DOB02/01/2019V-DOB VIOLATION - ACTIVE
DOB07/07/2017STOP ALL WORK IMMEDIATELY MAKE THE SITE SAFE ONLY CONTACT BOROUGH COMM ISSIONER OFFICE AT 718 802-36777
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/01/2018JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. OBSERVED PLYWOOD PANELS COVERING EXCAVATED AREA WITH CONCRETE FORM WORK IN FRONT YARD AND REAR YARD AT EXPOSURE 2. COVERAGE NOT COMPLETE AND NOT ERECTED ASNothing owed — awaiting certificate of correction
ECB02/29/2016FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. AT THE TIME OF MY INSPECTION 1:05PM ON 2/29/16 AT ABOVE ADDRESS I OBSERVED IN CELLAR NEWLY INSTALLED GAS PIPING,FITTINGS & VALVES W/O ANY PROPER TESTING.Nothing owed — awaiting certificate of correction
ECB02/29/2016FAIL TO MAINTAIN BLDG IN CODE COMPLIANT MANNER RE: INSTALLATION/MAINTENCE OF PLUMBING MATERIALS/EQUIPMENT PER PC 1023.3;27-902. AT THE TIME OF MY INSPECTION 1:05PM ON 2/29/16 AT ABOVE ADDRESS I OBSERVED IN CELLNothing owed — awaiting certificate of correction
ECB02/29/2016GAS PIPING SUPPLIED TO BLDG W/O INSPECTION & CERTIFICATION BY DOB. AT THE TIME OF MY INSPECTION 1:05PM ON 2/29/16 AT ABOVE ADDRESS I OBSERVED IN CELLAR GAS PIPING BEING SUPPLIED TO WATER HEATER & BOILER W/O ANYNothing owed — awaiting certificate of correction
ECB02/29/2016FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: RE: PROHIBITED MATERIAL AT THE TIME OF MY INSPECTION 1:05PM ON 2/29/16 AT ABOVE ADDRESS IN CELLAR ABOVE BOILER ON FUTUTE GAS TEE CONNECTION WHICH IS NOT CODENothing owed — awaiting certificate of correction
ECB02/29/2016WORK W/O A PERMIT. AT THE TIME OF MY INSPECTION 1:05PM ON 2/29/16 AT ABOVE ADDRESS I OBSERVED IN CELLAR ALL NEW WASTE,WATER & GAS PIPING INSTALLED. WASTE PIPE INCLUDING ALL NEW FITTINGS & MAIN HOUSE TRAP. GASNothing owed — awaiting certificate of correction
ECB02/22/201628-207-2.2 FAILURE TO COMPLY W/ AN ORDER TO STOP WORK BY DOB.@ THE TIME OF INSPECTION IT WAS OBSERVED THAT CONSTRUCTION WORK WAS ON GOING WHILE STOP WORK ORDER WAS IN PLACE.REM COMPLY W/ NOV.STOP WORK IMMEDIATENothing owed — awaiting certificate of correction
ECB02/16/2016SEC. 1001.3 FAILURE TO MAINTAIN EGRESS CLEAR & UNOBSTRUCTED. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THERE WAS NO EGRESS FROM THE CELLAR WHICH CONSTRUCTION OPERATION WAS ON GOING. REMEDY: COMPLY W/NOTICENothing owed — awaiting certificate of correction
ECB02/16/2016SEC. 3309.6 FAILURE TO MONITOR ADJOINING STRUCTURE FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION RELATED ACTIVITY THAT MAY ADVERSELY AFFECT ADJOINING STRUCTURES. AT THE TIME OF INSPECTION IT WAS OBSERVED THANothing owed — awaiting certificate of correction
ECB02/16/2016FAILURE TO NOTIFY DOB W/I 24-48HRS OF START OF EXCAVATION. AT THE TIMEOF INSPECITON EXCAVATION WAS IN OPERATION & THERE WAS NO NOTIFICATION TO DOB OF THE START OF EXCAVATION. REMEDY: OFFICIALLY NOTIFY DOB BYNothing owed — awaiting certificate of correction