY TORRES
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENRY TORRES
06/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
HENRY TORRES
04/28/2025
Special inspection requirement — Final
HENRY TORRES
04/28/2025
Special inspection requirement — Mechanical Systems
HENRY TORRES
03/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2025
Filed — Alteration
PROVIDE THRU-WALL AIR COOLED DX COOLING-ONLY CONDENSING UNIT AND CEILING HUNG, HORIZONTAL, DUCTED EVAPORATOR UNIT AS PART OF SPLIT SYSTEM TO SERVE APARTMENT COOLING LOAD. PROVIDE BATHROOM EXHAUST, KITCHEN EXHAUST, AND DRYER EXHAUST AS REQUIRED.
M01187474-I1
02/27/2025
Special inspection requirement — Final
Phillip Summers
02/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Phillip Summers
02/12/2025
Signed off — Alteration
APPLICATION FILED FOR MODIFICATIONS/ADDITIONS TO PLUMBING/SPRINKLER ON THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00876501-I1
02/12/2025
Signed off — Alteration
APPLICATION FILED FOR MODIFICATIONS/ADDITIONS TO MECHANICAL ON THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00876499-I1
01/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2024
Permit issued — Plumbing
M01109324-S1-PL
12/17/2024
Signed off — Alteration
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS (INSTALL NEW CONVENIENCE STAIR) FROM THE CELLAR TO THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00876523-I1
12/16/2024
Signed off — Alteration
M00876474-I1
12/16/2024
Permit issued — General Construction
M01109324-I1-GC
12/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2024
Filed — Alteration
Replace, relocate and install plumbing fixtures in existing apartment 8/9R on the 8th and 9th floor. Plumbing work. No change in use, occupancy or egress
M01109324-S1
11/22/2024
Filed — Alteration
Replace, relocate and install plumbing fixtures in existing apartment 8/9R on the 8th and 9th floor. Plumbing work. No change in use, occupancy or egress
M01109324-S2
11/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
11/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
11/20/2024
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
11/20/2024
Special inspection requirement — Maintenance information
MOLLY GLENN
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/16/2026
DOB NOWGeneral ConstructionPermit IssuedEraris07/08/2026
DOB NOWMechanical SystemsPermit IssuedEraris07/08/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding06/23/2026
DOB NOWPlumbingSigned-offProcore Mechanical03/10/2026
DOB NOWGeneral ConstructionSigned-offStone & Oak Interiors09/15/2025
DOB NOWGeneral ConstructionPermit IssuedEraris07/18/2025
DOB NOWMechanical SystemsPermit IssuedEraris07/18/2025
DOB NOWPlumbingPermit IssuedReem Plumbing & Heating06/25/2025
DOB NOWMechanical SystemsPermit IssuedEraris06/25/2025
DOB NOWGeneral ConstructionPermit IssuedEraris06/20/2025
DOB NOWPlumbingSigned-offProcore Mechanical12/19/2024
DOB NOWGeneral ConstructionSigned-offStone & Oak Interiors12/16/2024
DOB NOWMechanical SystemsSigned-offConceptconsruction Services01/11/2024
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating11/29/2023
DOB NOWStructuralSigned-offConcept Construction Service11/29/2023
DOB NOWMechanical SystemsSigned-offConceptconsruction Services11/29/2023
DOB NOWGeneral ConstructionSigned-offConcept Construction Service11/29/2023
DOB NOWSprinklersSigned-offFull Capacity Fire11/29/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating12/17/2022
DOB NOWGeneral ConstructionSigned-offEuro Art Construction04/06/2022
DOB NOWMechanical SystemsPermit IssuedNY Sheet Metal11/10/2021
DOB NOWGeneral ConstructionSigned-offEuro Art Construction11/05/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating11/04/2021
DOB NOWSidewalk ShedSigned-offNova Construction Service06/03/2021
DOB NOWSupported ScaffoldSigned-offNova Construction Service06/02/2021
DOB NOWSidewalk ShedSigned-offNova Construction Service12/16/2020
DOB NOWSupported ScaffoldSigned-offNova Construction Service12/16/2020
DOB NOWSidewalk ShedSigned-offNova Construction Service12/31/2019
DOB NOWSupported ScaffoldSigned-offNova Construction Service12/30/2019
DOB NOWSupported ScaffoldSigned-offNova Construction Service12/03/2019
DOB NOWSidewalk ShedSigned-offNova Construction Service11/26/2019
DOB NOWSidewalk ShedSigned-offNova Construction Service05/30/2019
DOB NOWSidewalk ShedSigned-offNova Construction Service01/29/2019
DOB NOWSupported ScaffoldSigned-offNova Construction Service01/28/2019
BISOTISSUEDNova Construction Service01/03/2023
BISEQISSUEDNova Construction Service01/27/2021
BISEQISSUEDNova Construction Service01/27/2021
BISEQISSUEDNova Construction Service01/27/2021
BISEQISSUEDNova Construction Service08/20/2020
+ 45 more permits on file
1 project · most recent 02/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/19/2026Permit IssuedErarisAir Conditioning Systems
Cooling
National Comfort NCP4184000B 3 tons ×2
2 projects · most recent 02/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/19/2026Permit IssuedReem Plumbing & HeatingGas, Water/Sanitary
10/09/2025Signed-offProcore MechanicalGas, Water/Sanitary
8 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedBorowide Elect'l Contractors—
06/29/2025Permit IssuedCresco ElectricalGeneral Wiring
01/23/2025CompleteP & Z ElectricGeneral Wiring
07/29/2024Permit IssuedJavelin ElectricGeneral Wiring
01/25/2023CompleteTM Select ElectricGeneral Wiring
08/26/2019CompleteP & Z ElectricGeneral Wiring
01/30/2019CompleteBayside Electrical ContGeneral Wiring
01/24/2019CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
10/16/2025Post-installed AnchorsMOLLY GLENNspecial
10/16/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
09/30/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
09/30/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
09/30/2025Post-installed AnchorsMOLLY GLENNspecial
07/15/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
07/15/2025Post-installed AnchorsMOLLY GLENNspecial
07/15/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
06/13/2025HVAC-R and service water heating system controlsHENRY TORRESenergy_progress
06/13/2025HVAC-R and service water piping design and insulationHENRY TORRESenergy_progress
06/13/2025Post-installed AnchorsHENRY TORRESspecial
06/13/2025Fire-Resistant Penetrations and JointsHENRY TORRESspecial
06/13/2025Maintenance informationHENRY TORRESenergy_progress
06/13/2025HVAC-R and service water heating equipmentHENRY TORRESenergy_progress
04/28/2025FinalHENRY TORRESprogress
04/28/2025Mechanical SystemsHENRY TORRESspecial
02/27/2025FinalPhillip Summersprogress
02/27/2025Tenant Protection Plan CompliancePhillip Summersspecial
11/20/2024Energy Code Compliance InspectionsMOLLY GLENNprogress
11/20/2024Exhaust and Vent Systems in Plenums and DuctsMOLLY GLENNspecial
11/20/2024Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
11/20/2024Post-installed AnchorsMOLLY GLENNspecial
11/20/2024HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
11/20/2024HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
Latest 25 of 72.
