← Back
Office only, 7-19 stories
112 EAST 64 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1042123
💬 Discuss this project
1960Year Built
7Stories
O3Building Class
R8BZoning
19,650 sfGross Floor Area
1Units
0 Open ViolationsFISP: SWARMP
Office only, 7-19 stories · Owner of record: RUSSELL SAGE FOUNDATION · 3,514 sf lot · 5.59 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof18p · 2 filings · 19 docs
Floor 625p · 4 filings · 20 docs
Floor 529p · 6 filings · 20 docs
Floor 426p · 4 filings · 20 docs
Floor 322p · 4 filings · 20 docs
Floor 225p · 4 filings · 20 docs
Floor 112p · 2 filings · 18 docs
Mezzanine10p · 1 filing · 12 docs
Cellar20p · 3 filings · 20 docs
Site & exterior2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUSSELL SAGE FOUNDATION3507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THORNTON TOMASETTI103/06/2025
PLAN B ARCHITECTS P.C.209/21/2023
BENDIX ENGINEERING, P.C.104/27/2022
SOCOTEC, INC.104/27/2022
STANTEC207/20/2021
EDWARDS AND ZUCK208/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRAMEWORK CONSULTANTS203/21/2026
RIZZO GROUP403/21/2026
EXPEDITION NYC203/21/2026
ANDRA CONSTANTIN EXPEDITER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOLT CONSTRUCTION CORPGeneral Contractor507/08/2026
PRAT ENTERPRISES CORPGeneral Contractor207/08/2026
LAWRENCE J. LEVINEFire Protection203/21/2026
LAB PLBG & HTG CO INCPlumbing107/08/2026
PAUL BOCCIAElectrical103/21/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
DONNELLY MECHANICAL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423109/21/2023
BENDIX ENGINEERING, P.C.4293104/27/2022
SOCOTEC ENGINEERING4983104/27/2022
SKYLINE ENGINEERING, PLLC267207/20/2021
MEP INSPECTIONS, INC1102208/05/2019
Building Lifecycle
All (93)Filed (9)Permit Issued (10)Signed Off (6)Facade (FISP) (15)Violation (16)Inspection (2)Objection (14)Special Inspection (21)
08/21/2026
Signed off — Alteration
M01172476-I1
04/13/2026
Permit issued — General Construction
M01172476-I1-GC
09/19/2025
Signed off — Alteration
Replace existing cooling tower with new condensers. New refrigerant piping to be installed in the existing shaft from roof to cellar. Install new duct list and ducted air handling units on all floors. No change to use, egress or occupancy.
M00676391-I1
04/15/2025
Permit issued — General Construction
M01172476-I1-GC
03/06/2025
Filed — Alteration
M01172476-I1
05/01/2024
Signed off — Alteration
IT IS PROPOSED TO INSTALL RAILING AT THE ROOF LEVEL; ROOF REPAIRS AS NECESSITATED AS PER PLANS. NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION
M00924315-I1
04/26/2024
Permit issued — General Construction
M00696190-I1-GC
03/26/2024
Permit issued — General Construction
M00924315-I1-GC
09/25/2023
Objection raised — Scope
09/25/2023
Objection resolved — Addressed
09/25/2023
Objection raised — Admin
09/25/2023
Objection resolved — Addressed
09/21/2023
Filed — Alteration
IT IS PROPOSED TO INSTALL RAILING AT THE ROOF LEVEL; ROOF REPAIRS AS NECESSITATED AS PER PLANS. NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION
M00924315-I1
09/08/2023
Special inspection requirement — Post-installed Anchors
Young Suh
08/24/2023
Special inspection requirement — Final
MATTHEW BROWER
06/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/30/2022
Cycle 9 facade report submitted
08/30/2022
Cycle 9 facade report signed — SWARMP
08/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2022
Cycle 9 facade inspection completed
07/07/2022
Permit issued — Plumbing
M00679365-I1-PL
07/06/2022
Permit issued — General Construction
M00696190-I1-GC
07/06/2022
Permit issued — Mechanical Systems
M00676391-I1-MS
06/03/2022
Objection raised — Zoning
06/03/2022
Objection resolved — Addressed
06/03/2022
Objection raised — Scope
06/03/2022
Objection resolved — Addressed
06/03/2022
Objection raised — Scope
06/03/2022
Objection resolved — Addressed
06/01/2022
Filed — Alteration
GENERAL CONSTRUCTION INCLUDING CEILING AND LIGHTING REPLACEMENT; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00696190-I1
05/01/2022
Objection raised — Other
05/01/2022
Objection resolved — Addressed
05/01/2022
Objection raised — Scope
05/01/2022
Objection resolved — Addressed
04/27/2022
Filed — Alteration
Replace existing cooling tower with new condensers. New refrigerant piping to be installed in the existing shaft from roof to cellar. Install new duct list and ducted air handling units on all floors. No change to use, egress or occupancy.
