1120 5TH AVENUE
MANHATTAN · BIN 1047101
💬 Discuss this project
1925Year Built
14Stories
D4Building Class
R10Zoning
165,357 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 1120 Fifth Avenue · 15,478 sf lot · 10.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAkam Associates, INC.Under Construction23p · 4 filings · 20 docs
PenthouseUnit PHBUnder Construction33p · 2 filings · 20 docs
Floor 14Under Construction6p · 1 filing · 13 docs
Floor 13
Floor 12
Floor 11
Floor 10Unit 10BUnder Construction19p · 2 filings · 20 docs
Floor 9
Floor 8Unit 8A, Unit 8C46p · 3 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4Unit 4A2 filings · 9 docs
Floor 3Unit 3A28p · 1 filing · 20 docs
Floor 2
Floor 1Akam Associates, INC.9p · 2 filings · 12 docs
Cellar4p · 2 filings · 20 docs
Site & exteriorAkam Associates, INC.13p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1120 Fifth Avenue2803/22/2026
1120 5th Ave1403/22/2026
Brown, Harris, Stevens503/21/2026
1120 5 Avenue403/21/2026
BHS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Clark ConstructionGeneral Contractor1407/08/2026
STM InteriorsGeneral Contractor807/01/2026
Zacco BuildingGeneral Contractor607/08/2026
Quality Building ConstrutionGeneral Contractor507/01/2026
P.S. Marcato Elev. CoElectrical403/21/2026
Donato PlumbingPlumbing310/04/2026
Aled TechnologiesGeneral Contractor303/21/2026
Ceprine ConstructionScaffold207/08/2026
Hydrokinetic Plumbing & Heating IPlumbing207/08/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Lobello Electric InstallationElectrical103/21/2026
Walter J.grande P & HPlumbing107/08/2026
TJ Doyle Electric EntpsElectrical103/21/2026
Cross Hudson ElectricalElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
K & G Electric CoElectrical103/22/2026
T. McCaffrey-T. McGovernElectrical103/21/2026
Team ElectricElectrical103/21/2026
AE ElectricElectrical103/21/2026
Scordio ConstructionGeneral Contractor107/08/2026
MCM Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Solutions, PL6492310/05/2026
Metric Consulting and Ins1803207/08/2026
AG Engineering8899207/08/2026
Catalpa Special Inspectio2004504/10/2026
Special Testing & Consulting1688203/27/2026
Building Consulting Engineering1034211/25/2025
Mark Gould Architect1933206/02/2025
Grant Engineering2627403/03/2025
Group-S5216112/08/2023
Piro Studio7503112/01/2021
Patrick Gerard Carmody, A2156111/29/2021
P.a.collins Inspections P2168205/27/2021
Building Lifecycle
All (232)Filed (37)Permit Issued (38)Signed Off (13)Facade (FISP) (18)Violation (60)Inspection (12)Objection (24)Special Inspection (30)
10/05/2026
Filed — Alteration
10B: Installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy
M01230997-P1
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Ryan
09/15/2026
Permit issued — Plumbing
M01040741-S2-PL
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2026
Filed — Alteration
Filing for the renovation work of apt# PHB. Remove and install interior partition work, finishes etc. Replace windows and doors . Enlarge masonry window openings. No change in use, egress or occupancy.
M01253883-S3
06/29/2026
Permit issued — General Construction
M01361643-I1-GC-CX
06/29/2026
Permit issued — General Construction
M01230997-I1-GC
06/29/2026
Permit issued — General Construction
M01226455-I1-GC
06/29/2026
Permit issued — Mechanical Systems
M01230997-S2-MS
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2026
Permit issued — Plumbing
M01230997-S1-PL
05/19/2026
Signed off — Alteration
Interior renovations to apt. #8A. Work to include non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress, or occupancy.
M01040741-I1
05/19/2026
Signed off — Alteration
Interior renovations to apt. #8A. Work to include non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress, or occupancy.
M01040741-S4
05/19/2026
Signed off — Alteration
Interior renovations to apt. #8A. Work to include non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress, or occupancy.
M01040741-S1
05/19/2026
Signed off — Alteration
Interior renovations to apt. #8A. Work to include non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress, or occupancy.
M01040741-S3
05/02/2026
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
05/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
05/02/2026
Special inspection requirement — Final
LEE MINDEL
05/02/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
05/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
05/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
04/16/2026
Objection raised — Scope
04/10/2026
Filed — Alteration
Filing for the renovation work of apt# PHB. Remove and install interior partition work, finishes etc. Replace windows and doors . Enlarge masonry window openings. No change in use, egress or occupancy.
