1925Year Built
2Stories
C0Building Class
R6BZoning
1,980 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 2,325 sf lot · 0.85 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Roof1p · 2 filings · 6 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
112 OAK103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2022$3.8M—— → —$1,932/sf building
05/04/2020$3.1M—Private party → 112 OAK LLC$1,591/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN309/11/2023
S M TAM ARCHITECT, PLLC208/19/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRITZMARTIN ELECTRIC INC.Electrical203/22/2026
ROSE & STONE CONSTRUCTIONGeneral Contractor207/08/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616309/11/2023
Building Lifecycle
All (34)Filed (5)Permit Issued (4)Signed Off (3)Violation (1)Inspection (4)Objection (6)Special Inspection (11)
06/05/2024
Signed off — Alteration
Minor interior renovation within an existing two stories and basement two family dwelling unit. (front house). remodel kitchen and new metal deck at first floor and renovate bathroom at second floor. No change in use egress or occupancy.
B00857883-I1
06/04/2024
Signed off — Alteration
Installation of new mini split HVAC system, with rooftop Condensing units . filed in conjunction with ALT II application #B00857833-I1 No change in use egress or occupancy.
B00923627-I1
05/29/2024
Signed off — Alteration
Replace/relocate gas fired equipment and install new plumbing fixtures as per plans. for the existing two family dwelling. Filed in conjunction with ALT II application #B00857883-I1.
B00897372-I1
05/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/02/2024
Permit issued — Plumbing
B00897372-I1-PL
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2023
Permit issued — Mechanical Systems
B00923627-I1-GC-CX
09/11/2023
Filed — Alteration
Installation of new mini split HVAC system, with rooftop Condensing units . filed in conjunction with ALT II application #B00857833-I1 No change in use egress or occupancy.
B00923627-I1
08/23/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
08/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/23/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
08/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/04/2023
Permit issued — Plumbing
B00897372-I1-PL
08/02/2023
Filed — Alteration
Replace/relocate gas fired equipment and install new plumbing fixtures as per plans. for the existing two family dwelling. Filed in conjunction with ALT II application #B00857883-I1.
B00897372-I1
06/29/2023
Violation issued (FDNY_NOV, closed)
06/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/28/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
06/28/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/26/2023
Permit issued — General Construction
B00857883-I1-GC-CX
05/31/2023
Objection resolved — Addressed
05/22/2023
Objection resolved — Addressed
05/20/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Scope
05/19/2023
Objection raised — Scope
05/19/2023
Objection raised — Scope
05/16/2023
Filed — Alteration
Minor interior renovation within an existing two stories and basement two family dwelling unit. (front house). remodel kitchen and new metal deck at first floor and renovate bathroom at second floor. No change in use egress or occupancy.
B00857883-I1
08/19/2021
Filed — Alteration
B00575941-I1
08/04/2021
Filed — Alteration
B00554851-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/02/2024
DOB NOWMechanical SystemsSigned-offROSE & STONE CONSTRUCTION09/21/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS08/04/2023
DOB NOWGeneral ConstructionSigned-offROSE & STONE CONSTRUCTION06/26/2023
1 project · most recent 07/10/2024
General Wiring
FiledStatusContractorScope
07/10/2024Permit IssuedFRITZMARTIN ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/23/2023Maintenance informationFAHAD FATEHenergy_progress
08/23/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/23/2023Shutoff dampersFAHAD FATEHenergy_progress
08/23/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/23/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/28/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/28/2023Maintenance informationFAHAD FATEHenergy_progress
06/28/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/28/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/28/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/28/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00554851-I1Request digital key ↗
09/01/2026B00575941-I1Request digital key ↗
08/27/2026B00857883-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00554851-I1Open ↗
09/01/2026B00575941-I1Open ↗
08/27/2026B00857883-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B00897372-I1Open ↗
09/02/2026B00897372-I1Open ↗
08/22/2026B00923627-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00897372-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00554851-I1Open ↗
09/01/2026B00575941-I1Open ↗
08/27/2026B00857883-I1Open ↗
Showing 3 of 5 on file for this type