1125 PARK AVENUE
MANHATTAN · BIN 1048245
💬 Discuss this project
1926Year Built
14Stories
D4Building Class
R10Zoning
211,870 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized48 Open Violations 44 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 1125 PARK AVENUE CORPORATION · 19,398 sf lot · 10.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 13 docs
Floor 153p · 2 filings · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Under Construction20p · 1 filing · 13 docs
Floor 8Under Construction16p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 44p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
Basement2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUMLEY HAFT4407/08/2026
17 EAST 12TH STREET1107/08/2026
1125 PARK AVENUE13903/22/2026
PARK 93RD OWNERS CORP C O103/22/2026
GUMMLEY HAFT INC103/22/2026
BROWN HARRIS STEVENS603/22/2026
OWNER OF 1125 PARK AVE CO103/22/2026
HIRSCH CONST. CO103/22/2026
AMG WATERROOFING LLC1703/22/2026
1125 PK AVE903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AGOUTI CONSTRUCTION CONSULTING2003/21/2026
BOYD CONSULTING1203/21/2026
CLARKE CONSTRUCTION CONSULTANTS403/21/2026
L & J DESIGN GROUP603/21/2026
BOUTIQKEY1003/21/2026
DOMANI CONSULTING203/21/2026
ANDRA CONSTANTIN EXPEDITER603/21/2026
OEF CONSULTANTS LLC803/21/2026
AE DESIGN SOLUTION403/21/2026
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHACRAFT CONSTRUCTION*General Contractor1907/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor907/08/2026
XINOS CONSTRUCTION CORPGeneral Contractor707/08/2026
JG HOME IMPROV NYC CORPGeneral Contractor707/08/2026
BALOG CONSTRUCTION LLCGeneral Contractor507/08/2026
ZACCO BUILDING CORPGeneral Contractor404/08/2026
BEK PLBG & HTG LLCPlumbing207/08/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor209/29/2026
HUDSON PLMBING & MCH, LLCPlumbing207/08/2026
TOMASZ PUZAElectrical203/21/2026
HITE CONSTRUCTION INCGeneral Contractor104/09/2026
RG DECORATING & PAINTINGGeneral Contractor107/08/2026
ABSOLUTE PLBG & HTG CORPPlumbing107/08/2026
BK PLUMBING & HEATING COPlumbing106/27/2026
EXPRESS PL SWR & WTR APlumbing107/08/2026
FIVE STAR P AND H CO, INCPlumbing107/08/2026
HENRY MYERS P & H, INCPlumbing106/28/2026
MACREDDIN PLBG & HTG INCPlumbing107/08/2026
M C M PLBG & HTG, INCPlumbing107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
TAP PLUMBING CORPPlumbing107/31/2026
ALMASI, FERENCElectrical103/21/2026
VELOCITY PLUMBING & HEATPlumbing107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
CHRISTOPHER EPPElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DTLS.ARCHITECTURE8388107/17/2026
BADALY ARCHITECT PLLC7137107/17/2026
OEF CONSULTANTS LLC3735401/26/2026
AK ENGINEERING PC678609/16/2025
TAN ENGINEERING, P.C.1291208/28/2025
CATALPA SPECIAL INSPECTIO2004108/21/2025
JAJ ENGINEERING PLLC930108/19/2025
JMV CONSULTING ENGINEERIN804710/07/2024
PIRO STUDIO LLC7503106/28/2024
PATRICK GERARD CARMODY, A2156106/27/2024
Building Lifecycle
All (289)Filed (49)Permit Issued (53)Signed Off (24)Facade (FISP) (12)Violation (60)Inspection (26)Objection (35)Special Inspection (30)
09/28/2026
Permit issued — General Construction
M01253524-I1-GC
07/30/2026
Permit issued — Plumbing
M01401948-S1-PL
07/28/2026
Permit issued — General Construction
M01401948-I1-GC
07/17/2026
Filed — Alteration
PL FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01401948-S1
07/17/2026
Filed — Alteration
PL FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01401948-I1
07/15/2026
Signed off — Alteration
Modifications to existing plumbing system in apartment #2D, as per plans filed herewith. No change to use, egress, or occupancy.