M00676391-I1
04/27/2022
Filed — Alteration
Install new plumbing drains at pantry sink on alcove on each floor. No change to use, egress or occupancy.
M00679365-I1
04/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — Ventilation and air distribution system
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
04/26/2022
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
02/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
02/08/2022
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
02/08/2022
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
10/12/2021
Signed off — Alteration
Install NEW Fixtures: (3) WC, (2) urinals, (4) lavs, (1) HWH and associated piping on the Cellar Level; Install (1) lavatory, (1) urinal, (1) WC and (1) HWH and associated piping on the 2-6th Floors as per plans. No change to use, egress or occupancy.
M00452539-I1
07/20/2021
Filed — Alteration
Install NEW Fixtures: (3) WC, (2) urinals, (4) lavs, (1) HWH and associated piping on the Cellar Level; Install (1) lavatory, (1) urinal, (1) WC and (1) HWH and associated piping on the 2-6th Floors as per plans. No change to use, egress or occupancy.
M00452539-P1
06/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
01/28/2021
Permit issued — Plumbing
M00452539-I1-PL
01/22/2021
Filed — Alteration
Install NEW Fixtures: (3) WC, (2) urinals, (4) lavs, (1) HWH and associated piping on the Cellar Level; Install (1) lavatory, (1) urinal, (1) WC and (1) HWH and associated piping on the 2-6th Floors as per plans. No change to use, egress or occupancy.
M00452539-I1
04/28/2020
Signed off — Alteration
Modifications to the existing Sprinkler System as per plans (Russel Sage Foundation.) No change to use, egress or occupancy.
M00194343-I1
04/28/2020
Signed off — Alteration
Modifications to the existing HVAC system, Install new branch duct and air outlets as per plans (Russel Sage Foundation.) No change to use, egress or occupancy.
M00194108-I1
10/16/2019
Permit issued — Mechanical Systems
M00194108-I1-MS
08/15/2019
Permit issued — Sprinklers
M00194343-I1-EW-SP
08/14/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/05/2019
Filed — Alteration
Modifications to the existing Sprinkler System as per plans (Russel Sage Foundation.) No change to use, egress or occupancy.
M00194343-I1
08/05/2019
Filed — Alteration
Modifications to the existing HVAC system, Install new branch duct and air outlets as per plans (Russel Sage Foundation.) No change to use, egress or occupancy.
M00194108-I1
07/16/2019
Special inspection requirement — HVAC and service water heating system controls
Nicolas Crosetto
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP04/13/2026
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP04/15/2025
DOB NOWGeneral ConstructionPermit IssuedHOLT CONSTRUCTION CORP04/26/2024
DOB NOWGeneral ConstructionSigned-offDONNELLY MECHANICAL CORP03/26/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC07/07/2022
DOB NOWGeneral ConstructionPermit IssuedHOLT CONSTRUCTION CORP07/06/2022
DOB NOWMechanical SystemsSigned-offHOLT CONSTRUCTION CORP07/06/2022
DOB NOWPlumbingSigned-offLAB PLBG & HTG CO INC01/28/2021
DOB NOWMechanical SystemsSigned-offHOLT CONSTRUCTION CORP10/16/2019
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE08/15/2019
BISOTISSUEDHOLT CONSTRUCTION CORP02/22/2021
BISOTISSUEDHOLT CONSTRUCTION CORP12/17/2020
BISSPISSUEDSIRINA FIRE PROT CORP07/16/2015
BISMHISSUEDHOLT CONSTRUCTION CORP06/19/2015
BISOTISSUEDHOLT CONSTRUCTION CORP06/19/2015
BISOTISSUEDVMMA CONSTRUCTION LLC12/10/2012
BISOTISSUEDVMMA CONSTRUCTION LLC08/20/2012
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/09/2002
BISOTISSUEDA.W. & S. CONSTRUCTION CO07/11/2002
BISSPISSUEDASCO SPRINKLER CO.,INC07/10/2002
BISOTISSUEDA.W. & S. CONSTRUCTION CO03/25/2002
BISOTISSUEDPROGRESSIVE CONTRUCTION ,INC.07/17/1996
BISMHISSUEDJOHNSON CONTROLS INC03/02/1993
1 project · most recent 04/27/2022
Water/Sanitary
FiledStatusContractorScope
04/27/2022Signed-offPAR PLUMBING CO., INCWater/Sanitary
6 projects · most recent 05/07/2024
General Wiring Lighting
FiledStatusContractorScope
05/07/2024CompleteBIGMAN BROS., INC.General Wiring
07/13/2022Permit IssuedBIGMAN BROS., INC.General Wiring, Lighting
04/28/2021CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
11/18/2020CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
05/13/2020CompleteP.S. MARCATO ELEV. CO INC—
08/07/2019CompleteVERDE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
09/08/2023Post-installed AnchorsYoung Suhspecial
08/24/2023FinalMATTHEW BROWERprogress
04/26/2022HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/26/2022Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
04/26/2022Shutoff dampersALEXIS SCHLESSINGERMANenergy_progress
04/26/2022Ventilation and air distribution systemALEXIS SCHLESSINGERMANenergy_progress
04/26/2022HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/26/2022Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