M01253883-P2
04/10/2026
Permit issued — Plumbing
M01316240-I1-PL
04/09/2026
Permit issued — Mechanical Systems
M01316240-S1-MS
04/07/2026
Permit issued — General Construction
M01040741-S3-GC
04/07/2026
Permit issued — Mechanical Systems
M01040741-S4-MS
03/31/2026
Special inspection requirement — Masonry
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
03/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/31/2026
Special inspection requirement — Final
LEE MINDEL
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/31/2026
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
03/27/2026
Filed — Alteration
Roof replacement, new stair installation with facade repairs (repointing, brick, sill, furnish splash block, removal of unused pipe penetration & dunnage as per plans herewith No change in use, egress or occupancy.
M01361643-I1
03/20/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01370100-I1
03/20/2026
Permit issued — Suspended Scaffold
M01370100-I1-SC
03/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
03/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
03/03/2026
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
02/18/2026
Special inspection requirement — Final
Kenneth Santelli
02/02/2026
Objection resolved — Addressed
02/02/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Fire_Protection
01/07/2026
Objection raised — Zoning
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/17/2025
Objection raised — Energy
12/08/2025
Objection raised — Scope
12/05/2025
Objection raised — Scope
11/25/2025
Filed — Alteration
Filing for the renovation work of apt# PHB. Remove and install interior partition work, finishes etc. Replace windows and doors . Enlarge masonry window openings. No change in use, egress or occupancy.
M01253883-P1
11/25/2025
Filed — Alteration
Filing for the mechanical work in conjunction with the renovation of the Apt# PHB.
M01316240-I1
11/25/2025
Filed — Alteration
Filing for the mechanical work in conjunction with the renovation of the Apt# PHB.
M01316240-S1
11/14/2025
Special inspection requirement — Masonry
11/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
11/12/2025
Permit issued — General Construction
M01040741-I1-GC
11/11/2025
Special inspection requirement — Final
ERIC BERLENT
11/11/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
11/11/2025
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
Latest 60 of 232 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDonato Plumbing09/15/2026
DOB NOWGeneral ConstructionPermit IssuedQuality Building Constrution06/29/2026
DOB NOWGeneral ConstructionPermit IssuedSTM Interiors06/29/2026
DOB NOWGeneral ConstructionPermit IssuedSTM Interiors06/29/2026
DOB NOWMechanical SystemsPermit IssuedSTM Interiors06/29/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I06/03/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing04/10/2026
DOB NOWMechanical SystemsPermit IssuedClark Construction04/09/2026
DOB NOWGeneral ConstructionSigned-offClark Construction04/07/2026
DOB NOWMechanical SystemsSigned-offClark Construction04/07/2026
DOB NOWSuspended ScaffoldPermit IssuedQuality Building Construction03/20/2026
DOB NOWGeneral ConstructionSigned-offClark Construction11/12/2025
DOB NOWGeneral ConstructionPermit IssuedClark Construction09/05/2025
DOB NOWMechanical SystemsPermit IssuedSTM Interiors07/01/2025
DOB NOWGeneral ConstructionPermit IssuedSTM Interiors07/01/2025
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I06/30/2025
DOB NOWGeneral ConstructionPermit IssuedSTM Interiors05/27/2025
DOB NOWMechanical SystemsSigned-offClark Construction05/14/2025
DOB NOWGeneral ConstructionSigned-offClark Construction05/14/2025
DOB NOWMechanical SystemsSigned-offClark Construction04/07/2025
DOB NOWGeneral ConstructionSigned-offClark Construction04/07/2025
DOB NOWPlumbingPermit IssuedDonato Plumbing10/07/2024
DOB NOWMechanical SystemsSigned-offScordio Construction07/09/2024
DOB NOWGeneral ConstructionSigned-offClark Construction05/16/2024
DOB NOWMechanical SystemsSigned-offClark Construction05/15/2024
DOB NOWMechanical SystemsSigned-offAled Technologies03/11/2024
