← Back
Elevator apt, fireproof with stores
First Houses (NYCHA)
112 EAST 3 STREET · BIN 1077948
💬 Discuss this project
1920Year Built
4Stories
D6Building Class
R8BZoning
101,908 sfGross Floor Area
262Units
LL97 Covered0 Open Violations
Elevator apt, fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 53,562 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneralOther
Roof3p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA1907/08/2026
NEW YORK CITY HOUSING AUTHORITY907/08/2026
N Y C HOUSING AUTHORITY703/22/2026
OWNER OF 126 EAST 3 ST103/22/2026
BELL REALTY103/22/2026
NYCHA CAPITAL PROJECTS PM TEAM1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTANTS1003/21/2026
SUPERSTRUCTURES ENG + ARCH503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAVEN CONSTRUCTION SERVICGeneral Contractor307/08/2026
JAMES MAGRIPLESElectrical203/21/2026
RJ BRUNO INCPlumbing207/08/2026
ADAM'S EUROPEAN CONTRACTINGGeneral Contractor104/09/2026
JEMCO ELECTRICAL CONT INCGeneral Contractor107/08/2026
RICHARDS P AND H CO, INCPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355509/29/2025
JOEL PHAGOO ,PE, PLLC2416202/20/2025
MT GROUP798301/10/2024
Building Lifecycle
All (71)Filed (17)Permit Issued (8)Signed Off (7)Violation (5)Inspection (4)Special Inspection (30)
12/29/2025
Signed off — Alteration
NYCHA 1st Houses Bldg 06, Interior repairs per plans filed, including: Repair of damaged interior ceiling and wall plaster.
M00921335-I1
12/29/2025
Signed off — Alteration
NYCHA 1st Houses Bldg 06, Exterior & Roof repairs per plans filed, including: Removal /replacement/ repairs to roofing system, bulkhead door, masonry, lintels, parapet & roof drains. Install new guard rails.
M00840803-I1
11/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/03/2025
Signed off — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-I1
11/03/2025
Signed off — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-S1
10/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129435-I1
10/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129423-I1
09/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
09/29/2025
Filed — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-P4
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
09/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/26/2025
Permit issued — Plumbing
M01252538-I1-PL
08/26/2025
Permit issued — Boiler Equipment
M01252538-S1-BE
08/18/2025
Permit issued — Plumbing
M00654963-I1-PL
08/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
08/08/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
08/08/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
08/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
08/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
08/07/2025
Filed — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-P1
08/07/2025
Filed — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-P2
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
08/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/06/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
08/06/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
07/30/2025
Filed — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-S1
07/25/2025
Filed — Alteration
GAS PIPE REPLACEMENT FOR EXISTING STEAM BOILER, BOILER PILOT AND HOT WATER BOILER.
M01252538-I1
06/20/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129390-I1
02/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129390-P1
02/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129423-P1
02/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129435-P1
02/19/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
02/06/2025
Permit issued — General Construction
M00921335-I1-GC
01/27/2025
Special inspection requirement — Final
Paul Millman
01/23/2025
Filed — Alteration
NYCHA 1st Houses Bldg 06, Interior repairs per plans filed, including: Repair of damaged interior ceiling and wall plaster.
M00921335-P1
01/22/2025
Special inspection requirement — Final
Paul Millman
01/03/2025
Permit issued — General Construction
M00840803-I1-GC-CX
10/31/2024
Permit issued — Construction Fence
M01129423-I1-FN
10/31/2024
Permit issued — Supported Scaffold
M01129435-I1-SF
10/30/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129435-I1
10/30/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129423-I1
10/28/2024
Permit issued — Sidewalk Shed
M01129390-I1-SH
10/24/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01129390-I1
01/11/2024
Special inspection requirement — Final
CHRISTOPHER BEHLE
01/11/2024
Special inspection requirement — Masonry
CHRISTOPHER BEHLE
01/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTOPHER BEHLE
01/11/2024
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
01/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTOPHER BEHLE
01/11/2024
Special inspection requirement — Structural Wood Frame
CHRISTOPHER BEHLE
01/11/2024
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
01/10/2024
Filed — Alteration
NYCHA 1st Houses Bldg 06, Exterior & Roof repairs per plans filed, including: Removal /replacement/ repairs to roofing system, bulkhead door, masonry, lintels, parapet & roof drains. Install new guard rails.