04/26/2022HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/26/2022Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
02/11/2022Fire-Resistant Penetrations and JointsMatthew Bendixspecial
02/08/2022Mechanical SystemsALEXIS SCHLESSINGERMANspecial
02/08/2022FinalALEXIS SCHLESSINGERMANprogress
06/25/2021Fire-Resistant Penetrations and JointsMatthew Wavrospecial
07/16/2019HVAC and service water heating system controls Nicolas Crosettoenergy_progress
07/16/2019Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/16/2019Mechanical SystemsNicolas Crosettospecial
07/16/2019Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/16/2019FinalNicolas Crosettoprogress
07/16/2019HVAC insulation and sealing Nicolas Crosettoenergy_progress
07/16/2019Sprinkler SystemsNicolas Crosettospecial
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
09/02/2026M00676391-I1Request digital key ↗
08/24/2026M01172476-I1Request digital key ↗
08/15/2026M00679365-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00452539-I1Request digital key ↗
08/15/2026M00452539-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00194343-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00194108-I1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION13
02/22/2021140984898Open ↗
02/19/2021140984898Open ↗
02/12/2021140984898Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLPC Approval/Permit8
09/03/2026M00452539-I1Open ↗
09/02/2026M00676391-I1Open ↗
08/13/2026M01172476-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
11/30/2020140984898Open ↗
08/01/2019123710902Open ↗
07/06/2015122436159Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
11/07/2019123710902Open ↗
11/07/2019123710902Open ↗
08/01/2019123710902Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00194343-I1Open ↗
09/03/2026M00452539-I1Open ↗
09/02/2026M00676391-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026M00194108-I1Open ↗
08/28/2026M00194108-I1Open ↗
08/28/2026M00194108-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M00452539-P1Open ↗
08/30/2026M00679365-I1Open ↗
08/28/2026M00194108-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/30/2020140984898Open ↗
08/01/2019123710902Open ↗
07/06/2015122436159Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/01/2019123710902Open ↗
07/06/2015122436159Open ↗
07/01/2015122436168Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/30/2020140984898Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/30/2020140984898Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
10/13/2015122436168Open ↗
08/20/2015122436168Open ↗
▸BISEQUIPMENT USE PERMITS1
08/25/2012121127565Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/13/2015122436168Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/01/2015122436168Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00194343-I1Open ↗
09/03/2026M00452539-I1Open ↗
09/02/2026M00676391-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/30/2020140984898Open ↗
08/01/2019123710902Open ↗
07/06/2015122436159Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/07/2019123710902Open ↗
08/01/2019123710902Open ↗
08/01/2019123710902Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/08/2021140984898Open ↗
11/07/2019123710902Open ↗
01/19/2016122436159Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/03/2021140984898Open ↗
11/30/2020140984898Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/30/2020140984898Open ↗
▸BISINTERIOR LIGHTING POWER1
12/01/2020140984898Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/01/2020140984898Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00676391-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/03/2021140984898Open ↗
11/30/2020140984898Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/01/2020140984898Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/08/2021140984898Open ↗
11/07/2019123710902Open ↗
04/01/2016122436168Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL5
11/30/2020140984898Open ↗
11/07/2019123710902Open ↗
04/01/2016122436168Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/02/2026M00676391-I1Open ↗
08/24/2026M01172476-I1Open ↗
08/13/2026M00696190-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/05/2020140984898Open ↗
▸BISFINAL1
12/01/2020140984898Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
08/03/2021140984898Open ↗
11/30/2020140984898Open ↗
11/07/2019123710902Open ↗
Showing 3 of 12 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
12/07/2020140984898Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
08/01/2019123710902Open ↗
07/06/2015122436159Open ↗
07/06/2015122436159Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
02/22/2021140984898Open ↗
02/19/2021140984898Open ↗
02/12/2021140984898Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/30/2020140984898Open ↗
▸Other Documents4
▸DOB NOWWaiver Document2
09/02/2026M00676391-I1Open ↗
08/13/2026M00696190-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/22/2021140984898Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01172476-I1Open ↗