HPD03/18/2025§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD03/18/2025§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD03/18/2025§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD03/18/2025§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Two family converted from one family · 3,750 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.