1120 BRYANT AVENUE
BRONX · Crotona Park East · BIN 2006204
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-1Zoning
10,898 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Old law tenement · Owner of record: MBD NEW HEIGHTS APTS HOUSING DEV FUND CO , INC. · 2,300 sf lot · 4.74 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Roof33p · 5 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 528p · 3 filings · 20 docs
Floor 428p · 3 filings · 20 docs
Floor 328p · 3 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 129p · 3 filings · 20 docs
Cellar29p · 4 filings · 20 docs
Site & exterior24p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBD COMMUNITY HOUSING1907/08/2026
NEIGHBORHOOD RESTORE HDFC1407/08/2026
1120_BRYANT AVENUE RTY203/21/2026
MBD NEW HEIGHTS APTS HOUSING DEV FUND CO , INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC506/26/2024
OLD STRUCTURES ENGINEERING, P.C.208/24/2023
PAUL PERDEK212/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
PS ENGINEERS203/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKM CONSTRUCTION NY CORPGeneral Contractor407/08/2026
J-J PLUMBING CORPPlumbing407/08/2026
NOTIAS CONSTRUCTION INCGeneral Contractor307/08/2026
J-J PLUMBING CORPFire Protection207/08/2026
YEVGENY KOLTUNOVElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344706/26/2024
Building Lifecycle
All (182)Filed (10)Permit Issued (13)Signed Off (6)Violation (60)Inspection (9)Objection (54)Special Inspection (30)
01/20/2026
Signed off — Alteration
PROPOSE STRUCTURAL AND PARTIAL DEMOLITION SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1# 210181827
X00407726-I1
06/04/2025
Violation issued (HPD, closed)
A
03/05/2025
Signed off — Alteration
PROPOSSE TO INSTALL (1) NEW BOILER AND ASSOCIATED CONTROLS FILED IN CONJUNCTION WITH ALT 1 # 210181827
X00411570-I1
02/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/10/2025
Signed off — Alteration
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210181827
X00407249-I1
02/03/2025
Violation issued (HPD, closed)
A
01/31/2025
Violation issued (HPD, closed)
I
10/24/2024
Signed off — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210181827.
X00407257-I1
10/08/2024
Signed off — Alteration
X08054695-I1
06/27/2024
Special inspection requirement — HVAC insulation and sealing
MINA HANNA
06/27/2024
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
06/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
06/27/2024
Special inspection requirement — Sprinkler Systems
MINA HANNA
06/26/2024
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210181827.
X00407257-P2
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
06/26/2024
Special inspection requirement — HVAC insulation and sealing
MINA HANNA
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
06/26/2024
Special inspection requirement — Sprinkler Systems
MINA HANNA
06/18/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/14/2024
Permit issued — Mechanical Systems
X00407249-I1-MS
06/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/11/2024
Permit issued — Sprinklers
X00407257-I1-PL
06/11/2024
Permit issued — Sprinklers
X00407257-I1-EW-SP
05/16/2024
Permit issued — Suspended Scaffold
X01041316-I1-SC
05/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/14/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/29/2024
Filed — Alteration
File-SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FAADE RESTORATION AND INSPECTION.
X01041316-I1
04/18/2024
Objection resolved — Addressed
03/06/2024
Permit issued — Boiler Equipment
X00411570-I1-BE
02/14/2024
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210181827.
X00407257-P1
02/14/2024
Objection raised — Other
02/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/07/2024
Special inspection requirement — Sprinkler Systems
MINA HANNA
02/07/2024
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
02/07/2024
Special inspection requirement — HVAC insulation and sealing
MINA HANNA
01/25/2024
Permit issued — Sidewalk Shed
X08054695-I1-SH
12/05/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF OVERHEAD PROTECTION AT ADJACENT PROPERTY (1025 EAST 167 ST) DURING BLDG ALTERATION, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08023619-I1
10/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/25/2023
Special inspection requirement — Structural Steel - Details
MINA HANNA
08/25/2023
Special inspection requirement — Concrete - Cast-In-Place
MINA HANNA
08/25/2023
Special inspection requirement — Masonry
MINA HANNA
08/25/2023
Special inspection requirement — Structural Steel - Welding
MINA HANNA
08/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
08/25/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MINA HANNA
08/25/2023
Special inspection requirement — Final
MINA HANNA
08/25/2023
Special inspection requirement — Structural Wood Frame
MINA HANNA
08/24/2023
Filed — Alteration
PROPOSE STRUCTURAL AND PARTIAL DEMOLITION SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1# 210181827
X00407726-P1
08/21/2023
Special inspection requirement — Structural Wood Frame
MINA HANNA
08/21/2023
Special inspection requirement — Final
MINA HANNA
08/21/2023
Special inspection requirement — Structural Steel - Welding
MINA HANNA
08/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MINA HANNA
08/21/2023
Special inspection requirement — Structural Steel - Details
MINA HANNA
08/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
08/21/2023
Special inspection requirement — Masonry
MINA HANNA
08/21/2023
Special inspection requirement — Concrete - Cast-In-Place
MINA HANNA
08/18/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/05/2023
Permit issued — Plumbing
X00407257-I1-PL
04/05/2023
Permit issued — Boiler Equipment
X00411570-I1-BE
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNOTIAS CONSTRUCTION INC06/14/2024
DOB NOWSprinklersSigned-offJ-J PLUMBING CORP06/11/2024
DOB NOWSprinklersSigned-offJ-J PLUMBING CORP06/11/2024
DOB NOWSuspended ScaffoldPermit IssuedLINEAL CONST & REST CORP05/16/2024
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP03/06/2024
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY01/25/2024
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP04/05/2023
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP04/05/2023
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP04/04/2023
DOB NOWStructuralSigned-offNOTIAS CONSTRUCTION INC03/30/2023
