← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Gallery Condominium
112 WEST 72 STREET · Upper West Side-Lincoln Square · BIN 1076234
💬 Discuss this project
1907Year Built
13Stories
RMBuilding Class
C4-6AZoning
38,936 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized31 Open Violations 30 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,876 sf lot · 7.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeCivilGeneralOther
Roof1p · 1 filing · 4 docs
Floor 712p · 1 filing · 20 docs
Floor 6
Floor 56p · 2 filings · 9 docs
Floor 46p · 2 filings · 9 docs
Floor 36p · 2 filings · 9 docs
Floor 26p · 2 filings · 9 docs
Floor 162p · 3 filings · 20 docs
Cellar54p · 4 filings · 20 docs
Site & exterior34p · 2 filings · 20 docs
Filed — no permit issued6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.6707/08/2026
XINOS CONSTRUCTION2307/08/2026
GALLERY APARTMENTS CO.,L.P.403/21/2026
C O AKAM ASSOCIATES403/21/2026
GALERY403/21/2026
SACKMAN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HALO ARCHITECTURE PLLC404/07/2026
DEAN MENDEZ RA511/22/2024
R.J. MCGEE ENGINEERING, PLLC205/08/2024
QUEENS ENGINEERING104/05/2024
JOSE L. PENA,P.E.207/14/2023
KUSHNER STUDIOS606/12/2023
ROBERT GERMAIN JR. PE1103/29/2023
NY RESTORATION TECHNOLOGY CORP102/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR403/21/2026
XINOS CONSTRUCTION1403/21/2026
KUSHNER STUDIOS803/21/2026
MODERN BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1807/08/2026
CPJR IMPROVEMENT CORPGeneral Contractor407/08/2026
CC CONTROLLED PLBG CO.,INPlumbing307/08/2026
CAMILO SERNA INTERIORS COGeneral Contractor303/21/2026
ALL PRO PLBG & HTG INCPlumbing306/28/2026
CITY SIGNSScaffold207/08/2026
STAKE MANAGEMENT LLCGeneral Contractor204/09/2026
CJ HEATING & MECHANICAL CPlumbing207/08/2026
JERRY SANTANGELOElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
C C CONTROLLED COMBUSTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HALO ARCHITECTURE PLLC8021404/07/2026
CROSSCHECK INSPECTION SER544405/08/2024
ROBERT F. GERMAIN JR. PE51001103/29/2023
BUILDING CONSULTING ENGIN1034102/22/2023
NY RESTORATION TECHNOLOGY6187102/22/2023
Building Lifecycle
All (164)Filed (33)Permit Issued (30)Signed Off (11)Facade (FISP) (19)Violation (51)Inspection (9)Objection (11)
08/20/2026
Signed off — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with 2014 building codes, chapter 33.No changes in use, egress or occupancy.
M00774155-S1
08/20/2026
Signed off — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with 2014 building codes, chapter 33.No changes in use, egress or occupancy.
M00774155-I1
07/01/2026
Cycle 9 facade report signed — SAFE
06/23/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
A
06/09/2026
Permit issued — Sidewalk Shed
M00774155-I1-SH
06/01/2026
Cycle 9 facade report submitted
05/22/2026
Cycle 9 facade inspection completed
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
C
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, open)
A
05/20/2026
Violation issued (HPD, open)
B
04/07/2026
Filed — Alteration
Propose interior renovation @ partial 7th floor Apt#7BC with partition and finish work as per plan. No change in use, egress, or occupancy.
M01225260-P1
04/07/2026
Filed — Alteration
Propose interior renovation @ partial 7th floor Apt#7BC with partition and finish work as per plan. No change in use, egress, or occupancy.
M01225260-P2
03/11/2026
Violation issued (HPD, open)
A
03/11/2026
Violation issued (HPD, open)
A
03/11/2026
Violation issued (HPD, open)
C
03/11/2026
Violation issued (HPD, open)
A
02/18/2026
Permit issued — Sidewalk Shed
M00774155-I1-SH
01/27/2026
Permit issued — General Construction
M01225260-I1-GC
12/29/2025
Cycle 9 facade report submitted
12/29/2025
Cycle 9 facade report signed — UNSAFE
12/08/2025
Cycle 9 facade inspection completed
09/08/2025
Violation issued (HPD, open)
C
09/08/2025
Violation issued (HPD, open)
C
09/04/2025
Permit issued — Supported Scaffold
M00774155-S1-SF
09/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2025
Permit issued — Plumbing
M01225260-S1-PL
07/01/2025
Permit issued — General Construction
M01225260-I1-GC
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/09/2025
Objection raised — Scope
06/09/2025
Objection raised — Admin
06/09/2025
Objection raised — Cost
06/09/2025
Objection raised — Scope
06/06/2025
Permit issued — Suspended Scaffold
M01024722-I1-SC
06/06/2025
Permit issued — General Construction
M07999445-I1-GC
05/22/2025
Filed — Alteration
Propose interior renovation @ partial 7th floor Apt#7BC with partition and finish work as per plan. No change in use, egress, or occupancy.