DOB NOWGeneral ConstructionSigned-offZacco Building09/21/2022
DOB NOWMechanical SystemsSigned-offZacco Building09/21/2022
DOB NOWSidewalk ShedSigned-offCeprine Construction08/17/2022
DOB NOWGeneral ConstructionSigned-offQuality Building Construt08/11/2022
DOB NOWPlumbingSigned-offWalter J.grande P & H07/20/2022
DOB NOWPlumbingSigned-offMCM Plumbing & Heating03/15/2022
DOB NOWGeneral ConstructionSigned-offZacco Building03/07/2022
DOB NOWMechanical SystemsSigned-offZacco Building03/07/2022
DOB NOWGeneral ConstructionSigned-offQuality Building Construt09/09/2021
DOB NOWSidewalk ShedSigned-offCeprine Construction08/30/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating01/21/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/19/2020
BISOTISSUEDScordio Construction03/31/2021
BISOTISSUEDScordio Construction03/31/2021
+ 48 more permits on file
4 projects · most recent 10/05/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/05/2026Permit IssuedSTM InteriorsAir Conditioning Systems
Cooling
National Comfort NCP4305000B 30,000 BTU · Condensing Unit ×2
11/25/2025Permit IssuedClark ConstructionHeating and Air Conditioning Systems
Heat / Cool
Daikin DSH0903L000201C 86,000 BTU · Rooftop Unit ×1
RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×1
11/06/2025Signed-offClark ConstructionHeating and Air Conditioning Systems
Heat / Cool
Daikin REYQ168AATJB 14 tons · Vrf Outdoor ×1
12/08/2023Signed-offAled TechnologiesHeating and Air Conditioning Systems
Heat / Cool
Samsung AM048TNZDCH 48,000 BTU · Vrf Indoor ×2
AM096BXVGFH 96,000 BTU · Vrf Outdoor ×1
3 projects · most recent 10/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/05/2026Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
11/25/2025Permit IssuedDonato PlumbingGas, Water/Sanitary
11/06/2025Permit IssuedDonato PlumbingGas, Water/Sanitary
16 projects · most recent 10/02/2026
General Wiring
FiledStatusContractorScope
10/02/2026CompleteRiverdale ElectricGeneral Wiring
06/16/2026Permit IssuedJRS ElectricGeneral Wiring
05/11/2026CompleteAE Electric1 meters
03/11/2026Permit IssuedApollo Electric NYG1 meters
10/07/2025CompleteAE ElectricGeneral Wiring
09/05/2025CompleteAE Electric—
05/21/2025CompleteV.R. Electrical—
04/15/2022CompleteMku ElectricGeneral Wiring
08/19/2021CompleteBorowide Elect'l Contractors—
03/25/2021CompleteGlendale Electl ContngGeneral Wiring
03/03/2021CompleteK & G Electric CoGeneral Wiring
05/31/2020CompleteJam Electrical—
01/23/2019CompleteHI-Tech Wiring Electrical ServicesGeneral Wiring
09/24/2018CompleteWarren Ostroff Electric—
08/16/2018CompleteHI-Tech Wiring Electrical Services—
2 projects · most recent 07/08/2026
Steel Masonry
FiledStatusContractorScope
07/08/2026Permit IssuedClark ConstructionSteel
03/27/2026Permit IssuedQuality Building ConstrutMasonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
09/23/2026Fire-Resistant Penetrations and JointsJohn Ryanspecial
05/02/2026MasonrySAMI HAJJAR P.Especial
05/02/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
05/02/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
05/02/2026Post-installed AnchorsERIC BERLENTspecial
05/02/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
05/02/2026FinalLEE MINDELprogress
03/31/2026Masonry—special
03/31/2026FinalLEE MINDELprogress
03/31/2026Tenant Protection Plan Compliance—special
03/31/2026Structural Stability – Alterations of existing buildings—special
03/31/2026Post-installed AnchorsERIC BERLENTspecial
03/31/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/12/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
03/03/2026MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
03/03/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
02/18/2026FinalKenneth Santelliprogress
11/14/2025Masonry—special
11/14/2025Structural Stability – Alterations of existing buildings—special
11/13/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/13/2025Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
11/11/2025Post-installed AnchorsERIC BERLENTspecial
11/11/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/11/2025FinalERIC BERLENTprogress
11/11/2025Mechanical SystemsERIC BERLENTspecial
Latest 25 of 80.