M01192057-S1
07/15/2026
Signed off — Alteration
Modifications to existing plumbing system in apartment #2D, as per plans filed herewith. No change to use, egress, or occupancy.
M01192057-I1
06/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2026
Signed off — Alteration
Apt. #7A, install new plumbing fixtures. No change in egress, occupancy, or use.
M01281977-S1
06/01/2026
Signed off — Alteration
Apt. #7A, install new plumbing fixtures. No change in egress, occupancy, or use.
M01281977-I1
05/19/2026
Signed off — Alteration
herewith file plumbing plans for Apt. 4A, filed in conjunction with general construction. (total SF of areas of work for plumbing is 181 sf)
M01243294-I1
05/19/2026
Signed off — Alteration
herewith file plumbing plans for Apt. 4A, filed in conjunction with general construction. (total SF of areas of work for plumbing is 181 sf)
M01243294-S1
05/13/2026
Special inspection requirement — Final
Mark Bearak
05/13/2026
Special inspection requirement — Post-installed Anchors
SHAHIN BADALY
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Mark Bearak
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mark Bearak
05/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Mark Bearak
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2026
Permit issued — General Construction
M01192057-I1-GC
01/26/2026
Filed — Alteration
Apt. #7A, install new plumbing fixtures. No change in egress, occupancy, or use.
M01281977-P2
01/23/2026
Filed — Alteration
Apt. #7A, install new plumbing fixtures. No change in egress, occupancy, or use.
M01281977-P1
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Omer Fenik
12/18/2025
Permit issued — General Construction
M01192057-I1-GC
11/25/2025
Permit issued — Mechanical Systems
M01253524-S2-MS
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/24/2025
Permit issued — Plumbing
M01253524-S1-PL
11/19/2025
Permit issued — General Construction
M01253524-I1-GC
11/14/2025
Permit issued — Plumbing
M01243294-S1-PL
10/24/2025
Objection resolved — Addressed
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
10/10/2025
Special inspection requirement — Final
Ari Kamo
10/08/2025
Permit issued — Plumbing
M01281977-S1-PL
10/08/2025
Permit issued — General Construction
M01281977-I1-GC
10/06/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01067341-I1
10/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2025
Objection resolved — Addressed
09/29/2025
Objection raised — Admin
09/25/2025
Permit issued — General Construction
M01243294-I1-GC
09/16/2025
Filed — Alteration
Modifications to existing plumbing system in apartment #2D, as per plans filed herewith. No change to use, egress, or occupancy.
M01192057-P2
09/16/2025
Filed — Alteration
Modifications to existing plumbing system in apartment #2D, as per plans filed herewith. No change to use, egress, or occupancy.
M01192057-P1
09/11/2025
Filed — Alteration
Apt. #7A, install new plumbing fixtures. No change in egress, occupancy, or use.
M01281977-S1
09/11/2025
Filed — Alteration
Apt. #7A, install new plumbing fixtures. No change in egress, occupancy, or use.
M01281977-I1
09/03/2025
Objection raised — Other
08/28/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBNG FIXTURES IN EXISTING APARTMENT 8B.
M01253524-S1
08/28/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBNG FIXTURES IN EXISTING APARTMENT 8B.
M01253524-S2
08/28/2025
Objection raised — Scope
08/28/2025
Objection resolved — Addressed
08/27/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01067341-S1
08/27/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01067341-S2
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
08/21/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBNG FIXTURES IN EXISTING APARTMENT 8B.
