Whole building & multi-floor projectsTemporary pipe scaffold installationUnder Construction3 filings
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Replace overhead gas piping in cellar from the entry point to risers (A/D, B/C) replace/relocate B/C riser, repair A/D riser as necessary, replace branching piping as necessary. Existing B/C riser to be abandon in place. (GC work to be filed separately)
On file for this project
8 documents · 1 drawing sheet
RoofLimited exterior facade repairsUnder Construction3p · 3 filings · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
REPAIR/REPLACE FACADE AS NECESSARY TO INCLUDE MASONRY, POINTING, LINTELS, AND MASONRY CORNER RECONSTRUCTION, AS PER DRAWINGS
On file for this project
8 documents · 1 drawing sheet
Mechanical work filed in conjunction with the renovation of an existing dwelling unit as per plans. Architectural and plumbing work as per plans. No change of use, occupancy or egress.
On file for this project
24 documents · 1 drawing sheet
Reconstruction of service ramp per drawings. No change in use, egress or occupancy is involved under this application.
On file for this project
7 documents · 1 drawing sheet
Floor 21Unit 21A, Unit 21B, Unit PHC +1Under Construction7p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INTERIOR RENOVATION OF APT. 21B ON THE 21ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES.
On file for this project
8 documents · 3 drawing sheets
MODIFICATION TO EXISTING MECHANICAL SYSTEM ON THE 20TH & 21ST FLOORS (APT.20/21A).
On file for this project
8 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 20Unit 209p · 3 filings · 14 docs
ArchitectureDMEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES.
On file for this project
8 documents · 3 drawing sheets
MODIFICATION TO EXISTING MECHANICAL SYSTEM ON THE 20TH & 21ST FLOORS (APT.20/21A).
On file for this project
8 documents · 3 drawing sheets
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND FINISHES IN APARTMENT 20/21A. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
15 documents · 3 drawing sheets
Floor 19Unit 19A2p · 2 filings · 6 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
Plumbing Work Associated with Interior renovation to Existing Apartment #19A filed under separate application DOB# 123742478. Removal and Installation of Plumbing Fixtures and piping. No change to use occupancy or egress under this application.
On file for this project
10 documents · 2 drawing sheets
Installation of Ventilating and Air Conditioning Systems for the Space. As per plans filed herewith, no change to use,occupancy or egress.
On file for this project
10 documents
Floor 18
Floor 17Unit 17B1 filing · 12 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Plumbing application, install new plumbing fixtures as per plans. No change in egress, occupancy or use.
On file for this project
12 documents
Floor 16
Floor 15
Floor 14Unit 14C3p · 3 filings · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF APT 14C
On file for this project
12 documents · 1 drawing sheet
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APT 14C
On file for this project
14 documents
Structural work filed for new and enlarged exterior openings for thru wall units. No change in use, occupancy, or egress.
On file for this project
27 documents · 2 drawing sheets
Floor 13
Floor 12Unit 12B1 filing · 4 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
PERFORM MECHANICAL WORK INCONJUNCTION WTH APT#12B RENOVATION. INSTALL NEW THRU WALL HVAC SYSTEM & BATHROOM MECHANICAL VENTILATION. GENERAL CONSTRUCTION & WALL OPENINGS FILED UNDER SEPARATE ALT II FILING.NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTI
On file for this project
5 documents
Floor 11
Floor 10
Floor 9Unit 9BE1p · 1 filing · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Plumbing work as per plans attached herewith. No change in use, egress and occupancy.
On file for this project
24 documents · 1 drawing sheet
Floor 8
Floor 7Unit 7A3 filings · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Mechanical work filed in conjunction with the renovation of an existing dwelling unit as per plans. Architectural and plumbing work as per plans. No change of use, occupancy or egress.
On file for this project
24 documents
Plumbing work filed in conjunction with the renovation of an existing dwelling unit. Architectural and mechanical work filed separately. No change of use, occupancy or egress.
On file for this project
12 documents
Renovation of an existing dwelling unit. Architectural work as per plans. Associated mechanical and plumbing work as per plans. No change of use, occupancy or egress.
On file for this project
20 documents
Floor 6Unit 6C4p · 3 filings · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
Modifications to existing PL system and related piping for apartment 6C. No change in use, egress or occupancy.
On file for this project
24 documents · 3 drawing sheets
Window replacement and enlarged masonry opening for apartment 6C kitchen. Related interior work filed under #M01032349-I1. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
PROPOSED INSTALLATION OF TEMPORARY NETTING AROUND SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 5Unit 5BUnder Construction2 filings · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affected by this work.
On file for this project
20 documents
PROPOSED INSTALLATION OF TEMPORARY NETTING AROUND SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 4Unit 4C2p · 4 filings · 12 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
PROPOSED INSTALLATION OF TEMPORARY NETTING AROUND SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Modifications to plumbing system and related piping as shown on plans. No change in use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Interior renovation of partitions, ceilings and doors as shown on plans. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 3Netting1 filing · 2 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
PROPOSED INSTALLATION OF TEMPORARY NETTING AROUND SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 2Unit 2A, Unit 2D2p · 3 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
RENOVATE EXISTING APARTMENT 2A; WORK TO INCLUDE REMOVING AND INSTALLING NON-BEARING PARTITION WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
33 documents · 2 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY NETTING AROUND SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
COMBINATION OF APARTMENTS #2A AND #2D UNDER TPPN 3/97; DEMOLITION OF NON-LOADBEARING PARTITIONS; CONSTRUCTION OF NEW PARTITIONS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents
Floor 1New gas piping to existing oil burners1p · 3 filings · 11 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALL NEW GAS LINE IN CELLAR TO EXISTING OIL BURNER GAS PILOT
On file for this project
7 documents · 1 drawing sheet
PROPOSED INSTALLATION OF TEMPORARY NETTING AROUND SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
CellarNew gas piping to existing oil burners1p · 1 filing · 7 docs
ArchitecturePlumbing
Issued Permit Scope
Plumbing
INSTALL NEW GAS LINE IN CELLAR TO EXISTING OIL BURNER GAS PILOT
On file for this project
7 documents · 1 drawing sheet
Site & exteriorAbramson Brothers IncUnder Construction17 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 3 drawing sheets