112 MALCOLM X BOULEVARD
BROOKLYN · BIN 3044327
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6BZoning
2,599 sfGross Floor Area
6Units
Rent Stabilized198 Open Violations 196 unresolved · 2 paperwork only ▸
Five to six families · Owner of record: MALCOLM X BH MAZAL LLC · 1,925 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Architecture
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIZE CONSTRUCTION403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2024$1.0M—— → —$391/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CARUSONE & CHERRES ARCHITECTS, LLC806/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AB WORKS PROCESSING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST ZRK SERVICES INCGeneral Contractor807/08/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
WINSTON CUMMINSElectrical103/21/2026
RIZE CONSTRUCTION LLCGeneral Contractor107/08/2026
TJAR GROUP CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CARUSONE & CHERRES ARCHIT6166706/05/2026
Building Lifecycle
All (154)Filed (8)Permit Issued (8)Signed Off (3)Violation (60)Inspection (11)Objection (34)Special Inspection (30)
07/13/2026
Signed off — Alteration CO
PROPOSED CONVERSION OF EXIST'G 6-FAM INTO A 2-FAM DWELLING OF AN EXIST'G 2-STY, BSMT & CEL BRICK BLDG. AS PER PLANS. RELATED PL & MS WORK SUBSEQUENTLY FILED UNDER B01076333-S2 & S3. INTERIOR DEMO FILED UNDER B010238. RESOLVE ECB# 35416107R FACADE REPAIR.
B01076333-S2
07/07/2026
Special inspection requirement — Masonry
JORGE CHERRES
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
07/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JORGE CHERRES
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JORGE CHERRES
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
JORGE CHERRES
07/07/2026
Special inspection requirement — Air barrier - visual inspection
JORGE CHERRES
07/07/2026
Special inspection requirement — Air barrier — testing
JORGE CHERRES
07/07/2026
Special inspection requirement — Insulation placement and R values
JORGE CHERRES
07/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JORGE CHERRES
07/07/2026
Special inspection requirement — Fenestration areas
JORGE CHERRES
07/07/2026
Special inspection requirement — Interior lighting power
JORGE CHERRES
07/07/2026
Special inspection requirement — Permanent certificate
JORGE CHERRES
07/07/2026
Special inspection requirement — Metering
JORGE CHERRES
07/07/2026
Special inspection requirement — Fenestration air leakage
JORGE CHERRES
06/30/2026
Objection raised — Cost
06/30/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Energy
06/05/2026
Filed — Alteration CO
PROPOSED CONVERSION OF EXIST'G 6-FAM INTO A 2-FAM DWELLING OF AN EXIST'G 2-STY, BSMT & CEL BRICK BLDG. AS PER PLANS. RELATED PL & MS WORK SUBSEQUENTLY FILED UNDER B01076333-S2 & S3. INTERIOR DEMO FILED UNDER B010238. RESOLVE ECB# 35416107R FACADE REPAIR.
B01076333-P3
05/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Violation issued (HPD, open)
A
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/27/2026
Special inspection requirement — Air barrier — testing
JORGE CHERRES
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
04/27/2026
Special inspection requirement — Masonry
JORGE CHERRES
04/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JORGE CHERRES
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
JORGE CHERRES
04/27/2026
Special inspection requirement — Air barrier - visual inspection
JORGE CHERRES
04/27/2026
Special inspection requirement — Fenestration areas
JORGE CHERRES
04/27/2026
Special inspection requirement — Insulation placement and R values
JORGE CHERRES
04/27/2026
Special inspection requirement — Permanent certificate
JORGE CHERRES
04/27/2026
Special inspection requirement — Interior lighting power
JORGE CHERRES
04/27/2026
Special inspection requirement — Fenestration air leakage
JORGE CHERRES
04/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JORGE CHERRES
04/27/2026
Special inspection requirement — Metering
JORGE CHERRES
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JORGE CHERRES
04/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Signed off — Alteration
PROPOSED INTERIOR NON-STRUCTURAL DEMOLITION FOR EXISTING 2-STY, BSMT & CELLAR BRICK BUILDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01023890-I1
04/15/2026
Signed off — Alteration
PROPOSED CONSTRUCTION PLYWOOD FENCE @ 112 MALCOM X BLVD. AS PER PLAN
B01026559-I1
03/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/18/2026
Permit issued — Plumbing
B01076333-S2-PL
01/25/2026
Permit issued — General Construction
B01076333-I1-GC
01/07/2026
Permit issued — Construction Fence
B01026559-I1-FN
12/11/2025
Filed — Alteration CO
PROPOSED CONVERSION OF EXIST'G 6-FAM INTO A 2-FAM DWELLING OF AN EXIST'G 2-STY, BSMT & CEL BRICK BLDG. AS PER PLANS. RELATED PL & MS WORK SUBSEQUENTLY FILED UNDER B01076333-S2 & S3. INTERIOR DEMO FILED UNDER B010238. RESOLVE ECB# 35416107R FACADE REPAIR.