M01225260-S1
05/22/2025
Filed — Alteration
Propose interior renovation @ partial 7th floor Apt#7BC with partition and finish work as per plan. No change in use, egress, or occupancy.
M01225260-I1
05/07/2025
Signed off — Alteration
INSTALLATION OF NEW SPLIT HVAC SYSTEMS AND ASSOCIATED DUCTWORK AS PER THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
M00661010-S5
04/22/2025
Signed off — Alteration
INSTALLATION OF NEW SPLIT HVAC SYSTEMS AND ASSOCIATED DUCTWORK AS PER THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
M00661010-I1
02/20/2025
Permit issued — Sidewalk Shed
M00774155-I1-SH
11/22/2024
Filed — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with 2014 building codes, chapter 33.No changes in use, egress or occupancy.
M00774155-P3
08/08/2024
Permit issued — Supported Scaffold
M00774155-S1-SF
05/30/2024
Permit issued — General Construction
M07999445-I1-GC
05/24/2024
Permit issued — General Construction
M07999445-I1-GC
05/08/2024
Filed — Alteration
INSTALLATION OF NEW SPLIT HVAC SYSTEMS AND ASSOCIATED DUCTWORK AS PER THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
M00661010-P5
04/29/2024
Filed — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with 2014 building codes, chapter 33.No changes in use, egress or occupancy.
M00774155-P2
04/24/2024
Filed — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with 2014 building codes, chapter 33.No changes in use, egress or occupancy.
M00774155-P1
04/15/2024
Permit issued — Suspended Scaffold
M01024722-I1-SC
04/05/2024
Filed — Alteration
Outriggers system installation for inspection of facade and repairs.
M01024722-I1
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP06/09/2026
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/18/2026
DOB NOWGeneral ConstructionPermit IssuedSTAKE MANAGEMENT LLC01/27/2026
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP09/04/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/08/2025
DOB NOWGeneral ConstructionPermit IssuedSTAKE MANAGEMENT LLC07/01/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP06/06/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP06/06/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/20/2025
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP08/08/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/30/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/24/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP04/15/2024
DOB NOWMechanical SystemsSigned-offCAMILO SERNA INTERIORS CO03/20/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/21/2024
DOB NOWSignSigned-offELMER DAWSON07/19/2023
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP07/11/2023
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/18/2023
DOB NOWBoiler EquipmentSigned-offCC CONTROLLED PLBG CO.,IN02/02/2023
DOB NOWSignSigned-offELMER DAWSON12/22/2022
DOB NOWGeneral ConstructionSigned-offCPJR IMPROVEMENT CORP12/16/2022
DOB NOWGeneral ConstructionSigned-offCPJR IMPROVEMENT CORP12/16/2022
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP08/15/2022
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP08/10/2022
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN07/25/2022
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C06/10/2022
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C04/22/2022
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN02/14/2022
DOB NOWBoiler EquipmentSigned-offC C CONTROLLED COMBUSTION02/14/2022
DOB NOWGeneral ConstructionSigned-offC C CONTROLLED COMBUSTION02/14/2022
BIS—ISSUEDBERKLEY GENERAL CONTRACTO10/04/2017
BIS—ISSUEDBERKLEY GENERAL CONTRACTO10/19/2016
BISEQISSUEDROCK GROUP NY CORP04/07/2015
BISEQISSUEDROCK GROUP NY CORP03/30/2015
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT12/31/2014
BISEQISSUEDROCK GROUP NY CORP04/02/2014
BISEQISSUEDROCK GROUP NY CORP03/31/2014
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT01/03/2014
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT07/15/2013
BISEQISSUEDROCK GROUP NY CORP04/16/2013
+ 25 more permits on file
1 project · most recent 04/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/07/2026Signed-offALL PRO PLBG & HTG INCGas, Water/Sanitary
5 projects · most recent 08/12/2025
General Wiring Boiler Controls
FiledStatusContractorScope
08/12/2025Permit IssuedJEM ELEC'L CONTR. CORPGeneral Wiring
06/10/2025Permit IssuedTOWER ELECTRIC INC.—
01/11/2023Permit IssuedKRAFT ELECTRIC CORPBoiler Controls
12/20/2021Permit IssuedKRAFT ELECTRIC CORP—
06/25/2019CompleteGOTHAM WIRING LICENSEDGeneral Wiring
1 project · most recent 11/22/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/22/2024Signed-offXINOS CONSTRUCTION CORPScaffold, Sidewalk Shed
1 project · most recent 04/05/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/05/2024Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/08/2023Fail-Final Boiler Equipment InspectionFailView ↗
01/09/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
05/11/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
04/29/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
04/29/2026FinalHanli Liuprogress
04/29/2026Energy Code Compliance InspectionsHanli Liuprogress
04/29/2026Interior lighting powerHanli Liuenergy_progress
04/02/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
05/01/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/01/2024Mechanical SystemsEUGENE BIFULCOspecial
05/01/2024FinalEUGENE BIFULCOprogress
06/26/2023FinalEUGENE BIFULCOprogress
05/11/2023FinalEUGENE BIFULCOprogress
03/30/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/12/2023Tenant Protection Plan ComplianceRobert Germain Jr.special
01/11/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/11/2023Maintenance informationRobert Germain Jr.energy_progress
01/11/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
01/11/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
01/11/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
01/11/2023Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
01/03/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
12/19/2022FinalEUGENE BIFULCOprogress
12/18/2022FinalJose Penaprogress
12/09/2022HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
12/09/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/09/2022HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
Latest 25 of 42.
