← Back
BuildNYC
Elevator apt, semi-fireproof with stores
St. George
1125 LEXINGTON AVENUE · Name © OpenStreetMap contributors · BIN 1043239
💬 Discuss this project
1910Year Built
7Stories
D7Building Class
C1-8XZoning
20,257 sfGross Floor Area
34Units
Rent Stabilized2 Active Violations 0 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: Contor Associates · 3,122 sf lot · 6.49 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 71 filing
Floor 61 filing
Floor 51 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 11 filing
Site & exterior3 filings
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cantor Associates1703/22/2026
Sierra Real Estate503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Serdar Ceylan Architect112/16/2025
Rigid Structural Design110/09/2024
Howard L Zimmerman Arch & Engineering110/01/2024
Ashraf111/09/2023
KZ Engineering110/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design303/21/2026
Hlzae103/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystems Installation S&SScaffold407/08/2026
Ceprine ConstructionScaffold207/08/2026
A.S.H. ElectricElectrical103/22/2026
Aurora Electrical ContgElectrical103/21/2026
Cerina General ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712110/01/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
05/04/2026
Boiler inspection report filed
Initial · no defects · Accepted
12/16/2025
Filed — Alteration
M01321068-I1
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2025
Special inspection requirement — Final
114 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Cerina General Contracting—
DOB NOW—Ceprine Construction—
DOB NOW—Intersystems Installation S&S—
DOB NOW—Intersystems Installation S&S—
DOB NOW—Ceprine Construction—
BIS—Cerina General Contracting—
BIS—Metro Builders & Restoration—
BIS—Metro Builders & Restoration—
BIS—Metro Builders & Restoration—
BIS—Mauceri Sign Systems—
BIS—Mauceri Sign Systems—
BIS—Ace-Atlas Plbing & Heating—
BIS—Ace-Atlas Plbing & Heating—
BIS—Ace-Atlas Plbing & Heating—
BIS—Ace-Atlas Plbing & Heating—
BIS—Ace-Atlas Plbing & Heating—
BIS—Ace-Atlas Plbing & Heating—
BIS—Ceprine Construction—
BIS—Ceprine Construction—
BIS—Unique Fire Systems—
BIS—Steel Insustries—
BIS—Steel Insustries—
BIS—Quality Building Constrution—
BIS—Steel Industries—
BIS—Quality Building Constrution—
BIS—Steel Industries—
BIS—New York Sign Contractor—
BIS—Lico Air Conditioning & Refg—
BIS—Reliable Fire Protection—
BIS—C.R.U. Mechan & Heating—
BIS—Wellbuilt Equipment—
BIS—Ideal Fire Control—
BIS—Acme Awning Co—
BIS—Jeffrey N.Y—
BIS—Avon Plumbing & Heating—
BIS—S. Leggiero Construction—
BIS—Colgate Scaffolding—
BIS—Mario Moramarco—
BIS—Vasiliu Construction—
Nothing on file for this building.
Nothing on file for this building.
193 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account