M01253524-I1
08/19/2025
Filed — Alteration
herewith file plumbing plans for Apt. 4A, filed in conjunction with general construction. (total SF of areas of work for plumbing is 181 sf)
M01243294-I1
08/19/2025
Filed — Alteration
herewith file plumbing plans for Apt. 4A, filed in conjunction with general construction. (total SF of areas of work for plumbing is 181 sf)
M01243294-S1
08/12/2025
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
07/28/2025
Special inspection requirement — Lighting in dwelling units
Rebecca Grunwald
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
07/28/2025
Special inspection requirement — Post-installed Anchors
Joseph Jabour
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Rebecca Grunwald
Latest 60 of 289 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHIGHLINE CONSTRUCTION GR09/28/2026
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP07/30/2026
DOB NOWGeneral ConstructionPermit IssuedEDY RESTORATION CORP07/28/2026
DOB NOWGeneral ConstructionSigned-offBALOG CONSTRUCTION02/10/2026
DOB NOWGeneral ConstructionSigned-offBALOG CONSTRUCTION12/18/2025
DOB NOWMechanical SystemsPermit IssuedAAMWAY SERVICE CO INC11/25/2025
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC11/24/2025
DOB NOWGeneral ConstructionPermit IssuedHIGHLINE CONSTRUCTION GR11/19/2025
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP11/14/2025
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP10/08/2025
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION10/08/2025
DOB NOWGeneral ConstructionSigned-offBHD GROUP LLC09/25/2025
DOB NOWPlumbingSigned-offBK PLUMBING & HEATING CO07/01/2025
DOB NOWGeneral ConstructionSigned-offBALOG CONSTRUCTION05/14/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP03/05/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP12/05/2024
DOB NOWPlumbingSigned-offM C M PLBG & HTG, INC09/30/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP09/09/2024
DOB NOWMechanical SystemsSigned-offZACCO BUILDING CORP08/13/2024
DOB NOWGeneral ConstructionSigned-offZACCO BUILDING CORP08/13/2024
DOB NOWMechanical SystemsSigned-offJG HOME IMPROV NYC CORP07/31/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP06/26/2024
DOB NOWPlumbingSigned-offBEK PLBG & HTG LLC03/14/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP03/05/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP02/23/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP12/07/2023
DOB NOWGeneral ConstructionSigned-offBALOG CONSTRUCTION11/30/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC11/14/2023
DOB NOWGeneral ConstructionSigned-offALPHACRAFT CONSTRUCTION*09/25/2023
DOB NOWGeneral ConstructionSigned-offALPHACRAFT CONSTRUCTION*09/25/2023
DOB NOWMechanical SystemsSigned-offALPHACRAFT CONSTRUCTION*09/25/2023
DOB NOWStructuralSigned-offXINOS CONSTRUCTION CORP07/31/2023
DOB NOWGeneral ConstructionSigned-offJG HOME IMPROV NYC CORP06/08/2023
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC05/31/2023
DOB NOWGeneral ConstructionSigned-offBALOG CONSTRUCTION05/26/2023
DOB NOWGeneral ConstructionSigned-offRG DECORATING & PAINTING05/24/2023
DOB NOWPlumbingSigned-offFIVE STAR P AND H CO, INC05/24/2023
DOB NOWPlumbingSigned-offBEK PLBG & HTG LLC04/22/2023
DOB NOWPlumbingSigned-offEXPRESS PLBG SWR & WTR MA03/01/2023
DOB NOWGeneral ConstructionSigned-offJG HOME IMPROV NYC CORP01/25/2023
+ 60 more permits on file
1 project · most recent 08/28/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2025Permit IssuedHIGHLINE CONSTRUCTION GRAir Conditioning Systems
Cooling
— TGC021TWEC-30K 29,900 BTU · Condensing Unit ×12
4 projects · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedTAP PLUMBING CORPGas, Water/Sanitary
01/26/2026Signed-offABSOLUTE PLBG & HTG CORPGas, Water/Sanitary
09/16/2025Signed-offBK PLUMBING & HEATING COGas, Water/Sanitary
08/28/2025Permit IssuedHENRY MYERS P & H, INCGas, Water/Sanitary
16 projects · most recent 08/03/2026
General Wiring
FiledStatusContractorScope
08/03/2026Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
07/09/2026CompleteKINGS ELECTRIC CO., INC.—