▾Documents — 499 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/05/2026M00092402-I1Request digital key ↗
09/05/2026M00092403-I1Request digital key ↗
09/03/2026M00595384-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits88
▸BISWORK PERMIT APPLICATION53
08/20/2020140938289Open ↗
10/16/2019123091698Open ↗
08/01/2019123477781Open ↗
Showing 3 of 53 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION35
01/10/2024104019170Open ↗
03/15/2023123477781Open ↗
05/25/2022123587617Open ↗
Showing 3 of 35 on file for this type
▸Seals & Professional Certifications141
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
02/12/2020123091698Open ↗
02/12/2020123091698Open ↗
02/12/2020123091698Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00092402-I1Open ↗
09/03/2026M00595384-I1Open ↗
09/03/2026M00538605-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026M00538605-I1Open ↗
09/01/2026M01187474-S1Open ↗
09/01/2026M00538605-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M00538605-I1Open ↗
09/01/2026M00538605-I1Open ↗
09/01/2026M01187474-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/12/2020140938289Open ↗
01/24/2019140828861Open ↗
01/24/2019140828843Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/12/2020140938289Open ↗
01/24/2019140828861Open ↗
01/24/2019140828843Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
08/12/2020140938289Open ↗
01/24/2019140828861Open ↗
01/24/2019140828843Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE15
04/15/2015122049782Open ↗
12/04/2014122049782Open ↗
Showing 2 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/25/2019123091698Open ↗
10/01/2019123091698Open ↗
05/15/2017123091698Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS4
02/12/2020123091698Open ↗
02/12/2020123091698Open ↗
02/12/2020123091698Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/12/2020123091698Open ↗
02/05/2020123091698Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES6
08/12/2020140938289Open ↗
01/24/2019140828861Open ↗
01/24/2019140828843Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/01/2019123477781Open ↗
08/03/2017123091698Open ↗
▸Environmental & Asbestos41
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/03/2026M00595384-I1Open ↗
09/03/2026M00538605-I1Open ↗
09/01/2026M00595980-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/11/2018123587617Open ↗
05/15/2017123091698Open ↗
10/14/2016122883451Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/26/2019123477781Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01109324-S2Open ↗
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
02/12/2020123091698Open ↗
02/12/2020123091698Open ↗
02/10/2020123091698Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
02/12/2020123091698Open ↗
02/10/2020123091698Open ↗
04/19/2017122883451Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/15/2023123477781Open ↗
05/23/2022123587617Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00595384-I1Open ↗
08/13/2026M00538605-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
05/23/2022123587617Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/15/2023123477781Open ↗
▸BISLIGHTING CONTROLS1
05/23/2022123587617Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY12
01/10/2024104019170Open ↗
01/10/2024104019170Open ↗
06/15/2023123477781Open ↗
Showing 3 of 12 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/23/2022123587617Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/15/2023123477781Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
06/09/2017123091698Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
06/15/2023123477781Open ↗
▸BISMASONRY1
06/15/2023123477781Open ↗
▸Approvals, Objections & Sign-offs35
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
01/11/2024104019170Open ↗
06/23/2023123477781Open ↗
05/24/2022123587617Open ↗
Showing 3 of 16 on file for this type
▸BISFINAL2
06/15/2023123477781Open ↗
05/23/2022123587617Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT31
01/11/2024104019170Open ↗
11/15/2021123477781Open ↗
11/15/2021123477781Open ↗
Showing 3 of 31 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/09/2024104019170Open ↗
06/15/2023123477781Open ↗
05/23/2022123587617Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET19
07/13/2018123477781Open ↗
06/11/2018123587617Open ↗
05/15/2017123091698Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION16
04/04/2023123477781Open ↗
11/22/2021123477781Open ↗
01/24/2020123091698Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/12/2020140938289Open ↗
01/24/2019140828861Open ↗
01/24/2019140828843Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
02/12/2020123091698Open ↗
02/10/2020123091698Open ↗
01/16/2020123091698Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type