DOB NOWMechanical SystemsSigned-offNOTIAS CONSTRUCTION INC03/30/2023
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY12/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY12/12/2022
BIS—ISSUEDNOTIAS CONSTRUCTION INC04/15/2024
BIS—ISSUEDNOTIAS CONSTRUCTION INC07/31/2023
BIS—ISSUEDNOTIAS CONSTRUCTION INC04/10/2023
BISBLISSUEDMAXIMUM COMBUSTION CORP03/05/2009
BISEQISSUEDMARK CONSTRUCTION CO.06/21/2006
2 projects · most recent 11/04/2024
General Wiring
FiledStatusContractorScope
11/04/2024CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
12/14/2022CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 04/29/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/27/2024HVAC insulation and sealing MINA HANNAenergy_progress
06/27/2024Energy Code Compliance InspectionsMINA HANNAprogress
06/27/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
06/27/2024Sprinkler SystemsMINA HANNAspecial
06/26/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
06/26/2024HVAC insulation and sealing MINA HANNAenergy_progress
06/26/2024Energy Code Compliance InspectionsMINA HANNAprogress
06/26/2024Sprinkler SystemsMINA HANNAspecial
02/07/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/07/2024Sprinkler SystemsMINA HANNAspecial
02/07/2024Energy Code Compliance InspectionsMINA HANNAprogress
02/07/2024HVAC insulation and sealing MINA HANNAenergy_progress
08/25/2023Structural Steel - DetailsMINA HANNAspecial
08/25/2023Concrete - Cast-In-PlaceMINA HANNAspecial
08/25/2023MasonryMINA HANNAspecial
08/25/2023Structural Steel - WeldingMINA HANNAspecial
08/25/2023Structural Stability – Alterations of existing buildingsMINA HANNAspecial
08/25/2023Structural Steel - High Strength BoltingMINA HANNAspecial
08/25/2023FinalMINA HANNAprogress
08/25/2023Structural Wood FrameMINA HANNAprogress
08/21/2023Structural Wood FrameMINA HANNAprogress
08/21/2023FinalMINA HANNAprogress
08/21/2023Structural Steel - WeldingMINA HANNAspecial
08/21/2023Structural Steel - High Strength BoltingMINA HANNAspecial
08/21/2023Structural Steel - DetailsMINA HANNAspecial
Latest 25 of 35.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Sprinkler3
08/25/2026X00407257-P2Request digital key ↗
08/15/2026X00407257-P1Request digital key ↗
08/15/2026X00407257-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00407257-P2Request digital key ↗
08/15/2026X00407257-P1Request digital key ↗
08/15/2026X00407257-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
08/23/2026X08023619-I1Request digital key ↗
08/23/2026X08054695-I1Request digital key ↗
08/21/2026X01041316-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/22/2026X00407726-P1Request digital key ↗
08/22/2026X00407726-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026X00411570-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026X00407249-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION12
09/04/2025201058005Open ↗
11/18/2024210181827Open ↗
03/04/2024210181827Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION3
04/10/2023210181827Open ↗
03/05/2009210080464Open ↗
03/05/2009210080464Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/07/2024210181827Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
04/07/2023210181827Open ↗
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
04/07/2023210181827Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/28/2023210181827Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/16/2024210181827Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/02/2024210181827Open ↗
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026X00411570-I1Open ↗
09/23/2026X00411570-I1Open ↗
09/13/2026X00407726-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026X00411570-I1Open ↗
09/23/2026X00411570-I1Open ↗
09/23/2026X00411570-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026X00407257-I1Open ↗
08/25/2026X00407257-P1Open ↗
08/22/2026X00407726-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/25/2008210080464Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA1
01/16/2025210181827Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/16/2025210181827Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/25/2008210080464Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
02/25/2022210181827Open ↗
11/25/2008210080464Open ↗
▸BISSTREET TREE SIGNOFF1
11/25/2024210181827Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00407726-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/22/2026X00407726-I1Open ↗
08/13/2026X00407249-I1Open ↗
08/13/2026X00411570-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/25/2008210080464Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/27/2023210181827Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/27/2023210181827Open ↗
02/25/2022210181827Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/21/2024210181827Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/21/2024210181827Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/21/2024210181827Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/21/2024210181827Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/21/2024210181827Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/21/2024210181827Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00407249-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/27/2023210181827Open ↗
02/25/2022210181827Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/21/2024210181827Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00407726-I1Open ↗
08/13/2026X00407726-P1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
11/04/2020210181827Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/25/2008210080464Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/05/2020210181827Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
08/20/2024210181827Open ↗
03/02/2022210181827Open ↗
11/25/2008210080464Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/20/2024210181827Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
12/31/2024210181827Open ↗
03/26/2024210181827Open ↗
02/25/2022210181827Open ↗
▸BISEFILING COVER SHEET2
07/30/2020210181827Open ↗
07/29/2020210181827Open ↗
▸Other Documents13
▸DOB NOWDHCR Document10
08/15/2026X00407257-P1Open ↗
08/15/2026X00407257-P1Open ↗
08/15/2026X00407257-I1Open ↗
Showing 3 of 10 on file for this type
▸BISDHCR DOCUMENT1
02/25/2022210181827Open ↗
▸DOB NOWCalculations1
08/13/2026X01041316-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01041316-I1Open ↗