06/23/2026CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
01/23/2026Permit IssuedAPOLLO ELECTRIC INC.General Wiring
11/26/2025Permit IssuedAPOLLO ELECTRIC INC.—
10/06/2025Permit IssuedLENS ELECTRIC, INCGeneral Wiring
05/23/2025CompleteW 8 ELECTRIC CORPGeneral Wiring
09/08/2024CompleteMKU ELECTRIC CORPGeneral Wiring
05/17/2024CompleteALL CITY ELECTRICAL INCGeneral Wiring
03/01/2024CompleteBANNER ELECTRIC INCGeneral Wiring
08/28/2023CompleteMIDLAND ELECTRIC INCGeneral Wiring
05/25/2023CompleteBELMONT ELECTRICAL, INCGeneral Wiring
05/02/2023Permit IssuedELMAC ELECTRIC INC.General Wiring
02/12/2021CompleteA.X.M. ELECTRIC CORPGeneral Wiring
03/28/2019CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 01/30/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
01/30/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
06/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
05/13/2026Fire-Resistant Penetrations and JointsMark Bearakspecial
05/13/2026Fire-Resistance Rated ConstructionMark Bearakprogress
05/13/2026Energy Code Compliance InspectionsMark Bearakprogress
05/13/2026FinalMark Bearakprogress
05/13/2026Post-installed AnchorsSHAHIN BADALYspecial
01/22/2026Fire-Resistant Penetrations and JointsOmer Fenikspecial
10/10/2025Fire-Resistant Penetrations and JointsAri Kamospecial
10/10/2025FinalAri Kamoprogress
08/25/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
08/12/2025Post-installed AnchorsERIC BERLENTspecial
07/28/2025Fire-Resistant Penetrations and JointsJoseph Jabourspecial
07/28/2025Lighting in dwelling unitsRebecca Grunwaldenergy_progress
07/28/2025Energy Code Compliance InspectionsRebecca Grunwaldprogress
07/28/2025Post-installed AnchorsJoseph Jabourspecial
07/10/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
07/09/2025FinalRoger Tanprogress
07/09/2025Mechanical SystemsRoger Tanspecial
06/18/2025FinalRebecca Grunwaldprogress
10/09/2024HVAC-R and service water heating system controlsSETH HOWEenergy_progress
10/09/2024HVAC-R and service water heating equipmentSETH HOWEenergy_progress
10/09/2024Maintenance informationSETH HOWEenergy_progress
10/09/2024HVAC-R and service water piping design and insulationSETH HOWEenergy_progress
10/09/2024Mechanical SystemsJoseph Vutospecial
10/09/2024Post-installed AnchorsJoseph Vutospecial
10/09/2024FinalJoseph Vutoprogress
Latest 25 of 79.
▾Documents — 1,255 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch47
09/02/2026M00747421-I1Request digital key ↗
09/02/2026M00737076-I1Request digital key ↗
09/02/2026M00737076-P2Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00147766-I1Request digital key ↗
09/04/2026M00369101-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00147757-I1Request digital key ↗
▸Applications & Permits277
▸BISWORK PERMIT APPLICATION120
08/29/2019123894438Open ↗
08/26/2019123894438Open ↗
08/26/2019123894438Open ↗
Showing 3 of 120 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION115
08/13/2025100264116Open ↗
04/25/2024100264116Open ↗
01/31/2024100264116Open ↗
Showing 3 of 115 on file for this type
▸DOB NOWLPC Approval/Permit41
08/21/2026M01253524-P1Open ↗
08/16/2026M01401948-S1Open ↗
08/16/2026M01401948-I1Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/24/2020140977995Open ↗
▸Seals & Professional Certifications285
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION147
12/26/2019122912811Open ↗
12/26/2019122912811Open ↗
12/19/2019122912811Open ↗
Showing 3 of 147 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/05/2026M00147757-I1Open ↗
09/02/2026M00747421-I1Open ↗
09/02/2026M00737076-P1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/23/2026M08049933-I1Open ↗
09/14/2026M00737076-P2Open ↗
09/02/2026M00747421-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/23/2026M08049933-I1Open ↗
09/23/2026M08049933-I1Open ↗
09/23/2026M01253524-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
05/07/2019123026340Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/22/2019140849526Open ↗
05/07/2019123026340Open ↗
07/20/2018123484381Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/24/2020140977995Open ↗
