← Back
Four families
1120 CLARKSON AVENUE
BROOKLYN · BIN 3101214
💬 Discuss this project
1910Year Built
2Stories
C3Building Class
R6Zoning
5,360 sfGross Floor Area
4Units
Rent Stabilized42 Open Violations ▸FDNY Report ↗
Four families · Owner of record: MOXADO INC · 2,000 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 4 docs
Floor 26p · 3 filings · 16 docs
Floor 17p · 2 filings · 7 docs
Cellar6p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOXADO807/08/2026
ABRAHAM CONTRACTORS1003/21/2026
1120 CLARKSON AVENUE INC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2020$719K—Private party → THE TAUREAU GROUP, INC.$134/sf building
01/09/2019$665K—Private party → Private party$124/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REDUS LLC503/22/2023
DANIEL GERDES ARCHITECT206/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MILLIEN DESIGN AND CONSULTAN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABRAHAM CONTRACTORS INCGeneral Contractor407/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129206/24/2022
Building Lifecycle
All (108)Filed (7)Permit Issued (3)Violation (60)Objection (34)Special Inspection (4)
05/04/2026
Violation issued (HPD, open)
A
04/09/2026
Violation issued (ECB, open)
Construction
04/09/2026
Violation issued (ECB, open)
Construction
11/19/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/09/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
11/18/2023
Violation issued (ECB, open)
Construction
11/18/2023
Violation issued (ECB, open)
Construction
06/22/2023
Permit issued — General Construction
B00546676-I1-GC
06/22/2023
Objection resolved — Addressed
06/17/2023
Permit issued — General Construction
B00546676-I1-GC
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
06/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Scope
03/24/2023
Objection raised — Admin
03/24/2023
Objection raised — Admin
03/24/2023
Objection raised — Other
03/24/2023
Objection raised — Fire_Protection
03/24/2023
Objection raised — Fire_Protection
03/24/2023
Objection raised — Inspections
03/24/2023
Objection raised — Admin
03/24/2023
Objection raised — Other
03/22/2023
Filed — Alteration
MODIFICATION OF EXISTING 3 PC BATHROOM AND INSTALLATION OF ONE NEW 2 PC TOILET ON 1ST FLOOR. ALSO INCLUDING IS REMOVAL OF ONE EXISTING KITCHEN AND ONE EXISTING 3 PC BATHROOM ON 1ST FLOOR.
B00846573-I1
03/21/2023
Violation issued (HPD, open)
A
01/11/2023
Filed — Alteration
MODIFICATION OF EXISTING 3 PC BATHROOM AND INSTALLATION OF ONE NEW 2 PC TOILET ON 1ST FLOOR. ALSO INCLUDING IS REMOVAL OF ONE EXISTING KITCHEN AND ONE EXISTING 3 PC BATHROOM ON 1ST FLOOR.
B00742320-P2
01/05/2023
Objection resolved — Addressed
01/05/2023
Objection resolved — Addressed
01/05/2023
Objection resolved — Addressed
01/05/2023
Objection resolved — Addressed
01/05/2023
Objection resolved — Addressed
01/05/2023
Objection resolved — Addressed
01/05/2023
Objection resolved — Addressed
12/12/2022
Objection resolved — Addressed
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
11/07/2022
Violation issued (HPD, open)
I
09/19/2022
Objection raised — Inspections
09/19/2022
Objection raised — Scope
09/19/2022
Objection raised — Structural
09/19/2022
Objection raised — Mechanical
09/19/2022
Objection raised — Scope
09/19/2022
Objection raised — Admin
09/19/2022
Objection raised — Inspections
09/19/2022
Objection raised — Mechanical
06/24/2022
Filed — Alteration
HEREWITH IS A FILING FOR THE SPRINKLER SYSTEM AS PER PLANS.
B00760364-I1
06/18/2022
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
06/08/2022
Filed — Alteration
MODIFICATION OF EXISTING 3 PC BATHROOM AND INSTALLATION OF ONE NEW 2 PC TOILET ON 1ST FLOOR. ALSO INCLUDING IS REMOVAL OF ONE EXISTING KITCHEN AND ONE EXISTING 3 PC BATHROOM ON 1ST FLOOR.
B00742320-P1
05/20/2022
Filed — Alteration
MODIFICATION OF EXISTING 3 PC BATHROOM AND INSTALLATION OF ONE NEW 2 PC TOILET ON 1ST FLOOR. ALSO INCLUDING IS REMOVAL OF ONE EXISTING KITCHEN AND ONE EXISTING 3 PC BATHROOM ON 1ST FLOOR.
B00742320-I1
03/16/2022
Permit issued — Plumbing
B00674523-I1-PL
03/09/2022
Filed — Alteration
MODIFICATION OF EXISTING 3 PC BATHROM AND INSTALLATION OF ONE NEW 2 PC TOILET ON 1ST FLOOR. ALSO INCLUDING IS REMOVAL OF ONE EXISTING KITCHEN AND ONE EXISTING 3PC BATHROOM ON 1ST FLOOR.
B00674523-I1
02/23/2022
Violation issued (HPD, open)
I
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedABRAHAM CONTRACTORS INC06/22/2023
DOB NOWGeneral ConstructionPermit IssuedABRAHAM CONTRACTORS INC06/17/2023
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C03/16/2022
BISPLISSUEDMAINLAND PLUMBING07/23/1997
1 project · most recent 06/24/2022
FiledStatusContractorScope
06/24/2022———
3 projects · most recent 03/22/2023
Water/Sanitary Gas
FiledStatusContractorScope
03/22/2023——Gas, Water/Sanitary
01/11/2023——Gas, Water/Sanitary
03/09/2022Permit Issued5 BORO'S PLUMBING INCWater/Sanitary
2 projects · most recent 09/19/2022
FiledStatusContractorScope
09/19/2022Permit IssuedCLAIRMONT ELEC'L CONTR'G5 meters, 5 new_meters
11/10/2021CompleteCLAIRMONT ELEC'L CONTR'G5 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/12/2023Energy Code Compliance Inspections—progress
06/05/2023Fire-Resistant Penetrations and Joints—special
12/12/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
06/18/2022Sprinkler SystemsNANIK MASSANDspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00546676-I1Request digital key ↗
08/31/2026B00674523-I1Request digital key ↗
08/29/2026B00742320-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00546676-I1Open ↗
08/29/2026B00742320-P1Open ↗
08/29/2026B00742320-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00760364-I1Open ↗
08/28/2026B00760364-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
09/01/2026B00546676-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00546676-I1Open ↗
08/29/2026B00742320-I1Open ↗
08/29/2026B00742320-P2Open ↗
Showing 3 of 7 on file for this type