M00840803-P2
08/22/2023
Filed — Alteration
NYCHA 1st Houses Bldg 06, Exterior & Roof repairs per plans filed, including: Removal /replacement/ repairs to roofing system, bulkhead door, masonry, lintels, parapet & roof drains. Install new guard rails.
M00840803-P1
08/21/2023
Filed — Alteration
NYCHA 1st Houses Bldg 06, Interior repairs per plans filed, including: Repair of damaged interior ceiling and wall plaster.
M00921335-I1
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRJ BRUNO INC08/26/2025
DOB NOWBoiler EquipmentSigned-offRJ BRUNO INC08/26/2025
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC08/18/2025
DOB NOWGeneral ConstructionSigned-offJEMCO ELECTRICAL CONT02/06/2025
DOB NOWGeneral ConstructionSigned-offADAM'S EUROPEAN CONTRACTING01/03/2025
DOB NOWConstruction FenceSigned-offRAVEN CONSTRUCTION SERVIC10/31/2024
DOB NOWSupported ScaffoldSigned-offRAVEN CONSTRUCTION SERVIC10/31/2024
DOB NOWSidewalk ShedSigned-offRAVEN CONSTRUCTION SERVIC10/28/2024
BISFBISSUEDPETER AGLIARDO JR04/08/2002
BISBLISSUEDNORTH EAST CONTRACTING12/12/2001
BISFBISSUEDPETER AGLIARDO JR04/16/2001
BISBLISSUEDNORTH EAST CONTRACTING04/12/2001
1 project · most recent 01/24/2022
Gas
FiledStatusContractorScope
01/24/2022Permit IssuedRICHARDS P AND H CO, INCGas
6 projects · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/07/2025CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/07/2025CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/07/2025CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
10/16/2024CompleteARCADIA ELECT'L CO. INC.General Wiring
06/24/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/30/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
09/30/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/25/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/25/2025Tenant Protection Plan Compliance—special
08/08/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
08/08/2025Maintenance informationSteven Bendoraitisenergy_progress
08/08/2025Heating SystemsABDALLAH ELCHERBINIspecial
08/08/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
08/08/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
08/08/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
08/06/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
08/06/2025Tenant Protection Plan Compliance—special
08/06/2025Heating SystemsABDALLAH ELCHERBINIspecial
08/06/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
08/06/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
08/06/2025Maintenance informationSteven Bendoraitisenergy_progress
02/19/2025Post-installed AnchorsJOEL PHAGOOspecial
01/27/2025FinalPaul Millmanprogress
01/22/2025FinalPaul Millmanprogress
01/11/2024FinalCHRISTOPHER BEHLEprogress
01/11/2024MasonryCHRISTOPHER BEHLEspecial
01/11/2024Tenant Protection Plan ComplianceCHRISTOPHER BEHLEspecial
01/11/2024Post-installed AnchorsCHRISTOPHER BEHLEspecial
01/11/2024Structural Stability – Alterations of existing buildingsCHRISTOPHER BEHLEspecial
01/11/2024Structural Wood FrameCHRISTOPHER BEHLEprogress
Latest 25 of 37.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/03/2026M00654963-I1Request digital key ↗
08/29/2026M00840803-I1Request digital key ↗
08/29/2026M00840803-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit11
08/13/2026M00921335-I1Open ↗
08/13/2026M01252538-I1Open ↗
08/13/2026M01252538-P4Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
04/29/2019123805481Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026M01252538-S1Open ↗
09/23/2026M01252538-S1Open ↗
09/23/2026M01252538-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/29/2026M00840803-I1Open ↗
08/29/2026M00840803-P2Open ↗
08/29/2026M00840803-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01252538-S1Open ↗
09/02/2026M01129435-P1Open ↗
08/25/2026M01252538-P4Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/07/2020123805481Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/29/2019123805481Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026M00840803-I1Open ↗
08/29/2026M00840803-P2Open ↗
08/22/2026M01252538-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/29/2019123805481Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/29/2026M00840803-I1Open ↗
08/29/2026M00840803-P2Open ↗
08/29/2026M00840803-P1Open ↗
Showing 3 of 17 on file for this type
▸BISLANDMARKS APPROVAL1
01/07/2020123805481Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/29/2019123805481Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/07/2020123805481Open ↗
▸BISEFILING COVER SHEET1
04/29/2019123805481Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/07/2020123805481Open ↗
04/29/2019123805481Open ↗