05/22/2019140849526Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/22/2019140849526Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/24/2020140977995Open ↗
▸Trade Schedules & Equipment95
▸BISSCHEDULE B - PLUMBING31
09/03/2020123128533Open ↗
08/27/2020123128533Open ↗
08/14/2020123894438Open ↗
Showing 3 of 31 on file for this type
▸BISSELF-CERT PLUMBING NOTICE24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE24
05/23/2019123894438Open ↗
04/18/2019123484381Open ↗
08/13/2018123128533Open ↗
Showing 3 of 24 on file for this type
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes12
05/23/2019123894438Open ↗
05/07/2019123026340Open ↗
04/15/2019123704394Open ↗
Showing 3 of 12 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
05/23/2019123894438Open ↗
05/16/2019123704394Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00369101-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00482326-I1Open ↗
▸Environmental & Asbestos96
▸DOB NOWDEP ACP-5: Asbestos Assessment Report42
09/02/2026M00747421-I1Open ↗
09/02/2026M00737076-P1Open ↗
09/02/2026M00737076-P2Open ↗
Showing 3 of 42 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
08/13/2018123128533Open ↗
Showing 1 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/30/2019123704394Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/16/2026M01401948-I1Open ↗
08/16/2026M01401948-S1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/29/2019123894438Open ↗
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS36
09/13/2019123135357Open ↗
07/30/2019123704394Open ↗
07/09/2019122787608Open ↗
Showing 3 of 36 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS17
02/23/2022123704394Open ↗
11/23/2021123894438Open ↗
10/01/2020123128533Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
02/23/2022123704394Open ↗
12/09/2021123894438Open ↗
12/09/2021123894438Open ↗
Showing 3 of 14 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/24/2020140977995Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/02/2021123894438Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY20
01/30/2024100264116Open ↗
10/01/2022101658626Open ↗
10/01/2022101658626Open ↗
Showing 3 of 20 on file for this type
▸Approvals, Objections & Sign-offs102
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
02/25/2022123704394Open ↗
12/10/2021123894438Open ↗
10/01/2020123128533Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISLANDMARKS APPROVAL16
12/26/2019122912811Open ↗
09/13/2019123135357Open ↗
07/29/2019123894438Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER6
07/05/2019123128533Open ↗
03/06/2019123135357Open ↗
01/30/2019123128533Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF2
12/10/2021123894438Open ↗
10/29/2018123433445Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M00482326-I1Open ↗
▸Cost, Insurance & Ownership98
▸BISCOST AFFIDAVIT95
10/01/2022101658626Open ↗
02/23/2022123704394Open ↗
11/23/2021123894438Open ↗
Showing 3 of 95 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWELDERS AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/02/2021123894438Open ↗
▸Filing & Intake Forms103
▸BISEFILING COVER SHEET43
05/23/2019123894438Open ↗
05/23/2019123894438Open ↗
05/07/2019123026340Open ↗
Showing 3 of 43 on file for this type
▸BISADDITIONAL INFORMATION39
09/03/2020123128533Open ↗
08/21/2020123894438Open ↗
12/05/2019123026340Open ↗
Showing 3 of 39 on file for this type
▸BISBOROUGH INTAKE FORM16
12/26/2019122912811Open ↗
12/03/2019123026340Open ↗
09/13/2019123135357Open ↗
Showing 3 of 16 on file for this type
▸BISeFiling Job Application Cover Sheet5
11/24/2020140977995Open ↗
05/22/2019140849526Open ↗
Showing 2 of 5 on file for this type
▸Other Documents33
▸DOB NOWProof of Historic Building15
08/21/2026M01253524-P1Open ↗
08/13/2026M01253524-I1Open ↗
08/13/2026M00831400-P1Open ↗
Showing 3 of 15 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M00963207-P1Open ↗
08/13/2026M00963207-I1Open ↗
08/13/2026M00963207-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/13/2026M00963207-P1Open ↗
08/13/2026M00963207-I1Open ↗
08/13/2026M00963207-P3Open ↗
Showing 3 of 4 on file for this type