▾Documents — 927 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch33
09/03/2026M00489743-I1Request digital key ↗
09/03/2026M00576774-I1Request digital key ↗
09/02/2026M00623609-S2Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00257927-I1Request digital key ↗
08/15/2026M00257927-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00215788-I1Request digital key ↗
08/15/2026M00215788-P1Request digital key ↗
▸Applications & Permits200
▸BISWORK PERMIT APPLICATION87
09/29/2020140945477Open ↗
08/26/2019123693592Open ↗
08/08/2019123752448Open ↗
Showing 3 of 87 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION77
09/07/2023104181804Open ↗
08/28/2020140945477Open ↗
11/19/2019123805196Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWLPC Approval/Permit34
09/04/2026M00215788-I1Open ↗
09/02/2026M00623609-S2Open ↗
09/02/2026M00623609-P1Open ↗
Showing 3 of 34 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications217
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
12/03/2019123805196Open ↗
11/25/2019123693592Open ↗
11/25/2019123693592Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/04/2026M00215788-I1Open ↗
09/03/2026M00576774-I1Open ↗
09/02/2026M00623609-S2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/02/2026M01226455-I1Open ↗
09/02/2026M01226455-I1Open ↗
09/01/2026M01361643-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/06/2026M01230997-P1Open ↗
09/02/2026M01226455-I1Open ↗
09/01/2026M01361643-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
08/07/2019123752448Open ↗
07/11/2018123474025Open ↗
Showing 2 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
08/28/2020140945477Open ↗
08/07/2019123752448Open ↗
Showing 2 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/28/2020140945477Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/28/2020140945477Open ↗
▸Trade Schedules & Equipment54
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE28
11/19/2019123805196Open ↗
10/08/2019123805196Open ↗
10/04/2019123805196Open ↗
Showing 3 of 28 on file for this type
▸BISEQUIPMENT USE PERMITS8
06/03/2019123435755Open ↗
06/03/2019123435755Open ↗
Showing 2 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
06/03/2019123435755Open ↗
Showing 1 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/11/2021140945477Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/11/2021140945477Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes12
08/26/2019123693592Open ↗
08/14/2019123693592Open ↗
08/07/2019123752448Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00215788-I1Open ↗
08/13/2026M00257927-P1Open ↗
08/13/2026M00257927-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos61
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/02/2026M00623609-S2Open ↗
09/02/2026M00623609-P1Open ↗
09/02/2026M00692450-I1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
08/28/2020140945477Open ↗
05/10/2019123805196Open ↗
10/12/2018103793619Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
08/14/2019123693592Open ↗
08/08/2019123752448Open ↗
Showing 2 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance71
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS44
12/03/2019123805196Open ↗
11/25/2019123693592Open ↗
11/25/2019123693592Open ↗
Showing 3 of 44 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
11/25/2019123693592Open ↗
11/20/2019123693592Open ↗
04/15/2019123435755Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/11/2021123752448Open ↗
05/11/2021140945477Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
05/11/2021123752448Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/11/2021140945477Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/11/2021140945477Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/11/2021140945477Open ↗
▸BISFENESTRATION AREAS1
05/11/2021140945477Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/11/2021140945477Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/29/2020140945477Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/11/2021123752448Open ↗
▸Approvals, Objections & Sign-offs84
▸BISLANDMARKS APPROVAL37
08/28/2020140945477Open ↗
12/03/2019123805196Open ↗
08/14/2019123693592Open ↗
Showing 3 of 37 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
05/13/2021123752448Open ↗
05/13/2021140945477Open ↗
12/03/2019123805196Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER5
03/27/2019122347264Open ↗
Showing 1 of 5 on file for this type
▸BISFINAL2
05/11/2021123752448Open ↗
05/11/2021140945477Open ↗
▸BISLANDMARKS SIGNOFF2
08/04/2022103793619Open ↗
05/13/2021140945477Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership53
▸BISCOST AFFIDAVIT48
08/28/2020140945477Open ↗
12/03/2019123805196Open ↗
11/25/2019123693592Open ↗
Showing 3 of 48 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
05/13/2021140945477Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
05/13/2021123752448Open ↗
▸Filing & Intake Forms98
▸BISBOROUGH INTAKE FORM42
12/03/2019123805196Open ↗
11/25/2019123693592Open ↗
11/19/2019123805196Open ↗
Showing 3 of 42 on file for this type
▸BISEFILING COVER SHEET30
08/14/2019123693592Open ↗
08/07/2019123752448Open ↗
Showing 2 of 30 on file for this type
▸BISADDITIONAL INFORMATION25
10/10/2019123805196Open ↗
05/10/2019123805196Open ↗
05/10/2019123805196Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/28/2020140945477Open ↗
▸Other Documents27
▸DOB NOWProof of Historic Building9
08/18/2026M01361643-I1Open ↗
08/17/2026M01253883-P4Open ↗
08/17/2026M01253883-P2Open ↗
Showing 3 of 9 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
10/12/2018103793619Open ↗
10/12/2018103793619Open ↗
10/12/2018103793619Open ↗
Showing 3 of 8 on file for this type
▸BISSupporting Document: Fee Deferment4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPRELIMINARY1
05/13/2021140945477Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01370100-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/18/2026M01361643-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01370100-I1Open ↗