▾Documents — 409 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
09/02/2026M00657622-I1Request digital key ↗
09/02/2026M00657622-P1Request digital key ↗
09/02/2026M00657622-P2Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION49
01/16/2025124040279Open ↗
05/06/2024124040279Open ↗
08/24/2023122827888Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION19
10/10/2017122827888Open ↗
10/24/2016122827888Open ↗
04/22/2015121023695Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWLPC Approval/Permit15
08/13/2026M08047130-I1Open ↗
08/13/2026M01225260-S1Open ↗
08/13/2026M00661010-S5Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/11/2017122827888Open ↗
▸Seals & Professional Certifications97
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/02/2026M00657622-P2Open ↗
09/02/2026M00657622-I1Open ↗
09/02/2026M00657622-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026M00657572-I1Open ↗
09/02/2026M00657572-I1Open ↗
09/02/2026M00657572-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
03/03/2017120629775Open ↗
09/05/2016120629775Open ↗
07/11/2016122827888Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026M00657572-I1Open ↗
09/01/2026M00657572-S1Open ↗
09/01/2026M00657572-S1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/13/2012121026326Open ↗
04/09/2012121023695Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
04/13/2012121026326Open ↗
04/09/2012121023695Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING5
11/16/2011120897850Open ↗
10/14/2011120856653Open ↗
Showing 2 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/20/2011120897850Open ↗
Showing 1 of 3 on file for this type
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
09/27/2016122827888Open ↗
01/11/2014121892318Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/03/2025124040279Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
08/26/2016122827888Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/01/2026M08047130-I1Open ↗
08/31/2026M07999445-I1Open ↗
08/29/2026M00895918-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT12
11/16/2011120897850Open ↗
11/16/2011120897850Open ↗
11/16/2011120897850Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/02/2026M00657622-I1Open ↗
09/01/2026M00657572-I1Open ↗
09/01/2026M00657572-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance8
▸BISTR8: Energy Code Progress Inspections2
11/16/2011120897850Open ↗
10/24/2011120629775Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00657572-S1Open ↗
08/13/2026M00657572-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/03/2017120629775Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/14/2011120856653Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/03/2017120629775Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00657572-I1Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/23/2018122827888Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
01/12/2021122827888Open ↗
10/05/2020122827888Open ↗
07/01/2020122827888Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS APPROVAL11
12/06/2024124040279Open ↗
03/03/2017120629775Open ↗
08/26/2016122827888Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
08/24/2023122827888Open ↗
01/14/2022122827888Open ↗
12/13/2021122827888Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
04/13/2012121026326Open ↗
04/09/2012121023695Open ↗
10/14/2011120856653Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/15/2024122827888Open ↗
06/17/2019122827888Open ↗
04/19/2013121026326Open ↗
▸BISSUPERSEDING LETTER2
04/10/2015121026326Open ↗
04/19/2013121023695Open ↗
▸BISSHED LETTER2
04/07/2014121023695Open ↗
04/19/2013121023695Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
02/13/2018122827888Open ↗
03/03/2017120629775Open ↗
07/11/2016122827888Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms53
▸BISADDITIONAL INFORMATION25
06/25/2018122827888Open ↗
06/25/2018122827888Open ↗
05/21/2018122827888Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM16
04/10/2020122827888Open ↗
04/03/2020122827888Open ↗
12/31/2019122827888Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET10
05/06/2024124040279Open ↗
07/11/2016122827888Open ↗
01/11/2014121892318Open ↗
Showing 3 of 10 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents18
▸DOB NOWProof of Historic Building4
08/13/2026M00661010-P2Open ↗
08/13/2026M00661010-P1Open ↗
08/13/2026M00661010-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDHCR Document3
08/13/2026M00774155-P3Open ↗
08/13/2026M00774155-S1Open ↗
08/13/2026M00774155-P2Open ↗
▸BISPLOT DIAGRAM2
07/11/2016122827888Open ↗
01/11/2014121892318Open ↗
▸DOB NOWCalculations2
08/13/2026M00975780-I1Open ↗
08/13/2026M01024722-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01024722-I1Open ↗
08/13/2026M00975780-I1Open ↗
▸BISCOPY OF DOF TAX MAP1
05/24/2024124040279Open ↗
▸BISIDENTIFY THE PRIMARY JOB ON PW11
01/30/2025124040279Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/19/2013120629775Open ↗
▸BISRP 602 FORM TENTATIVE CONDO UNITS1
05/24/2024124040279Open ↗
▸BISATTORNEY GEN. DRAWING COPY1
12/06/2024124040279Open ↗