B01076333-P2
11/25/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/20/2025
Violation issued (HPD, open)
I
11/20/2025
Objection raised — Admin
11/20/2025
Objection raised — Admin
11/20/2025
Objection raised — Cost
11/20/2025
Objection raised — Other
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedTJAR GROUP CORP01/25/2026
DOB NOWConstruction FenceSigned-offBEST ZRK SERVICES INC01/07/2026
DOB NOWConstruction FenceSigned-offBEST ZRK SERVICES INC06/26/2025
DOB NOWGeneral ConstructionPermit IssuedRIZE CONSTRUCTION LLC06/23/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC11/14/2024
DOB NOWGeneral ConstructionSigned-offBEST ZRK SERVICES INC04/15/2024
DOB NOWConstruction FenceSigned-offBEST ZRK SERVICES INC04/12/2024
BISOTISSUEDG.M. CONSTRUCTION & HOME06/09/2009
1 project · most recent 06/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/05/2026Signed-offALL PRO PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
07/07/2026MasonryJORGE CHERRESspecial
07/07/2026Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
07/07/2026Exterior Insulation and Finish Systems (EIFS)JORGE CHERRESspecial
07/07/2026Structural Stability – Alterations of existing buildingsJORGE CHERRESspecial
07/07/2026Energy Code Compliance InspectionsJORGE CHERRESprogress
07/07/2026Fire-Resistance Rated ConstructionJORGE CHERRESprogress
07/07/2026Air barrier - visual inspectionJORGE CHERRESenergy_progress
07/07/2026Air barrier — testing JORGE CHERRESenergy_progress
07/07/2026Insulation placement and R valuesJORGE CHERRESenergy_progress
07/07/2026Fenestration and door U-factor and product ratingsJORGE CHERRESenergy_progress
07/07/2026Fenestration areasJORGE CHERRESenergy_progress
07/07/2026Interior lighting powerJORGE CHERRESenergy_progress
07/07/2026Permanent certificateJORGE CHERRESenergy_progress
07/07/2026MeteringJORGE CHERRESenergy_progress
07/07/2026Fenestration air leakageJORGE CHERRESenergy_progress
04/27/2026Air barrier — testing JORGE CHERRESenergy_progress
04/27/2026Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
04/27/2026MasonryJORGE CHERRESspecial
04/27/2026Structural Stability – Alterations of existing buildingsJORGE CHERRESspecial
04/27/2026Energy Code Compliance InspectionsJORGE CHERRESprogress
04/27/2026Fire-Resistance Rated ConstructionJORGE CHERRESprogress
04/27/2026Air barrier - visual inspectionJORGE CHERRESenergy_progress
04/27/2026Fenestration areasJORGE CHERRESenergy_progress
04/27/2026Insulation placement and R valuesJORGE CHERRESenergy_progress
04/27/2026Permanent certificateJORGE CHERRESenergy_progress
Latest 25 of 55.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026B01026559-I1Request digital key ↗
08/25/2026B01023890-I1Request digital key ↗
08/25/2026B01023890-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/11/2009320019911Open ↗
▸BISWORK PERMIT APPLICATION1
06/09/2009320019911Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWRestrictive Declaration/Easement 25
08/14/2026B01076333-P3Open ↗
08/13/2026B01076333-I1Open ↗
08/13/2026B01076333-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 15
08/14/2026B01076333-P3Open ↗
08/13/2026B01076333-P1Open ↗
08/13/2026B01076333-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01076333-I1Open ↗
08/13/2026B01076333-P1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B01023890-P1Open ↗
08/31/2026B01023890-I1Open ↗
08/27/2026B01076333-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01023890-P1Open ↗
08/31/2026B01023890-I1Open ↗
08/27/2026B01076333-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026B01023890-I1Open ↗
08/16/2026B01076333-P3Open ↗
08/16/2026B01076333-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/05/2009320019911Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
05/11/2009320019911Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/11/2009320019911Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026B01023890-I1Open ↗
08/16/2026B01076333-P2Open ↗
08/16/2026B01076333-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/11/2009320019911Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/11/2009320019911Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/11/2009320019911Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/11/2009320019911Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/16/2026B01076333-I1Open ↗
08/16/2026B01076333-P1Open ↗
08/14/2026B01076333-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01076333-I1Open ↗